• 제목/요약/키워드: IT Project and Conflict

검색결과 128건 처리시간 0.031초

CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석 (Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method)

  • 이아연;장미경
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.

APPLICATION OF SPACE SYNTAX FOR PARTITION SEQUENCING OF WORKING SPACE IN BUILDING CONSTRUCTION

  • Li-Wen Wu;Sy-Jye Guo
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.573-582
    • /
    • 2007
  • Working spaces in the construction site are much more complicated than completed spaces in the building. There are many researches focus on partition of building spaces. However, few discussed partition sequencing in building construction sites. Space syntax is a set of techniques for analyzing spatial configurations. It has become a useful tool in a variety of researches. Partition sequencing of working spaces should be related to the working direction. However, with convex space and axial line, the partition sequencing became unrelated to the working direction. When critical space is blocked, the partition sequencing with axial line will be changed. It is significant to reveal the impact of the entire spatial structure when some of the working spaces are blocked. This paper discussed the improved partition sequencing theory and highlighted the importance of critical space and analyzed the spatial structure of working space. A real case project was demonstrated in this paper.

  • PDF

고속철도건설사업의 사회적 갈등에 관한 사례 연구 (A Case Study on Social Conflicts Of high speed Rail Construction Projects)

  • 추준섭;오주환;김시곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2442-2447
    • /
    • 2008
  • Concept of conflict management system and necessity of introducing it into the executing process of public projects have been subjects of any previous studies. Those systems are, however, not practically applicable to rail projects given the unique nature of rail industry. In this context, the author presented cases of conflicts emerged during the process of the Gyung bu High Speed Rail Construction Project and mapped out realistic case study applicable to construction sites.

  • PDF

팀 프로젝트 기반 교육이 컴퓨터 프로그래밍 학습효과에 미치는 영향요인 분석 (A Study on the Influencing Factors of the Team Project-based Computer Programing Education)

  • 장현성;김홍자
    • 컴퓨터교육학회논문지
    • /
    • 제22권2호
    • /
    • pp.39-50
    • /
    • 2019
  • 본 논문에서는 효과적인 컴퓨터 프로그래밍 학습을 위하여 팀 프로젝트 기반 학습을 설계하여 적용하고 학습효과에 미치는 영향을 분석하였다. 이론 강의 및 실습 최소화, 무작위 추첨에 의한 팀 구성, 각 팀원별 책임과 권한의 설정, 주어진 과제에 대한 경쟁 방식 문제 해결 프로젝트 진행, 팀 프로젝트가 끝날 때까지 매주 단계별 진행사항 발표를 통한 자연스러운 정보 공유 및 학습 사이클 반복 등을 통하여 학생들이 능동적으로 학습에 참여하는 모습이 관찰되었다. 과정 종료 후, 학습효과에 대한 분석을 위하여 학습자를 대상으로 설문조사를 실시하였으며, 그 결과 팀 프로젝트 기반 교육이 컴퓨터 프로그래밍 학습에 긍정적인 영향을 미치는 것으로 파악되었다. 본 논문에서는 도출된 요인 간 관계분석을 바탕으로 보다 효과적인 컴퓨터 프로그래밍 학습 방법을 논하고자 한다.

건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로- (Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-)

  • 김현승;문현석;최광열;김창학;강인석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.11-24
    • /
    • 2012
  • 최근 공공사업 발주조건에 BIM(Building Information Modeling)이 의무화되고 있고, 실무 도입을 통한 성공 사례가 증가되면서 건설 분야의 BIM 도입이 본격화되고 있다. 그러나 기존의 BIM 관련 연구는 대부분 설계 또는 시공단계에 한정되어 수행됨에 따라 건설프로젝트의 생애주기를 고려하지 못하고 있고, 특정 업무지원 기능 위주로 진행되고 있다. 따라서 본 연구에서는 건설공사 프로젝트의 기획부터 유지관리단계의 생애주기 동안 단계별 BIM 적용이 가능한 통합 BIM 운영 프로세스를 제안하고 이를 토대로 통합 BIM 시스템을 개발한다. 이를 위해 교량공사를 대상으로 수행단계별 정보체계를 분석하여 BIM 활용 기능과 적용 프로세스를 제시하였으며, 이에 근거하여 수행단계별 BIM 운영 시스템을 구축하였다. 연구에서는 개발된 시스템의 실무 적합성 검증을 위해서 사례적용과 건설 실무자의 활용성 설문 조사를 수행하였다. 이러한 BIM 통합 운영체계는 생애주기를 고려한 건설공사의 3차원 기반 통합정보관리체계로 활용성이 기대된다.

조력발전사업에서의 환경적 영향 분석을 통한 환경·사회적 갈등 저감방안 (Reducing Plan of Environmental and Social Conflicts for Tidal Power Plant through the Analysis of Environmental Impact)

  • 안세웅;이희선
    • 환경영향평가
    • /
    • 제21권5호
    • /
    • pp.789-799
    • /
    • 2012
  • The major causes of environmental and social conflicts were analyzed through the samples of the construction and the management for tidal power plant abroad and inland. Based on the results, the eco-friendly and socially acceptable policy instruments for decreasing the scope and intensity of the conflicts were explored. Regarding environment issues, it was found that the tidal power project resulted in decreasing in tidal range and area of intertidal zone and in damaging to tidal flat and wetland conservation area. Also there are the characteristic change of tidal current and biological effect, etc. The major environmental and social conflicts were resulted from the distrust of environmental results to environmental impact assessment and prior environmental review and the distrust of project feasibility study, and insufficient activities of public participation. In this study, introduction to joint fact-finding(JFF) was reviewed as the measure of minimizing environmental and social conflicts.

전력지원체계 획득조직 및 절차와 협업체계 발전방안 연구 (A Study on the Organization and Procedures for Acquiring Power Support System and the Development of Collaborative System)

  • 추교준;최명진
    • 산업경영시스템학회지
    • /
    • 제46권4호
    • /
    • pp.304-311
    • /
    • 2023
  • The 4th Industrial Revolution and the continuous development of Science and Technology have also required a speedy business promotion method in the defense industry. Advanced countries including the United States are already boldly innovating the existing high-cost and long-term acquisition system with the highest priority in weapons development to cope with the military rise of Russia and China. The Ministry of National Defense and the Defense Acquisition Program Administration have also recently introduced a quick acquisition system and are applying it to business promotion. In addition, some small-scale projects and weapons systems are being reorganized so that they can be managed by the units demanding them. After an organizational diagnosis of the Project Acquisition Group by the Ministry of National Defense in 2020, it has been reassigned as a subordinate unit of the Army Logistics Command from a direct unit managed by the Army HQ. As a result, problems such as work conflict or redundancy have been identified. In addition, a system has been implemented to shorten the acquisition period by applying a rapid acquisition program in the field of weapons systems by benchmarking the rapid acquisition program of advanced countries. The force support system project process will also need to introduce such a quick acquisition system. In addition, the Ministry of National Defense is considering ways to delegate some weapon systems to each military, which will then carry out tasks ranging from requirements determination to project management. Accordingly, it is now time to expand the organization for the management of the Army's weapons system acquisition project. Therefore, in this paper, the Army Project Acquisition Group was analyzed on its organization, acquisition procedures, and cooperation systems, with presentations of development plans for each field.

A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.163-168
    • /
    • 2013
  • A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

  • PDF

MCDA 기법을 이용한 댐사업의 투자우선순위 결정 (Investment Ranking Decision Using MCDA in Dam Projects)

  • 김우구;이광만;박두호
    • 한국수자원학회논문집
    • /
    • 제39권12호
    • /
    • pp.1067-1080
    • /
    • 2006
  • 공공사업이나 공공의 목적으로 제공되는 재화의 경험적 평가에 있어 다기준의사결정기법은 광범위한 평가기준을 고려할 수 있기 때문에 의사결정권자에게 적절한 의사결정 도구를 제공하였다. 대립관계문제의 의사결정 방법으로 다기준의사결정기법은 도로, 댐 및 항만건설 등 공공사업 분야에서 이의 유용성을 입증하였다. 본 연구에서는 다기준의사결정기법의 장점을 활용하기 위하여 사회, 경제, 환경 및 사업실현성 측면에서 댐 사업 평가지표를 수자원의 지속가능성에 바탕을 두고 개발하고, 설문조사를 통하여 지표의 중요도를 도출하였다. 사업투자우선순위결정을 위하여 개발된 평가지표를 실제 재개발을 위하여 조사중인 6개의 기존 댐에 적용하였다. 아울러 근래 공공사업의 추진과정에서 문제점으로 나타나고 있는 지자체 및 지역주민의 동의와 협조가 사업시행의 핵심인 점을 고려하여 사업실현성이 경제성, 환경성 및 사회성과 마찬가지로 중요한 요소임을 알 수 있었다.