• 제목/요약/키워드: IEC 61850-based power system

검색결과 60건 처리시간 0.039초

배전자동화 시스템에 IEC 61850 적용 방안 (IEC 61850 Application in Distribution Automation System)

  • 김태완;임일형;최면송;이승재;권성철
    • 전기학회논문지
    • /
    • 제60권4호
    • /
    • pp.687-693
    • /
    • 2011
  • In this paper, problems and solutions are proposed for applying IEC 61850 to Distribution Automation System(DAS). Communication protocol integration in power automation system have issued by IEC standards, IEC 61850 of them has researched for applying IEC 61850 to many areas of power system in spite of that it was made for substation automation system. Especially, DAS is just about to apply IEC 61850 by communication network change from serial to ethernet although DNP 3.0 is used. But it's impossible to apply directly IEC 61850 to DAS by difference of environment which unfixed wide area and separated nodes in power distribution system unlike concept of IEC 61850 is made by Substation Automation System(SAS) environment of limited space. Thus, this paper proposed applications of three types which conceptual, practical, and future to consider problems and solutions when apply IEC 61850 to Ethernet based DAS.

IEC 61850 기반 IED 시스템 성능 시험 절차서에 관한 연구 (Study on the Testing Procedures of IED System Performance based on IEC 61850)

  • 이남호;장병태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1-2
    • /
    • 2008
  • Korea Electric Power Research Institute has carried out verification of communication conformance on IEC 61850 based IEDs related to power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology". Owing to IEC 61850 international standard and digital substation automation system, IED testing process should be changed from the conventional way to the new way described in the paper. This paper describes IED testing procedures based on substation automation system using UML.

  • PDF

IEC61850용 게이트웨이 개발 및 성능시험 (The Development of IEC61850 Gateway and the Performance Test)

  • 우천희;이보인
    • 전기학회논문지P
    • /
    • 제59권1호
    • /
    • pp.35-39
    • /
    • 2010
  • The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the IEC61850 standards. The IEC61850 communication standards that all power equipment and facility and controllers installed in automation system for power substations must follow has had its Parts 3 and Part 4 established as international standard in January 2002 and Part 10 in May 2005, the last to become international standard. Hence all separate parts of the original IEC61850 standard came to be established as international standards. As a consequence, after 2005, in most power substations around the world the IEC61850 standard is being applied and the prominent makers are geared towards manufacturing products to the IEC61850 standard. The IEC61850 is being recognized as an essential standard that must be applied to not only power substations but for automation of power systems and communication systems. In this research, the Gateway device that connects current SCADA system and IEC61580 based system has been domesticated with Korea‘s own technology and extensive testing was carried out in order to obtain confidence in its performance.

IEC 61850 변전자동화시스템 실증시험에 관한 연구 (A Study on the Field Test of IEC 61850 based Substation Automation System)

  • 이남호;장병태;김병헌;심응보
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.250_251
    • /
    • 2009
  • IEC 61850 based substation automation system mainly consists of human machine interface as a client and a various of IEDs as a server. Both of them should require the field testing for performance verification including IEC 61850 communication services. This means that the test can assure the interoperability of IEC 61850 based substation automation system consisted of multi vendor's products. This paper shows a research result on the field test of the IEC 61850 based HMI and IEDs. And it proposes some engineering solutions for the system implementation.

  • PDF

파력-해상풍력 복합발전시스템의 IEC61850기반 통합 SCADA시스템 개발 (Development of Unified SCADA System Based on IEC61850 in Wave-Offshore Wind Hybrid Power Generation System)

  • 이재규;이상엽;김태형;함경선
    • 전기학회논문지
    • /
    • 제65권5호
    • /
    • pp.811-818
    • /
    • 2016
  • This paper suggests a structure of power control system in floating wave-offshore wind hybrid power generation system. We have developed an unified SCADA(Supervisory Control and Data Acquisition) system which can be used to monitor and control PCS(Power Conversion System) based on IEC61850. The SCADA system is essential to perform the algorithm like proportional distribution and data acquisition, monitoring, active power, reactive power control in hybrid power generation system. IEC61850 is an international standard for electrical substation automation systems. It was made to compensate the limitations of the legacy industrial protocols such as Modbus. In order to test the proposed SCADA system and algorithm, we have developed the wind-wave simulator based Modbus. We have designed a protocol conversion device based on real-time Linux for the communication between Modbus and IEC61850. In this study, SCADA system consists of four 3MW class wind turbines and twenty-four 100kW class wave force generator.

마이크로그리드 운영 시스템 연계를 위한 IEC 61850 기반 IoT 게이트웨이 플랫폼 (IEC 61850 Based IoT Gateway Platform for Interworking to Microgrid Operational System)

  • 박지원;송병권;신인재
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제4권2호
    • /
    • pp.67-73
    • /
    • 2018
  • 마이크로 그리드 환경에는 변압기, 스위치, 에너지저장장치 등 많은 종류의 전력 설비가 존재하지만, IoT 기술의 발달에 따라 온도, 압력, 습도와 같은 센서 정보를 취득할 수 있는 기회를 제공하고 있다. 기존의 마이크로 그리드 환경에서는 IEC 61850 표준에서 정의하고 있는 MMS 등의 통신 프로토콜을 준용하여 전력 설비와 플랫폼 간 통합 운용되고 있다. 그렇기 때문에 IoT 데이터를 수용하기 위해서는 IEC 61850 기반으로 구성된 데이터 수집 장치(FEP)에 IoT 데이터를 연계해 줄 수 있는 게이트웨이 기술이 필요하다. 본 논문에서는 마이크로그리드 운영 시스템 연계를 위한 IEC 61850기반 IoT 게이트웨이 플랫폼 프로토타입을 제안하고자 한다. 게이트웨이 플랫폼은 IoT 프로토콜(MQTT, CoAP, AMQP) 인터페이스 모듈과 데이터베이스, IEC 61850서버로 구성되어 있다. 데이터베이스의 경우, JSON 데이터를 저장하기 위해 오픈소스 기반의 NoSQL 데이터베이스인 Hbase와 MongoDB를 이용하였다. IoT 프로토콜을 검증하기 위해 라즈베리파이 아두이노 인텔 에디슨 SoC 기반 전력 IoT 디바이스 시뮬레이터를 이용하였고, IEC 61850은 Sisco's MMS EASY Lite를 이용하여 IoT 프로토콜과 IEC 61850 프로토콜간의 상호호환성을 검증하였다.

TETRA 기반 IEC 61850 SCADA 시스템 구축 (Building IEC 61850 SCADA system based on TETRA)

  • 송병권;정태의
    • 전기전자학회논문지
    • /
    • 제13권3호
    • /
    • pp.87-94
    • /
    • 2009
  • TETRA(TErrestrial Trunked RAdio)는 국내 전력IT무선기간망에 적용된 ETSI(European Telecommunications Standards Institute)가 정한 디지털 주파수공용통신(TRS, Trunked Radio System) 기술로서 공중망 및 기간망에 적용되고 있는 무선통신시스템이다. IEC 61850은 SCADA(Supervisory Control And Data Acquisition) 시스템에서 SAS(Substation Automation System)를 위해 제안된 프로토콜이다. 본 논문에서는 리눅스 운영체제 기반의 IEC 61850 Server와 Client Simulator를 사용하였다. 또한 IEC 61850 Server Simulator와 Client Simulator 간의 TCP/IP 기반의 통신을 TETRA Packet Data Service 기반의 통신으로 변환하는 다기능 게이트웨이를 개발하여 TETRA 기반 IEC 61850 SCADA 시스템을 구축하였다.

  • PDF

IED IEC 61850 제어기능에 대한 성능시험 (Performance Test of the IED control function based on IEC 61850)

  • 이남호;장병태;이민수;한정열;안용호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.115_116
    • /
    • 2009
  • IEC 61850 based substation automation system mainly consists of a various of protective and control IEDs. In order to implement the system, All of them should require the performance verification of IEC 61850 communication services for the assurance of interoperability throughout the digital network. This paper shows a research result on the testing method of IEC 61850 control communication interface of IEDs according to IED IEC 61850 conformance test procedures.

  • PDF

Communication Architecture of the IEC 61850-based Micro Grid System

  • Yoo, Byong-Kwan;Yang, Seung-Ho;Yang, Hyo-Sik;Kim, Won-Yong;Jeong, Yu-Seok;Han, Byung-Moon;Jang, Kwang-Soo
    • Journal of Electrical Engineering and Technology
    • /
    • 제6권5호
    • /
    • pp.605-612
    • /
    • 2011
  • As the power grids are integrated into one big umbrella called a "smart grid," communication protocol plays a key role in successful operations. The successful deployment of smart grid interoperability is a major hurdle that must be overcome. The micro grid, a small power system that distributes energy resource, is operated in diverse regions. Different vendors use different communication protocols in the operation of the micro grid. Recently, the IEC 61850 has been legislated to solve the interoperability problems in power utility automation. The present paper presents a micro grid system based on the IEC 61850 protocol. It consists of a micro grid monitoring system, a protocol converter that transforms serial data to IEC 61850 data, and distributed energy resource controllers for diverse DER nodes. A developed communication gateway can be deployed for DER controllers with serial links to exchange data with IEC 61850-based devices. The gateway can be extended to IEC 61850-based distribution automation systems, substation automation systems, or SCADA.

IEC61850 기반 변전소자동화시스템인 신뢰도 향상기법 (A Reliability Enhancement Methodology of the IEC61850 based Substation Automation System)

  • 임성일
    • 조명전기설비학회논문지
    • /
    • 제22권9호
    • /
    • pp.75-81
    • /
    • 2008
  • 최근 IEC61850이 변전소자동화시스템의 국제표준으로 자리 잡고 있는데, 그 중에서도 보호IED의 신뢰도는 매우 중요하다. 본 논문에서는 IEC61850의 특징을 이용하여 보호IED의 신뢰도를 향상시키는 새로운 방법을 제시한다. 본 논문에서 제시하는 신뢰도 향상기법은 적은 수의 백업 IED를 사용하므로 경제적이면서도, 기존의 2계열화나 백업보호방식에 비하여 오부동작을 현저히 감소시킬 수 있다. 6모선 예제계통에 대한 모의실험을 통하여 본 논문에서 제시하는 신뢰도 향상기법의 유용성을 검증하였다.