• Title/Summary/Keyword: IDEF3

Search Result 51, Processing Time 0.026 seconds

Procedures of Transform the IDEF3 Process Model of Concurrent Design into CPM Precedence Network Model (동시공학적 설계의 IDEF3프로세스 모델을 CPM Network 모델로 변환하기 위한 절차)

  • 강동진
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.2
    • /
    • pp.73-80
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload As a general rule, leveling the peak of workload in a period is difficult because concurrent processing is comprised of various processed, including overlapping, paralleling and looping and so on. Therefore workload management with resource constraints is so beneficial that effective methods to analyze design process are momentous. This paper presents a procedure to transform the IDEF3 process model into the precedence network model for more useful assessment of the process. This procedure is expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF

A Study on the Improvement of Management of Historical Data in Construction (건설공사 실적관리 개선에 관한 연구)

  • Cheon Bong-Gi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.107-113
    • /
    • 2002
  • The processes for management of historical data in construction have many problems according to construction firm$^{\circ}{\phi}$s participating in some of the processes. This study analyzed about current process and provided improved processes with IDEF method and simulation. The proposed $\lceil$To-Be$\rfloor$ model is more effective than $\lceil$As-Is$\rfloor$ model according to the result of simulation performance. It is revealed that the productivity in the construction company is more improved than that of the owner from the results of the system simulation.

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

시뮬레이션 코드 자동 생성을 위한 생산공정 모델링

  • 김대송;조현보;정무영
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.627-630
    • /
    • 1996
  • One of the most common communication mechanisms to describe a situation or a process is a story written as an ordered sequence of events or activities. For example, a shop floor supervisor may present the operations of his manufacturing system by describing the processes of manunfacturing a product in his shop. Although IDEF3 is one of the most commonly used methods for describing a business process, but it is not common for a manufacturing process. In this study, we tried to apply IDEF3 for describing a manufacturing process. Problems and suggestions such as selection probability, programmable process modeling, manufacturing resource model were presented.

  • PDF

A Triangularization Algorithm Solving for the Complex Design with Precedence Constraints and IDEF3 Modeling in Concurrent Engineering (전제조건과 IDEF3를 응용한 동시공학환경에서의 복합설계)

  • Cho, Moon-Soo;Lim, Tae-Jin
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.15 no.7
    • /
    • pp.742-752
    • /
    • 2009
  • Engineering design involves the specification of many variables that define a product, how it is made, and how it behaves applied to computer, communication and control fields. Before some variables can be determined, other variables must first be known or assumed. This fact implies a precedence order of the variables, and of the tasks of determining these variables consequently. Moreover, design of complex systems may involve a large number of design activities. In this paper, the activity-activity incidence matrix is considered as a representation of design activity analysis which mainly focuses on the precedence constraint with an object of doing IDEF3 in process-centered view. In order to analyze the activity-activity incidence matrix, a heuristic algorithm is proposed, which transforms an activity-activity, parameter-formula, and parameter-parameter incidence matrix into a lower triangular form. The analysis of the structured matrices can not only significantly reduce the overall project complexity by reorganizing few critical tasks in practice, but also aims at obtaining shorter times considering the solution structure by exploring concurrency.

A Study of IDEF Modelling on the Construction Project (건설사업에 IDEF 모형화에 관한 연구)

  • Kwon, Oh-Ryong;Yuem, Jun-Koun
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.117-124
    • /
    • 1997
  • This paper presents the results of analysis for the Flexible Computer Integrated construction(FCIC) system to adapt CALS on the construction industry. Acquisition and supply process of the system are represented by IDEFO function models and FCIC information systems are briefly described in this paper. The model presented here can be used as a reference for the development of CALS system.

  • PDF

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Study on the Electronic Processing of Bidding Business for Public Procurement in Construction Industry (건설산업 공공조달을 위한 입찰업무 전자처리에 관한 연구)

  • Ahn Kwang-Hoon;Cheon Bong-Gi;Kim Seung-Kyun;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.114-120
    • /
    • 2002
  • Traditional bidding process and activities in public construction area has many problems in terms of the transparency and fairness of administration. And, it causes many expenses to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey, Questionnaire, contentment estimation and IDEF method to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems. According to the survey, under present bidding system big problem is inconvenience of conducting process. Nearly all users of current electronic bidding systems were contented. When public institutions are planning new electronic bidding systems, standardization, security, law and bidding system consolidation must be applied. This study proposes an improved bidding system and described the effects through the improvements.

Study on Identification Procedure for Unidentified Underwater Targets Using Small ROV Based on IDEF Method (소형 ROV를 이용한 IDEF0 기반의 수중 미확인 물체 식별절차에 관한 연구)

  • Baek, Hyuk;Jun, Bong-Huan;Yoon, Suk-Min;Noh, Myounggyu
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.3
    • /
    • pp.289-299
    • /
    • 2019
  • Various sizes of ROVs are being utilized in offshore industrial, scientific, and military applications all around the world. Because of innovative developments in science and technology, image acquisition devices such as sonar devices and cameras have been reduced in size and their performance has been improved. Thus, we can expect better accuracy and higher resolution even in the case of exploration using a small ROV. The purpose of this paper is to prepare a standard procedure for the identification of unidentified hazardous materials found during the National Oceanographic Survey. In this paper, we propose an IDEF (Integrated DEFinition) method modeling technique to identify unidentified targets using a small ROV. In accordance with the proposed procedure, an ROV survey was carried out on target No.16 with a four-ton-class fishing boat as a support vessel on September 18th of 2018 in the sea near Daebu Island. Unidentified targets, which were not known by the multi-beam data obtained from the ship, could be identified as concrete pipes by analyzing the HD camera and high-resolution sonar images acquired by the ROV. The whole proposed procedure could be verified, and the survey with the small ROV required about 10 days to identify the target in one place.