• Title/Summary/Keyword: IEC 61850-based power system

Search Result 60, Processing Time 0.035 seconds

IEC 61850 Application in Distribution Automation System (배전자동화 시스템에 IEC 61850 적용 방안)

  • Kim, Taw-Wan;Lim, Il-Hyung;Choi, Myeon-Song;Lee, Seung-Jae;Kwon, Sung-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.687-693
    • /
    • 2011
  • In this paper, problems and solutions are proposed for applying IEC 61850 to Distribution Automation System(DAS). Communication protocol integration in power automation system have issued by IEC standards, IEC 61850 of them has researched for applying IEC 61850 to many areas of power system in spite of that it was made for substation automation system. Especially, DAS is just about to apply IEC 61850 by communication network change from serial to ethernet although DNP 3.0 is used. But it's impossible to apply directly IEC 61850 to DAS by difference of environment which unfixed wide area and separated nodes in power distribution system unlike concept of IEC 61850 is made by Substation Automation System(SAS) environment of limited space. Thus, this paper proposed applications of three types which conceptual, practical, and future to consider problems and solutions when apply IEC 61850 to Ethernet based DAS.

Study on the Testing Procedures of IED System Performance based on IEC 61850 (IEC 61850 기반 IED 시스템 성능 시험 절차서에 관한 연구)

  • Lee, Nam-Ho;Jang, Byung-Tae
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1-2
    • /
    • 2008
  • Korea Electric Power Research Institute has carried out verification of communication conformance on IEC 61850 based IEDs related to power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology". Owing to IEC 61850 international standard and digital substation automation system, IED testing process should be changed from the conventional way to the new way described in the paper. This paper describes IED testing procedures based on substation automation system using UML.

  • PDF

The Development of IEC61850 Gateway and the Performance Test (IEC61850용 게이트웨이 개발 및 성능시험)

  • Woo, Chun-Hee;Lee, Bo-In
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.1
    • /
    • pp.35-39
    • /
    • 2010
  • The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the IEC61850 standards. The IEC61850 communication standards that all power equipment and facility and controllers installed in automation system for power substations must follow has had its Parts 3 and Part 4 established as international standard in January 2002 and Part 10 in May 2005, the last to become international standard. Hence all separate parts of the original IEC61850 standard came to be established as international standards. As a consequence, after 2005, in most power substations around the world the IEC61850 standard is being applied and the prominent makers are geared towards manufacturing products to the IEC61850 standard. The IEC61850 is being recognized as an essential standard that must be applied to not only power substations but for automation of power systems and communication systems. In this research, the Gateway device that connects current SCADA system and IEC61580 based system has been domesticated with Korea‘s own technology and extensive testing was carried out in order to obtain confidence in its performance.

A Study on the Field Test of IEC 61850 based Substation Automation System (IEC 61850 변전자동화시스템 실증시험에 관한 연구)

  • Lee, N.H.;Jang, B.T.;Kim, B.H.;Shim, E.B.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.250_251
    • /
    • 2009
  • IEC 61850 based substation automation system mainly consists of human machine interface as a client and a various of IEDs as a server. Both of them should require the field testing for performance verification including IEC 61850 communication services. This means that the test can assure the interoperability of IEC 61850 based substation automation system consisted of multi vendor's products. This paper shows a research result on the field test of the IEC 61850 based HMI and IEDs. And it proposes some engineering solutions for the system implementation.

  • PDF

Development of Unified SCADA System Based on IEC61850 in Wave-Offshore Wind Hybrid Power Generation System (파력-해상풍력 복합발전시스템의 IEC61850기반 통합 SCADA시스템 개발)

  • Lee, Jae-Kyu;Lee, Sang-Yub;Kim, Tae-Hyoung;Ham, Kyung-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.811-818
    • /
    • 2016
  • This paper suggests a structure of power control system in floating wave-offshore wind hybrid power generation system. We have developed an unified SCADA(Supervisory Control and Data Acquisition) system which can be used to monitor and control PCS(Power Conversion System) based on IEC61850. The SCADA system is essential to perform the algorithm like proportional distribution and data acquisition, monitoring, active power, reactive power control in hybrid power generation system. IEC61850 is an international standard for electrical substation automation systems. It was made to compensate the limitations of the legacy industrial protocols such as Modbus. In order to test the proposed SCADA system and algorithm, we have developed the wind-wave simulator based Modbus. We have designed a protocol conversion device based on real-time Linux for the communication between Modbus and IEC61850. In this study, SCADA system consists of four 3MW class wind turbines and twenty-four 100kW class wave force generator.

IEC 61850 Based IoT Gateway Platform for Interworking to Microgrid Operational System (마이크로그리드 운영 시스템 연계를 위한 IEC 61850 기반 IoT 게이트웨이 플랫폼)

  • Park, Jeewon;Song, ByungKwen;Shin, InJae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.2
    • /
    • pp.67-73
    • /
    • 2018
  • There are many types of power facilities such as transformers, switches, and energy storage devices in the micro grid environment. However, with the development of IoT technology, opportunities to acquire sensor information such as temperature, pressure, and humidity are provided. In the existing micro grid environment, the communication protocols such as MMS transport protocol in IEC 61850 standard is applied in accordance with the integrated operation between the power facilities and the platform. Therefore, to accommodate IoT data, a gateway technology that can link IoT data to a data collection device (FEP) based on IEC 61850 is required. In this paper, we propose IEC 61850 based IoT gateway platform prototype for microgrid operating system linkage. The gateway platform consists of an IoT protocol interface module (MQTT, CoAP, AMQP) and database, IEC 61850 server. For databases, We used open source based NoSQL databases, Hbase and MongoDB, to store JSON data. We verified the interoperability between the IoT protocol and the IEC 61850 protocol using Sisco's MMS EASY Lite.

Building IEC 61850 SCADA system based on TETRA (TETRA 기반 IEC 61850 SCADA 시스템 구축)

  • Song, Byung-Kwen;Jeong, Tae-Ui
    • Journal of IKEEE
    • /
    • v.13 no.3
    • /
    • pp.87-94
    • /
    • 2009
  • TETRA(TErrestrial Trunked RAdio) is the wireless communication system generally adopted to public network and backbone network, as the technology of Trunked Radio System specified by ETSI(European Telecommunications Standards Institute) and currently adopted to the Electric Power IT Backbone Network in Korea. IEC 61850 is the protocol proposed for SAS(Substation Automation System) of SCADA(Supervisory Control And Data Acquisition) system. In this paper, IEC 61850 Server and Client simulator are used based on Linux operating system. The multi-functional gateway, which transforms the communication based on TCP/IP between IEC 61850 Server Simulator and Client Simulator to the one based on TETRA Packet Data Service, is developed such that IEC 61850 SCADA system is constructed based on TETRA.

  • PDF

Performance Test of the IED control function based on IEC 61850 (IED IEC 61850 제어기능에 대한 성능시험)

  • Lee, N.H.;Jang, B.T.;Lee, M.S.;Han, J.H.;An, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.115_116
    • /
    • 2009
  • IEC 61850 based substation automation system mainly consists of a various of protective and control IEDs. In order to implement the system, All of them should require the performance verification of IEC 61850 communication services for the assurance of interoperability throughout the digital network. This paper shows a research result on the testing method of IEC 61850 control communication interface of IEDs according to IED IEC 61850 conformance test procedures.

  • PDF

Communication Architecture of the IEC 61850-based Micro Grid System

  • Yoo, Byong-Kwan;Yang, Seung-Ho;Yang, Hyo-Sik;Kim, Won-Yong;Jeong, Yu-Seok;Han, Byung-Moon;Jang, Kwang-Soo
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.5
    • /
    • pp.605-612
    • /
    • 2011
  • As the power grids are integrated into one big umbrella called a "smart grid," communication protocol plays a key role in successful operations. The successful deployment of smart grid interoperability is a major hurdle that must be overcome. The micro grid, a small power system that distributes energy resource, is operated in diverse regions. Different vendors use different communication protocols in the operation of the micro grid. Recently, the IEC 61850 has been legislated to solve the interoperability problems in power utility automation. The present paper presents a micro grid system based on the IEC 61850 protocol. It consists of a micro grid monitoring system, a protocol converter that transforms serial data to IEC 61850 data, and distributed energy resource controllers for diverse DER nodes. A developed communication gateway can be deployed for DER controllers with serial links to exchange data with IEC 61850-based devices. The gateway can be extended to IEC 61850-based distribution automation systems, substation automation systems, or SCADA.

A Reliability Enhancement Methodology of the IEC61850 based Substation Automation System (IEC61850 기반 변전소자동화시스템인 신뢰도 향상기법)

  • Lim, Seong-Il
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.75-81
    • /
    • 2008
  • The effect of the fault could be propagated to healthy region when the fault on the power system is not cleared in time. In order to enhance reliability of the protective relay, a dual and/or backup system is adopted for the power system protection. The IEC61850 has become an international standard of the substation automation system for interoperability between heterogeneous IEDs from different vendors. This paper introduces a reliability enhancement technique for the substation automation system using characteristics of the IEC61850.