• Title/Summary/Keyword: IMHA

Search Result 183, Processing Time 0.025 seconds

Adsorptive Removal Properties of Heavy Metal Ions By Soils from the Upper Banbyun Stream (반변천 상류 주변 토양의 중금속 이온 흡착제거 특성)

  • Kim, Younjung;Hwang, Haeyeon;Kim, Yunhoi;Ryu, Sanghoon;Baek, Seungcheol;Seo, Eulwon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.2
    • /
    • pp.5-9
    • /
    • 2007
  • This study carried out to investigate the removal capacity of heavy metals such as Cu (II), Zn (II) and Cd (II) dissolved in aqueous solution in the soils collected from Hyeon-Dong (HD), San-seong (SS), Keum-chon (KC) and Keum-Hac (KH) located in the upper Banbyun stream. The pH of all the soils was weak alkali such as 8.8 9.2. According to the analysis of chemical composition of the soils, the amount of $SiO_2$, $AlO_2$ and CaO were similar in all tested soils. However, the amount of $K_2O$, $FeO_3$ and MgO were different from each soil. The XRD measurement with these soils showed that quartz and feldspar were presented in all tested soils, and the distribution of kaoline, illite, montmorillonite, vermiculite and calcite were different from each soil. The results of the removal capacity of heavy metals indicated that all the soils had more than 98% of the removal efficiency of Cu (II), Zn (II) and Cd (II), and among the heavy metals, Cu (II) was removed the most effectively. These results suggested that the soils collected from the upper Banbyun stream have the high removal capacity of heavy metals, and these soils could be used for the banking a river around the abandoned mine area, containing the higher concentrations of heavy metals than the usual stream.

  • PDF

Impact of Turbidity on Protected Plants along River Levees (탁수가 하천 제방보호 식물에 미치는 영향 분석)

  • Kim, Jong-Tae;Kim, Eun-Jin;Kang, Joon-Gu;Yeo, Hong-Koo
    • The Journal of Engineering Geology
    • /
    • v.23 no.2
    • /
    • pp.161-170
    • /
    • 2013
  • We analyzed the effect of changing water level and turbidity on plants that serve to maintain slope stability on levees. In this experiment, soil collected from upstream of Imha Dam was placed in a water tank and planted with river plants of the Salix species: Salix gracilistyla, S. koreensis, and S. glanduosa. Plant regrowth was analyzed stage-by-stage during a recovery period. In addition, we assessed the tolerance of the plants to concentrated torrential rainfall and examined their recovery rates. The results indicate that in the case of these three Salix species, which are the most prevalent river plants in Korea, stem growth is arrested following serious damage and high turbidity. The possibility of regrowth was very low during the 20-day non-submerged recovery period. Although the number of leaves initially decreased during this period, subsequent regrowth was reasonably high: recovery in S. gracilistyla, S. koreensis, and S. glanduosa was up to 59.3%, 251.3%, and 148.4% respectively, compared with the initial condition.

Analysis of Nonpoint source Reduction at Andong Area Considering Changes in CN (CN의 변화에 따른 안동시 물순환 선도도시 조성계획의 비점오염부하 저감효과 분석)

  • Kwon, Heongak;Jung, Kangyoung;Kim, Shin;Shin, Sukho;Ahn, Jungmin;Kim, Gyeonghoon
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.342-349
    • /
    • 2016
  • Andong belongs to the Nakdong River Basin, Nakdong River is flowing through the city, including Andong dam and Imha dam. The runoff due to provincial transfer and impervious area has been increasing by urbanization increases and nonpoint source loads. In this study, we evaluate the runoff and nonpoint pollution loads in accordance with the development targeted at selected urban water cycle leading to Andong city. Andong city leading to the water cycle plan to evaluate the directly runoff and BOD, T-N and T-P nonpoint pollutant loads using the CN into account the temporal and spatial changes. Evaluation, direct runoff per year is 10.41 % if the green roof and a water permeable pavement replacement, water cycle parks and streets compositions, City impermeable layer improvements to be business including four kinds of scenario is applied to both the development and the BOD non-point pollutant loads 20.56%, T-N 9.55% and T-P pollution and nonpoint loads was investigated to be reduced 14.29%. Four kinds of low lapse rate of the development scenario of the highest thing urban impervious surface was investigated by improving business development prior year annual direct runoff is 6.25 %, BOD nonpoint pollution loads are 11.84%, T-N nonpoint pollution loads are 4.46 % and T-P was investigated by reducing pollutant loads to be 10.20%.

A Stiudy on the Deveplopment of Algorithm for the Representative Unit Hydrograph of a Watershed as a Closed Linear System. (폐선형계로 본 유역대표 단위유량도의 유도를 위한 알고리즘의 개발에 관한 연구)

  • 김재한;이원환
    • Water for future
    • /
    • v.13 no.2
    • /
    • pp.35-47
    • /
    • 1980
  • An algorithm is developed to derive a representative I hr-unit hydrograph through an analysis of rainfall-runoff relations of a watershed as a closed system. For the base flow seperation of a flood hydrograph the multi-deflection method is proposed herein, which gace better results compared with those by the existing empirical methods. A modified $\Phi$index method is also proposed in this stidy to determine the time distribution rainfall excess of a rainstorm, which is essetially a modification of the commonly used $\Phi$index method of rainfall seperation. With the so-obtained rainfall excess hyetograph and the direct runoff hydrograph a trial and error computation of the ordinates of 1 hr-unit hydrograph was executed in such a manner that the synthesized flood hydrograph closely approximates the observed one, thus resulting a unit hydrograph of a piecewise exponential function type. To verify the validity of this study the 1 hr-unit hydrographs for the Imha and Dongchon in Nagdong River basin, and Yongdam in Geum River basin were derived by this algorithm, and the results were compared with those by the conventional synthetic unit hydrograph method and the Nakayasu method. Besides, the validity of this stiudy was also tested by comparing the observed hydrograph with the one computed by applying the unit hydrograph to a specific rainfall event. To generalize the result of this study a computer program, consisited of a main and three subprograns (for rainfall excess estimation, convolution summation, and sorting), is developed as a package, which is believed to be applicable to other watersheds for the similar purpose as those in this study.

  • PDF

Spatial Influences of Flood Controls in Dam Operations (댐의 홍수조절에 대한 공간적 영향 분석)

  • Jung, Yong;Kim, Nam Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.407-415
    • /
    • 2018
  • This study analyzed the role of dams for the flood control by the observed and simulated hourly flood discharge data. The study area was the Nakdong river basin with Andong and Imha dams. For the analysis 31 flood events from 1997 to 2010 were selected. In the analysis of the flood reduction rate (FRR) of dam itself, the FRR was not decreased with higher size of floods which is not as we expected. In order to see the trend of flood reduction rate depending on the flood size, flood discharge volume presents it better than peak flood discharge. In the comparison of the flood reduction effects of the two dams, Andong dam has 7% larger flood reduction influence at the Sungju gauging station (SGS) located farthest from the selected watershed. Comparing the ratio of the watershed area based on the covered size of the SGS, the FRR of dam is smaller than the area rate. The impact of FRR of dam showed that the FRR fell below 10% when reaching the size of watershed area corresponding to 8.5 times of the size of watershed area of the dam which is larger than Namhan river basin (7 times).

Analysis of Emergency Water Supply Effects of Multipurpose Dams Using Water Shortage Index (용수부족지표를 이용한 다목적댐의 비상용수 공급 효과 분석)

  • Lee, Gwang-Man;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.11
    • /
    • pp.1143-1156
    • /
    • 2012
  • One of the important purposes of most water resources systems is to prevent from drought damages. However, there are uncertainties in water supply plans from a reservoir due to factors such as limitation of available data, inaccuracy of surveyed data, unsuitability of analysis method, and climate change. In actual operating process, severe drought exceeding the water supply capability makes the normal water usage difficult. In Korea, however, alternative water source such as a development of new water project is very limited in case of water shortages due to drought. Especially, since there is no standard to evaluate the water supply effect considering severe drought damages, it is difficult to prepare the practical measures. In this study, water shortage events of existing multipurpose reservoirs are analyzed and the method of using low-storage emergency water supply is studied by using Water Shortage Index (WSI). The water shortage events are analyzed and the effect of water shortage decrease is evaluated using the existing inflow data of multi-purpose reservoirs. The results show that Imha, Daechung, Hapchon and Namkang reservoirs are highly vulnerable to the severe drought and required to develop additional emergency water source.

A Study to Develop Monthly Cover Management Factor Database for Monthly Soil Loss Estimation (월단위 토양유실가능추정치를 위한 지표피복인자의 산정 방안 연구)

  • Sung, Yun Soo;Jung, Yunghun;Lim, Kyoung Jae;Kim, Jonggun;Kim, Ki-Sung;Park, Seung Ki;Shin, Min Hwan;Kum, Dong Hyuk;Park, Youn Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.6
    • /
    • pp.23-30
    • /
    • 2016
  • Soil loss is an accompanying phenomenon of hydrologic cycle in watersheds. Both rainfall drops and runoff lead to soil particle detachment, the detached soil particles are transported into streams by runoff. Here, a sediment-laden water problem can be issued if soil particles are severely detached and transported into stream in the watershed. There is a need to estimate or simulate soil erosion in watersheds so that an adequate plan to manage soil erosion can be established. Universal Soil Loss Equation (USLE), therefore, was developed and modified by many researchers for their watersheds, moreover the simple model, USLE, has been employed in many hydrologic models for soil erosion simulations. While the USLE has been applied even in South-Korea, the model is often regarded as being limited in applications for the watersheds in South-Korea since monthly conditions against soil erosion on soil surface are not capable to represent. Thus, the monthly USLE factors against soil erosion, soil erodibility and crop management factors, were established for four major watersheds, which are Daecheong-dam, Soyang-dam, Juam-dam, and Imha-dam watersheds. The monthly factors were established by recent fifteen years from 2000 to 2015. Five crops were selected for the monthly crop management factor establishments. Soil loss estimations with the modified factors were compared to conventional approach that is average annual estimations. The differences ranged from 9.3 % (Juam-dam watershed) to 28.1 % (Daecheong-dam watershed), since the conventional approaches were not capable of seasonally and regionally different conditions.

Derivation of the Instantaneous Unit Hydrograph and Estimation of the Direct Runoff by Using the Geomorphologic Parameters (지상인자에 의한 순간단위도 유도와 유출량 예측)

  • 천만복;서승덕
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.32 no.3
    • /
    • pp.87-101
    • /
    • 1990
  • The purpose of this study is to estimate the flood discharge and runoff volume at a stream by using geomorphologic parameters obtained from the topographic maps following the law of stream classification and ordering by Horton and Strahier. The present model is modified from Cheng' s model which derives the geomorphologic instantaneous unit hydrograph. The present model uses the results of Laplace transformation and convolution intergral of probability density function of the travel time at each state. The stream flow velocity parameters are determined as a function of the rainfall intensity, and the effective rainfall is calculated by the SCS method. The total direct runoff volume until the time to peak is estimated by assuming a triangular hydrograph. The model is used to estimate the time to peak, the flood discharge, and the direct runoff at Andong, Imha. Geomchon, and Sunsan basin in the Nakdong River system. The results of the model application are as follows : 1.For each basin, as the rainfall intensity doubles form 1 mm/h to 2 mm/h with the same rainfall duration of 1 hour, the hydrographs show that the runoff volume doubles while the duration of the base flow and the time to peak are the same. This aggrees with the theory of the unit hydrograph. 2.Comparisions of the model predicted and observed values show that small relative errors of 0.44-7.4% of the flood discharge, and 1 hour difference in time to peak except the Geomchon basin which shows 10.32% and 2 hours respectively. 3.When the rainfall intensity is small, the error of flood discharge estimated by using this model is relatively large. The reason of this might be because of introducing the flood velocity concept in the stream flow velocity. 4.Total direct runoff volume until the time to peak estimated by using this model has small relative error comparing with the observed data. 5.The sensitivity analysis of velocity parameters to flood discharge shows that the flood discharge is sensitive to the velocity coefficient while it is insensitive to the ratio of arrival time of moving portion to that of storage portion of a stream and to the ratio of arrival time of stream to that of overland flow.

  • PDF

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works ( I )-Recovered Benefits of Water Supply and Hydropower Generation (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (I) -용수공급 및 발전생산 회복편익)

  • Lee, Gwang-Man;Lee, Eul-Rae;Yoo, Seung-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.753-763
    • /
    • 2011
  • Allocated water storage of dam at the planning and design stage does not seem to be maintained well at the operation stage because of unexpected critical reasons. A dam is likely to be subject to negative effects caused by changes of dam operation conditions and it is hardly avoidable. Therefore, it must be timely improved to recover its original functions and looked for better alternatives to keep its original roles. Specifically the improper management of river condition degrades flood control capability in a dam and river eco-system. The dam downstream river improvement work is needed for normalizing dam functions and its valuations. This study focuses on estimating water use benefits from recovering its own effective storage buffer restricted for flood control. As the results, the water supply and the hydropower benefits in Imha, Daechung and Youngdam Dam are recovered totally by 19.9 million $m^3$/year and 20.8 GWh/year respectively. Also those results are used for the basic information of the economic analysis in the dam downstream river improvement work.