• Title/Summary/Keyword: Hydropower reservoir

검색결과 46건 처리시간 0.029초

Maximizing of hydropower generation of Hwacheon Reservoir using HEC-ResPRM model

  • Karimizadeh, Keivan;Choi, Changwon;Yi, Jaeeung
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.219-219
    • /
    • 2015
  • Hwacheon Reservoir is one of the reservoirs, which are located on the North Han River in South Korea. Construction of this reservoir was started in 1939 and completed in 1944. At the upstream of this reservoir there are Peace Reservoir, which is located in South Korea and Imnam Reservoir, which is located in North Korea. After construction of Imnam Reservoir, inflow regularity of Hwacheon Reservoir was changed and inflow of Hwacheon Reservoir also, was decreased. Peace Reservoir is used to decrease flood and damage at downstream due to unexpected release from Imnam Reservoir. This reservoir also, has a special role to regulate inflow of Hwacheon Reservoir. Hwacheon Reservoir has an important role for hydropower generation and flood control. Capacity and maximum discharge capacity of Hwacheon Reservoir are 1018 million $m^3$ and $9500m^3/s$, respectively. This reservoir has four generators to produce power and it is one of the important reservoirs for hydropower generation in South Korea. Due to the important role of this reservoir in generating power, maximization of hydropower generation of this reservoir is important and necessary. For this purpose, HEC-ResPRM model was applied in this study. HEC-ResPRM is a useful and applicable model to operate reservoirs and it gives optimal value for release to maximize power by minimizing penalty functions. In this study, after running the model, amount of release was optimized and hydropower generation was maximized by allocating more water for hydropower release instead of spillway release. Also, the model increased release in dry period from October to June to prevent high amount of release in flood season from July to September.

  • PDF

발전용댐 이수능력 평가 연구(I): 북한강수계 개별 댐 및 댐군 용수공급능력 분석 (Evaluation of hydropower dam water supply capacity (I): individual and integrated operation of hydropower dams in Bukhan river)

  • 정기문;최정욱;강두선;안정환;김태순
    • 한국수자원학회논문집
    • /
    • 제55권7호
    • /
    • pp.505-513
    • /
    • 2022
  • 최근 기후변화 및 기상이변 등으로 인해 가용 수자원 예측의 불확실성이 점차 커져가고 있다. 홍수 및 가뭄 예방 등 물관리에 대한 사회적 관심 또한 증가하고 있으며, 2018년 시행된 물관리일원화와 더불어 국내 물관리는 큰 전환점을 맞이하고 있다. 이러한 물관리 역량 강화의 일환으로, 과거 수력발전을 중심으로 운영되었던 발전용댐을 이·치수 목적으로 활용하기 위한 다양한 검토가 이루어지고 있다. 그러나, 주로 다목적댐을 대상으로 개발된 댐 평가 기법들이 발전용댐에 그대로 적용되고 있어, 발전용댐의 특성을 고려할 수 있는 추가적인 평가기법이 요구된다. 본 연구에서는 저수지 운영모의 방법을 활용하여 이수 측면에서 발전용댐의 운영 특성을 고려한 댐별 용수공급능력 산정 방법을 새롭게 제시하였으며, 여러댐이 상하류에 걸쳐 운영되고 있는 조건에서 연계 댐군의 종합적인 용수공급능력을 평가할 수 있는 저수지 연결모의 방법을 제시하였다. 제시된 방법은 북한강수계 발전용 댐을 대상으로 적용되었으며, 개별 댐의 용수공급능력 산정 결과와 댐군 연결모의를 통한 용수공급능력을 비교 분석하였다. 향후 발전용댐의 가뭄시 물 공급 역할은 더욱 중요해질 것으로 예상되며, 본 연구 결과는 발전용댐을 활용한 지속가능한 국내 물 관리 연구에 활용될 수 있을 것으로 기대된다.

최적화기법을 이용한 기존 농업용 저수지에서의 부존 수력발전량 추정 (Optimization Technique for Estimation of Potential Hydroelectric Energy at Existion Ahricultural Reservoir)

  • 안태진;류희정;박정응
    • 한국수자원학회논문집
    • /
    • 제32권3호
    • /
    • pp.281-289
    • /
    • 1999
  • 기존 농업용 댐에서의 소수력발전 사업은 기존 저수지로부터의 방류량을 효율적으로 이용함으로써 전력의 추가 확보에 기여할 수 있다. 본 연구에서는 기존 농업용 댐에서의 부존 수력발전량을 추정하기 위하여 관개용수를 근거로 한 관개수량의 유황, 저수지 발전모의운영 및 비선형계획 모형을 적용하여 기존 농업용 저수지에서의 부존 수력발전량을 추정하였다. 비선형계획법은 소요관개용수 제약조건아래 최대발전량을 찾는 것으로 하였다. 유입량과 관개용수량이 주어진 표본 저수지에서, 채택된 방법 중 최적화 모형의 최적해에 의한 발전량이 가장 많았으며 저수지의 유입량에 관한 발전용수도 최적화 모형이 가장 많이 사용하였음을 알 수 있었다. 저수지 관리수위 상승으로 확보되는 저수량에 따른 발전량의 변화를 분석하기 위하여 연평균발전량을 추정한 결과, 관리수위 증가에 의한 발전량의 증가는 미미함을 알 수 있었다. 본 연구에서 제안한 부존발전량 추정 절차와 최적화 모형은 기존 농업용댐의 부존 발전량 추정에 적용할 수 있으며, 소수력발전 사업 경제성분석에 필요한 기초자료로 활용될 수 있을 것으로 판단된다.

  • PDF

Rural Water Supply from the Irrigation Reservoir

  • 김대철;박성기
    • 한국농공학회지
    • /
    • 제37권E호
    • /
    • pp.47-54
    • /
    • 1995
  • Irrigation water has been mainly used for paddy rice. Irrigated paddy land tends to be recently converted to land for green house, farm house, and rural-industrial complex. Consequently, demand of water for crops, domestic & industrial, rural recreations, small-scaled hydropower, livestocks, and environment in the rural area, so called rural water, is rapidly increasing. In order to supply rural water, water in the existing irrigation reservoir could be enlarged by repairment of irrigation canal and reinforcement of irrigation reservoir, and be saved by the operation rule curve, utilization of dead water, and balanced storage management.

  • PDF

댐 군 월별 운영 정책의 도출을 위한 추계적 동적 계획 모형 (A Stochastic Dynamic Programming Model to Derive Monthly Operating Policy of a Multi-Reservoir System)

  • 임동규;김재희;김승권
    • 경영과학
    • /
    • 제29권1호
    • /
    • pp.1-14
    • /
    • 2012
  • The goal of the multi-reservoir operation planning is to provide an optimal release plan that maximize the reservoir storage and hydropower generation while minimizing the spillages. However, the reservoir operation is difficult due to the uncertainty associated with inflows. In order to consider the uncertain inflows in the reservoir operating problem, we present a Stochastic Dynamic Programming (SDP) model based on the markov decision process (MDP). The objective of the model is to maximize the expected value of the system performance that is the weighted sum of all expected objective values. With the SDP model, multi-reservoir operating rule can be derived, and it also generates the steady state probabilities of reservoir storage and inflow as output. We applied the model to the Geum-river basin in Korea and could generate a multi-reservoir monthly operating plan that can consider the uncertainty of inflow.

Prediction of reservoir sedimentation: A case study of Pleikrong Reservoir

  • Thu Hien Nguyen;XuanKhanh Do
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2023년도 학술발표회
    • /
    • pp.36-36
    • /
    • 2023
  • Sedimentation is a natural process that occurs in all reservoirs. Sedimentation problem reduces the storage capacity of the reservoir and limits its ability to provide water for various uses, such as irrigation, hydropower generation, and flood control. Therefore, predicting reservoir sedimentation is important for ensuring the efficient operation and sedimentation management of a reservoir and . In this study, the HECRAS model was applied to predict longitudinal distribution of deposited sediment in the Pleikrong reservoir to 2050. Different scenarios was considered: (i) no climate change, (ii) climate change (under two emissions scenarios, RCP4.5 and RCP8.5), and (iii) climate change and land use change (followed land use planning of the watershed). The computation results with different scenarios were analyses and compared. The results show that the reservoir reduced storage volume's rate and sedimentation proceed toward to the dam in the case of climate change is faster than in the case of no climate change. Analyses also indicates that following the land used planning could also improve the long-term problem of the reservoir sedimentation. The outcomes of this study will be helpful for a sustainable plan of sediment management for the Pleikrong reservoir.

  • PDF

발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정 (Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow)

  • 정기문;강두선;김동현;이승오;김태순
    • 한국수자원학회논문집
    • /
    • 제55권7호
    • /
    • pp.515-529
    • /
    • 2022
  • 이용 가능한 수자원의 규모를 파악하는 것은 지속가능한 이수계획 수립에 필수적인 과정이다. 특히 댐 시설은 용수를 저류하여 갈수기에 공급하기 위한 주요 수공 시설물로써 댐 유입량 및 댐 운영 방안에 따라 댐의 용수공급능력은 크게 달라질 수 있다. 국내에서는 과거 유입량 관측자료를 바탕으로 저수지 운영모의 방법을 통해 댐 용수공급능력을 산정하고 있으며, 이때 관측기간 내 가뭄발생 여부에 따라 용수공급능력이 과소 혹은 과다 추정되는 불확실성을 내포하며, 이는 수자원 계획 수립의 신뢰도를 저해하는 요인이 될 수 있다. 본 연구에서는 발전용댐의 용수공급능력 적정 범위를 산정하기 위해 확률론적 유입량 자료를 활용하였다. 즉, 다양한 기후 및 사회경제 변화를 반영한 확률론적 댐 유입량 및 이를 활용한 발전용댐 용수공급능력의 범위를 산정하는 방법을 제시하였으며, 국내 한강수계에 위치한 발전용댐을 대상으로 분석을 수행하였다. 향후 기후변화에 대응하기 위한 발전용댐의 용수공급능력 파악은 더욱 중요해질 것으로 예상되며, 본 연구 결과는 다양한 기후 시나리오에서의 댐 용수공급능력 범위를 정량적으로 파악함으로써 국내 수자원 계획 수립에 기여할 것으로 기대된다.

파키스탄 파트린드댐의 저수지 퇴사관리를 위한 배사효과 분석 (Analysis of Sediment Flushing Effect for Reservoir Sedimentation Management of the Patrind Dam in Pakistan)

  • 노준우;박진혁;허영택;김상호
    • 한국물환경학회지
    • /
    • 제29권6호
    • /
    • pp.799-807
    • /
    • 2013
  • Reservoir sedimentation is one of the major concerns for sustainable reservoir operation. Since sediment concentration of the rivers in the Himalayan Mountain is very high, a proper sediment management scheme is necessary. This paper presents long-term reservoir sedimentation and sediment flushing based on the gate operation. Focused on the reservoir to be constructed for the Patrind hydropower project in Pakistan, 4 different flushing scenarios were proposed in this study to prevent successive sedimentation. By extending flushing period and by increasing the flushing discharge for 2 times, the flushing rate increases up to 53.2% and 43.6% in proportion to flushing period and discharge, respectively. Based on the simulation presented in this paper, it is expected to establish efficient sediment management plan to increase hydro power generation and sediment flushing simultaneously.

한강수계 발전용댐 장기 운영계획 수립을 위한 최적화 모형 구축 (Development of Optimization Model for Long-term Operation Planning of the Hydropower Reservoirs in Han River Basin)

  • 이은경;지정원;이재응
    • 한국습지학회지
    • /
    • 제21권spc호
    • /
    • pp.69-79
    • /
    • 2019
  • 우리나라는 60% 이상이 산간지형에 해당하며 수십 년 전부터 이러한 특성을 이용하여 수력발전소를 다수 건설하고 친환경적인 에너지를 생산해왔다. 수력발전은 급변하는 에너지 수급에 대처할 수 있고 낙차를 이용하여 친환경적으로 에너지를 생산한다는 장점이 있으나 댐 설립시 입지 조건에 의해 불가피하게 환경을 훼손해야 하는 경우가 많다. 따라서, 본 연구에서는 기존 발전용댐들의 장기 운영계획을 수립하고자 월별 발전량을 최대화하는 최적 저수지 운영 모형을 개발하였다. 댐 운영 모형은 자원 최적화 분야에서 널리 이용되는 선형계획법을 기반으로 월단위로 1년 운영계획을 수립할 수 있는 형태로 구축하였다. 선형계획법은 목적함수와 제약조건 모두 선형식으로 이루어져야 하지만 발전량 산정식은 비선형식이기 때문에 Taylor Expansion 기법을 활용하여 선형화하였다. 개발된 모형을 검토하기 위해 한강수계에 위치하는 5개 발전용댐을 대상으로2009~2018년의 실적자료와 댐 운영 모형의 결과를 비교, 분석하였다. 결과적으로 발전용댐들의 총 최적 발전량은 총 실적 발전량보다 약 10~37% 정도 향상된 결과를 나타내었다.