• Title/Summary/Keyword: IEC61850

Search Result 214, Processing Time 0.045 seconds

Testing Items Change on Characteristics of Protective relays (보호계전기 특성시험기술의 시험항목 변화)

  • Jang, Byung-Tae;Lee, Nam-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.161-162
    • /
    • 2008
  • The steady state performance test for the digital protective relay using general relay test equipment has been main test methods. Because of the development of advanced power system testing equipments, dynamic performance test has been carried out additionally using a digital simulator such as RTDS(Real Time Digital Simulator). For the case of newly adopted digital protective relay with IEC 61850 and network, performance testing items need supplementing. This report displays testing items change according to newly protective relay.

  • PDF

The application Cases of the 154KV Digital Substation Engineering (154kV 디지털변전소 엔지니어링 적용사례 연구)

  • Chang, Seok-jun;Kim, Jae-Youl
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.557-558
    • /
    • 2015
  • IED와 상위운영시스템(정보연계장치 포함)으로 구성되는 디지털변전소의 변전자동화시스템은 계측/제어/보호/감시 등 모든 변전소의 정보의 흐름이 국제규격 IEC 61850 기반으로 네트워크 통신을 통해 이루어지는 시스템이다. 따라서 기존 제어케어블 사용시 변전소에서 신호 전달의 정확성을 위해 측정하였던 전기적 신호에 대한 점검을 대신하여, 디지털변전소의 데이터를 운송하는 혈관의 역할을 수행하는 네트워크 통신에 대한 건전성을 확인할 필요가 있다.

  • PDF

A Study on Substation Automation in Power System (전력계통의 변전소 자동화에 대한 연구)

  • Moon, Hyoung-Bae;Lim, Seong-Joo;Lee, Sang-Joong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.119-124
    • /
    • 2005
  • The deregulation of energy market, together with structure reorganization of vertically integrated companies in electrical utility requires efficient and reliable substation automation system. The problem of non-standards where other countries suffer through the SA points could be settled using IEC 61850 and hereby the coming SAS project can realize the system that characterize the telecommunication standards and function integration.

  • PDF

Protection, Monitoring & Control of KEPCO Power System by SA (변전 자동화를 통한 한국전력 계통의 보호, 제어감시)

  • Jang, Sung-Ik;Min, Byeong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.699-700
    • /
    • 2007
  • 변전소 보호, 제어, 감시와 자동화 능력을 선진화하면서 송변전설비 건설, 보수, 운영 및 관리비용을 확실하게 줄이기 위한 계획과 노력이 진행 중이다. 세계적인 전력설비의 IT화 추세와 변전자동화(Substation Automation)전용 국제통신규격(IEC-61850) 기반 조성으로 차세대 변전시스템 개발의 효율성 증대 되므로 한국전력 계통에 시범 사업에 적용하여 선진기술을 도입하여 계통 보호와 제어 감시의 사례를 검토한다.

  • PDF

Interoperability Test of the Digital Substation using IED Conformance Testing System (IED 적합성 시험장치를 이용한 디지털 변전소 상호운용성 시험)

  • Lee, N.H.;Jang, B.T.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.11-12
    • /
    • 2007
  • In order to verify a digital substation based on IEC 61850, KEPRI in charge of POWER IT project related to SAS has constructed IED conformance testing system, which consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator, and performed the interoperability test between two IEDs made by other vendors. The test was proceeded based on SCL and with system integrated tools

  • PDF

RLP : An Efficient HSR Traffic Reduction Algorithm

  • Nsaif, Saad Allawi;Jun, Je Hyun;Shin, Sang Heon;Rhee, Jong Myung
    • Journal of Satellite, Information and Communications
    • /
    • v.7 no.3
    • /
    • pp.47-53
    • /
    • 2012
  • In this paper, we present an algorithm called redundant logical paths (RLP) for efficient HSR traffic reduction. It creates redundant logical paths between each HSR node and all the other nodes. Eventually, a logical full-meshed network or paths will be established among all HSR node types, except the Quadbox type, which is used only for interconnection. The logical full-meshed network will be used instead of using the standard HSR protocol that depends on the concepts of the duplication and forwarding of the received frame until it reaches the destination node. The RLP algorithm results in significantly less frame traffic because there is no random forwarding as in the standard HSR protocol. For the sample network in this paper simulation results showed a 61.5-80% reduction in network frame traffic compared to the standard HSR. Our algorithm will avoid latency issues in the network and even network congestion, thus improving network efficiency.

Development of Intrusion Detection System for GOOSE Protocol Based on the Snort (GOOSE 프로토콜 환경에서 Snort 기반의 침입 탐지 시스템 개발)

  • Kim, Hyeong-Dong;Kim, Ki-Hyun;Ha, Jae-Cheol
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.23 no.6
    • /
    • pp.1181-1190
    • /
    • 2013
  • The GOOSE(Generic Object Oriented Substation Event) is used as a network protocol to communicate between IEDs(Intelligent Electronic Devices) in international standard IEC 61850 of substation automation system. Nevertheless, the GOOSE protocol is facing many similar threats used in TCP/IP protocol due to ethernet-based operation. In this paper, we develop a IDS(Intrusion Detection System) for secure GOOSE Protocol using open software-based IDS Snort. In this IDS, two security functions for keyword search and DoS attack detection are implemented through improvement of decoding and preprocessing component modules. And we also implement the GOOSE IDS and verify its accuracy using GOOSE packet generation and communication experiment.

RMT: A Novel Algorithm for Reducing Multicast Traffic in HSR Protocol Networks

  • Nsaif, Saad Allawi;Rhee, Jong Myung
    • Journal of Communications and Networks
    • /
    • v.18 no.1
    • /
    • pp.123-131
    • /
    • 2016
  • The high-availability seamless redundancy (HSR) protocol is one of the most important redundancy IEC standards that has garnered a great deal of attention because it offers a redundancy with zero recovery time, which is a feature that is required by most of the modern substation, smart grid, and industrial field applications. However, the HSR protocol consumes a lot of network bandwidth compared to the Ethernet standard. This is due to the duplication process for every sent frame in the HSR networks. In this paper, a novel algorithm known as the reducing multicast traffic (RMT) is presented to reduce the unnecessary redundant multicast traffic in HSR networks by limiting the spreading of the multicast traffic to only the rings that have members associated with that traffic instead of spreading the traffic into all the network parts, as occurs in the standard HSR protocol. The mathematical and the simulation analyses show that the RMT algorithm offers a traffic reduction percentage with a range of about 60-87% compared to the standard HSR protocol. Consequently, the RMT algorithm will increase the network performance by freeing more bandwidth so as to reduce HSR network congestion and also to minimize any intervention from the network administrator that would be required when using traditional traffic filtering techniques.

Performance verification and test for substation automation system (변전자동화 시스템 성능검증 및 실증시험)

  • Jang, B.T.;Choi, C.Y.;Kim, B.H.;Park, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.258-259
    • /
    • 2006
  • 국내외적으로 전력산업분야의 가장 큰 화두중 하나는 변전소 단위의 디지털화이며 특히 국외에서는 국제표준 변전자동화 시스템 연구와 제품개발 등에 인력을 집중 투자하고 있다. 국제적으로 지금까지 축적된 변전소 관련 제반 기술력 및 경험 둥을 바탕으로 전 세계적으로 단일화시키고 표준화된 변전소 자동화 규격인 IEC 61850 (Communication networks and systems in substations) 규격이 제정되었으며 따라서 향후 전력 관련 기업은 시스템 엔지니어링 기술, 전력기기 공급능력, 유지/보수/운영기술 등을 종합적으로 보유하고 자산 및 위험관리를 종합적으로 제공할 수 있어야만 세계시장에서 생존할 수 있다. 또한 전력기기를 수출하는 국내업체는 향후 IEC(International Electrotechnical Commission) 등 국제표준에 따른 전력설비를 개발하지 않으면 수출경쟁력을 잃게 될 것이다. 이러한 세계화 추세에 발맞추어 한국전력공사와 관련 업체들은 공동으로 2005년 10월부터 6년의 기간으로 "디지털 기술기반의 변전소 자동화 시스템 개발" 사업을 진행 중에 있으며 특히 한국전력공사는 변전자동화 시스템의 성능검증 및 실증시험 절차를 구축하기 위한 과제를 수행 중이다.

  • PDF

Power system protection IED design using an embedded processor (임베디드 프로세서를 이용한 계통 보호 IED 설계)

  • Yoon, Ki-Don;Son, Young-Ik;Kim, Kab-Il
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.711-713
    • /
    • 2004
  • In the past time, the protection relay did only a protection function. Currently, its upgraded device i.e. IED(Intelligent Electric Device) has been designed to protect, control, and monitor the whole power system automatically. Also the device is desired to successfully measure important elements of the power system. This paper considers design method of a digital protection IED with a function of measuring various elements and a communication function. The protection IED is composed of the specific function modules that are signal process module, communication module, input/output module and main control module. A signal process module use a DSP processor for analysis of input signal. Main control module use a embedded processor, Xscale, that has an ARM Core. The communication protocol uses IEC61850 protocol that becomes standard in the future. The protection IED is able to process mass information with high-performance processor. As each function module is designed individually, the reliability of the device can be enhanced.

  • PDF