• 제목/요약/키워드: ITS projects

Search Result 1,697, Processing Time 0.045 seconds

A study on the development of a web-based cost management system of building interior projects (웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구)

  • 송영규
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.3
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

Protection and Preservation of Clithon retropictus, Level II Endangered Species Declining due to Development Projects Carried out in its Habitat

  • Choi, Sang Duk;Jeon, Hong il;Myeong, No Yun;Choi, Sung Min;Lee, Cheol;An, Yun Keun
    • Korean Journal of Environmental Biology
    • /
    • v.36 no.2
    • /
    • pp.174-179
    • /
    • 2018
  • Clithon retropictus has been protected by the Ministry of Environment as an endangered species since 1998 and has been listed on the state red list of endangered species category II. It is viewed as a representative for all endangered species in the northeastern coastal waters of Korea. Most of the habitats of C. retropictus have been found to be in an unstable state because of development projects such as road construction, small stream development, irrigation for securing agricultural water, and flood prevention. These habitats are damaged by small stream maintenance projects and development, and the risk of damage is increasing and active efforts are needed in order to protect them. Although the Ministry of Environment is striving to preserve this endangered species, the habitat of C. retropictus is still facing external threats because it spreads to only a small area at high densities. Therefore, in order to protect the habitat of C. retropictus, a level II endangered species, it is urgent to make an effort to minimize habitat damage and to take measures for its protection.

Studies on Post Contract Schedule Analysis (준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구)

  • KIHYUK, KO;SUNGPIL, PARK;YONGKIL, KIM
    • Journal of Arbitration Studies
    • /
    • v.32 no.4
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.

Development Trends of Tidal Current Energy and Its Test Bed (조류에너지의 이용기술)

  • Yang, Changjo;Hoang, T.G.
    • Vacuum Magazine
    • /
    • v.3 no.2
    • /
    • pp.11-16
    • /
    • 2016
  • Tidal current energy is the most interesting renewable resources that have been less harnessed. Korea has globally outstanding tidal current energy resources and it is highly needed to develop a tidal current energy conversion system. It is reported that the total amount of available tidal current energy is approximately 6GW in Korea. A good tidal site candidate is required a large amount of fast moving water, bathymetry and seabed properties, no conflicts with other users and is close to a load and grid interconnection. In this review, we summarized the results of R&D projects regarding tidal current resources, utilization projects and demonstration test bed.

A Summary of Oil and Gas Development Projects on Sakhalin Offshore and Its Prospects (사할린 연안 유전개발 프로젝트 현황과 전망)

  • Im, Chae-Hwan
    • 연구논문집
    • /
    • s.28
    • /
    • pp.111-121
    • /
    • 1998
  • Offshore of Sakhalin Island is one of potential oil and gas development fields in Russia. American and Japanese companies are actively participating in the developments. They plan to export the produced oil and gas to East Asia including Korea, Japan and China. So far, offshore oil and gas field developments are mainly concentrated in the Russian Arctic area such as Barents Sea, Kara Sea and Tinman-Pechora Sea. In this article, the projects under development on the Sakhalin Shelf are reviewed and the environmental conditions in this area are summarized. At the end, the future prospects of the Sakhalin developments are reviewed.

  • PDF

An Earnest Dream for Survival Development of Housing / Urban area -Reflection on Rebuilt ann Redevelopment conducts- (살만한 집(건축) .살만한 도시로의 꿈)

  • 전상백
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.2
    • /
    • pp.12-17
    • /
    • 2000
  • The rebuilt and redevelopment projects conducted these days surely have invited overpopulation. Its one of the culprits is the municipal ordinances which allow the floor to site area ratio to increase from 200% to 400% in a decade and the adjacent distance ratio from 1.25 to 0.8 times of height of building. Possible solutions for the overpopulation problem are as below. - The floor to site area ratio should be regulated adaptively according to various regional localities. - Draw back the capital gains coming from a rebuilding project For evaluation process; - Select a suitable plan from plurality of proposals - Gradually encourage projects towards remodeling system in the near future

  • PDF

Estimating software development cost using machine-learning approach (학습이론을 이용한 소프트웨어 개발비 예측 모형)

  • Park, Chan-Kyoo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.345-355
    • /
    • 2005
  • As the portion of information systems(IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for quantitative and efficient management of IS budget. The primary concern in the cost estimation of IS projects is to estimate software development cost. In this paper, we propose a new method to estimate software cost using support vector regression(SVR), which has attracted considerable attention because of its good performance and theoretical clearness. The paper is the first study which apply SVR to software cost estimation.

  • PDF

MODIFIED SIMULATED ANNEALING ALGORITHM FOR OPTIMIZING LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • Po-Han Chen;Seyed Mohsen Shahandashti
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.777-786
    • /
    • 2007
  • This paper presents a modified simulated annealing algorithm to optimize linear scheduling projects with multiple resource constraints and its effectiveness is verified with a proposed problem. A two-stage solution-finding procedure is used to model the problem. Then the simulated annealing and the modified simulated annealing are compared in the same condition. The comparison results and the reasons of improvement by the modified simulated annealing are presented at the end.

  • PDF

A Study of Pre-assessment Framework for Business Environment for Delivering Projects in a New Overseas Market (해외 신규 시장의 프로젝트를 수행하기 위한 사업환경 사전조사 프레임웍에 관한 연구)

  • Oh, Jungkeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.78-90
    • /
    • 2015
  • Due to a significant decrease in the number of construction projects in the domestic market of Korea, overseas expansion of the Korean construction companies has been accelerated in recent years. However, the practice of bidding at a low price and lacking information about foreign new markets caused many companies to fail in their entries to these markets. As a measure to prevent such failures, this study has developed a framework which first defines the key research items that must be identified beforehand and then classifies them into a structured way so that the construction companies can actually use this framework to be better prepared for their forays into the new markets. The framework was actually applied for a construction project in Morocco, and its usefulness was proven by the user's successful participation into the project, nevertheless the application and result was limited. Although perhaps this framework should be applied to many more construction projects for its validity to be verified and for its structure to be better standardized, the framework still has its value due to the following two reasons: first, it has systemized the research items that had been only conceptually defined but had never been organized, and second it can be utilized as a investigation tool at the marketing stage.

Improving Construction Operations Through Applications of 6 Sigma Management Techniques for Superstore Projects (6시그마 기법의 적용을 통한 대형 할인점 공사의 시공성과 향상)

  • Lee, Seung-Hyun;Lee, Hang-Bok;Park, Chan-Sik;Hong, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.185-193
    • /
    • 2007
  • In order to improve the performance of succeeding superstore construction projects, it is essential to find out an effective way for applying the opportunities of improvement on their repetitive construction process based upon the analysis of various success or failure cases occurred on previous similar projects. This research study suggests a way to improve their construction process through the applications of six sigma techniques on superstore construction projects. A literature review was implemented on the basic concept of six sigma and its general performance steps, and the step by step applications of six sigma techniques were accomplished regarding to the speciality of superstore construction projects. The opportunities of improvement for superstore projects were figured out, and the result of their applications on other superstore projects was analyzed. As a result, it was found that the adoption rate of identical success or failure cases was increased. Also, there were several improvement effects on the projects such as $10{\sim}20$ days of time savings by projects, decrease of reworks by preventing failure cases, quality and safety improvement. These results indicate that the six sigma techniques are applicable and valuable for improving the repetitive process of superstore construction projects.