• 제목/요약/키워드: Ichthys CPF

검색결과 2건 처리시간 0.016초

초대형 부유식 해양구조물 탑재 플로팅 도크 계류안전성 연구 (Study on the Mooring Stability of Floating Dock with Ultra Large Offshore Structure)

  • 양승호;조진욱;김현조;김부기
    • 대한조선학회논문집
    • /
    • 제52권6호
    • /
    • pp.509-519
    • /
    • 2015
  • Mooring stability of floating dock for construction of Ichthys CPF (central processing facilities), an ultra large offshore structure, was studied. Normal and typhoon conditions were considered for mooring analysis. There have been changes in construction stages of the CPF as project progresses. These changes were reflected on the mooring stability analysis for both conditions. In order to secure the mooring stability of the floating dock for Ichthys CPF under typhoon, maximum loads of mooring chains and maximum offset of the floating dock with Ichthys CPF were examined. Also the shapes of the catenary mooring were investigated to check interferences among mooring chains. As it was confirmed that the mooring loads were within SWL (safe working load) of mooring chains and underwater sinkers, the mooring stability of the floating dock for construction of Ichthys CPF was secured. By achieving security of mooring stability of the floating dock, it is assured that Ichthys project is on its way to success.

ICHTHYS CPF(Central Processing Facility) LQ Piping Design 특이사항(유의사항) (Notice of LQ Piping Design for ICHTHYS)

  • 이재영;성현택
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2017년도 특별논문집
    • /
    • pp.46-53
    • /
    • 2017
  • We work for big offshore project in the Korean shipyards as a EPC contract. There are a lot of risks even though the FEED Engineering was taken in the famous engineering company. In case of ICHTHYS CPF, it worked on the FEED activity for several years. Here is mention that design modification was carried how to modify material and specification according to shipyards human resource and yard practice for your reference. Furthermore, I expect that this paper is used for Korean engineer for their reference.

  • PDF