• 제목/요약/키워드: IT Project Model

검색결과 2,009건 처리시간 0.03초

UML기반의 공공부문 정보화프로젝트관리모델에 관한 연구 (A Prefect Management Model for Developing Information Systems in Public Sector with UML)

  • 옹상순;최재현;박제원;이남용
    • 한국IT서비스학회지
    • /
    • 제8권3호
    • /
    • pp.101-109
    • /
    • 2009
  • For half a century, PMM(Project Management Model) continually has been advanced by many researchers and managers. Especially, the model for civil and construct engineering has now high maturity, but the model for IT engineering has not acceptable maturity. PMI(Project Management Institute) provides the knowledge of protect management for general purpose, it is not adequate for IT prefect management without complements. In this paper, we propose IT project management model based the knowledge of PMI using UML. IT project management model provides not only functions for project planning, budgeting, design and Implement, but also the knowledge for managing IT protect efficiently. We use uses case diagrams to describe the details of the model. We expect the model to be used in management of IT project efficiently in public sector.

A Portfolio Model for National IT R&D Strategy Project Selection Methods

  • Ryu, Dong-Hyun;Lee, Woo-Jin
    • Journal of information and communication convergence engineering
    • /
    • 제9권5호
    • /
    • pp.491-499
    • /
    • 2011
  • In this paper, we offer a new strategic portfolio model for national IT R&D project selection in Korea. A risk and return (R-R) portfolio model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R portfolio model to solve the non-strategy and subjectivity problems of the existing national R&D project selection model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technical level reports (TLR) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic portfolio project and balancing the allocation of resources effectively and objectively.

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

정보시스템 감리점검항목을 활용한 프로젝트 조직성숙도 평가 모델의 설계 (Design of a Project Management Maturity Evaluation Model using Information System Audit Checklists)

  • 김윤석;조은애;백두권
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제35권2호
    • /
    • pp.105-117
    • /
    • 2008
  • 일반적으로 프로젝트 감리는 프로젝트 관리 점검 항목을 기반으로 정보 시스템 프로젝트의 관리 활동을 검토하고 문제점을 지적하여 개선 사항을 반영하게 함으로써 프로젝트를 성공적으로 수행하기 위한 관련 서비스를 제공하고 있으며, 프로젝트 수행 조직은 프로세스 기반의 조직 성숙도 모델들을 적용하여 프로젝트를 관리하고 있다. 그러나, 실제 프로젝트 수행 단계에서는 기대 만큼 효과가 크지 않다. 본 논문에서는, 이를 해소하기 위한 방안으로 프로젝트감리검토항목을 조직 성숙도 모델 설문 항목과 연계하여 조직 성숙도 평가 모델을 설계함으로써 감리 결과뿐만 아니라 프로젝트 전이나 이후에도 평가를 가능하게 하여 프로젝트 발주기관 및 개발 기관의 프로젝트 평가와 프로젝트 수행에 대한 조직 수준의 평가를 통해 프로젝트 수행 역량 개선이 가능한 모델을 제시하였다.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

A Simulation Model Construction for Performance Evaluation of Public Innovation Project

  • 고찬
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2006년도 춘계학술대회
    • /
    • pp.87-109
    • /
    • 2006
  • The purpose of this paper is to examine the present performance evaluation methods and to make Monte Carlo Simulation Model for the IT-based Government innovation project. It is suggested the proper ways in applying of Monte Carlo Simulation Model by integration of present evaluation methods. It develops the theoretical framework for this paper, examining the existing literature on proposing an approach to the key concepts of the economic impact analysis methods. It examines the actual conditions of performance evaluation focusing on the It-based Government Innovation project. It considers how the simulation model is applied to the performance management in the public innovation project focusing on the framework, process and procedure of performance management.

  • PDF

DB 품질개선사업의 대가 산정 모형연구 (A Development of Cost Estimation Model for Data Quality Analysis and Improvement Project)

  • 서용원;이덕희;정승호;박건수
    • 한국IT서비스학회지
    • /
    • 제14권2호
    • /
    • pp.51-68
    • /
    • 2015
  • As interests in the quality of data in database systems are growing recently, analysis and improvement of data quality in databases have been an important issue. However, there has yet to be a clear agreement on how to reasonably calculate the total cost of such project. In this paper, based on real project data and budget statistics, we develop a model to estimate the cost for quality analysis and improvement project of a database. We first conduct statistical analysis to build our basic model. Throughout this analysis, we have identified factors that determine the scale of works required to conduct the project and eventually determine the cost. In addition, we have identified factors that determine the complexity of the project. These factors can adjusts the cost determined by the scale of works. Our model is verified and improved by surveys on experts. We apply our model to newly conducted projects and observe that our model estimates the cost of each project reasonably well.

e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발 (A Qualitative Approach to eIT Project Management)

  • 정기호
    • 한국IT서비스학회지
    • /
    • 제1권1호
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

Development of an Elaborated Project-Based Learning Model for the Scientifically Gifted

  • KIM, Hyekyung;CHOI, Seungkyu
    • Educational Technology International
    • /
    • 제11권1호
    • /
    • pp.171-192
    • /
    • 2010
  • This study was to investigate the elaborated project based learning model for scientifically gifted in the context of R & E project learning. It is important for the scientifically gifted to provide the appropriate learning environments instead of general learning model for the gifted. Although R & E project learning model is effective, the model has the limitations of managing the course for the scientifically gifted. To improve R & E learning model, the elaborated project based learning model was suggested with integration of both project based learning model and goal based scenario. The elaborated project-based learning model was comprised with 'basic learning process', 'elaboration through inquiry', and 'presentation and reflection'. To measure the satisfaction, eighty scientifically gifted students participated in the class. The result shows that learners were satisfied with the elaborated project-based learning up to 90%, and teachers were satisfied with this model up to 77%.

국가 IT R&D 전략과제 선정 모형개발 (Development of an Strategic Model for the Selection of a National IT R&D Strategic Project)

  • 류동현;박정용;이우진
    • 한국정보통신학회논문지
    • /
    • 제15권3호
    • /
    • pp.501-509
    • /
    • 2011
  • 본 논문은 국가 정보통신(IT)분야 연구개발(R&D)사업에 대한 전략과제를 선정하기 위한 모형을 제시한 것으로 우리나라 정부의 New IT R&D정책인 Smile-curve에 맞는 전략과제 선정을 위해 포트폴리오 모형을 적용하였으며, 포트폴리오 모형 중에서 정부정책의 효과적 반영을 위해 일반적인 R-R(Risk-Return) 포트폴리오 모형을 국가 R&D 체계에 맞게 개발 적용하였다. 또한, R-R 포트폴리오 모형의 평가항목 중 평가항목의 객관성 확보를 위해 TRM(기술로드맵)과 TLS(기술수준조사)자료의 항목을 사용하였으며, AHP(계층화분석)를 통하여 국가전략성, 시장성, 기술성 등 평가항목별 가중치를 설정함으로써 국가 R&D전략과의 연계성을 강화하였다. 또한, 본 모형을 국가 IT R&D 전략과제 선정에 적용한 결과 의미 있는 검증값이 나왔으며, 사업선정단계에서부터 사업의 불확실성을 줄이고 성공률을 높이는 전략과제를 선정하는데 기여하고자 한다.