• 제목/요약/키워드: Hydropower plants

검색결과 57건 처리시간 0.031초

소수력 발전설비 성능평가 시스템 구축 (Construction of small hydropower facilities performance evaluation system)

  • 김영준;김용열;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.193.2-193.2
    • /
    • 2010
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

소수력 발전설비 성능평가 시스템 구축 (Construction of small hydropower facilities performance evaluation system)

  • 김영준;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.206.2-206.2
    • /
    • 2011
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

낙동강수계의 소수력자원 특성 분석 (Analysis of Small Hydropower Resource Characteristics for Nakdong River System)

  • 박완순;이철형
    • 한국태양에너지학회 논문집
    • /
    • 제32권6호
    • /
    • pp.68-75
    • /
    • 2012
  • Small hydropower is one of the many types of new and renewable energy, which is planning to develop, as the country is abundant in endowed resources. In order to fully utilize small hydropower resources, there is a need for greater precision in quantifying small hydropower resources and establish an environment in which energy sources can be discovered using the small hydropower resource management system. This study has given greater precision to calculate annual electricity generation and capacity of small hydropower plants of Nakdong river system by inquiring into average annual rainfall, basin area and runoff coefficient, which is anticipated to promote small hydropower resources utilization. Small hydropower resource management system was also established by additionally providing base information on quantified small hydropower resources and analysis function and small hydropower generator status, rivers, basin, rainfall gauging station, water level gauging station etc.. Small hydropower resource management system can be used gather basic information for positive applications of small hydropower energy nationwide.

자원관리시스템을 이용한 한강수계의 소수력자원 분석 (Analysis of Small Hydropower Resources for Han River System Using Resource Management System)

  • 박완순;이철형
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 춘계학술발표대회 논문집
    • /
    • pp.241-245
    • /
    • 2011
  • Small hydropower is one of the many types of new and renewable energy, which South Korea is planning to develop, as the country is abundant in endowed resources. In order to fully utilize small hydropower resources, there is a need for greater precision in quantifying small hydropower resources and establish an environment in which energy sources can be discovered using the small hydropower resource management system. This study has given greater precision to calculating annual electricity generation and installed capacity of small hydropower plants of Han river system by inquiring into average annual rainfall, basin area and runoff coefficient, which is anticipated to promote small hydropower resources utilization. Small hydropower resource management system was also established by additionally providing base information on quantified small hydropower resources and analysis function and small hydropower generator status, rivers, basin, rainfall gauging station, water level gauging station etc.. Small hydropower resource management system can be used gather basic information for positive applications of small hydropower energy nationwide.

  • PDF

자원관리시스템을 이용한 낙동강수계의 소수력자원 분석 (Analysis of Small Hydropower Resources for Nakdong River System Using Resource Management System)

  • 박완순;이철형
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 추계학술발표대회 논문집
    • /
    • pp.354-358
    • /
    • 2011
  • Small hydropower is one of the many types of new and renewable energy, which South Korea is planning to develop, as the country is abundant in endowed resources. In order to fully utilize small hydropower resources, there is a need for greater precision in quantifying small hydropower resources and establish an environment in which energy sources can be discovered using the small hydropower resource management system. This study has given greater precision to calculating annual electricity generation and installed capacity of small hydropower plants of Nakdong river system by inquiring into average annual rainfall, basin area and runoff coefficient, which is anticipated to promote small hydropower resources utilization. Small hydropower resource management system was also established by additionally providing base information on quantified small hydropower resources and analysis function and small hydropower generator status, rivers, basin, rainfall gauging station, water level gauging station etc.. Small hydropower resource management system can be used gather basic information for positive applications of small hydropower energy nationwide.

  • PDF

Use of Geo-spatial Information System for the Potential Location Analysis of Small Hydropower.

  • Bastola, Shiksha;Lee, Sangheop;Kareem, Kola Yusuff;Jung, Younghun
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2021년도 학술발표회
    • /
    • pp.151-151
    • /
    • 2021
  • The alarming climate change impacts are demanding the use of renewable energy sources like never before. Hydropower is one of the most cost-effective and environmental friendly energy technology recognized in the world. Big hydropower projects come up with the requirements of huge investment costs along with environmental impacts, whereas small hydropower(SHP) are considered a best solution for the economical source of energy. SHP, basically Run-of-River (RoR) type plants can be sustainable renewable energy sources and given the nature of perennial rivers flowing from steep gradient and rugged topography, feasibility of such plants is equally high in Nepal. The objective of this study is to determine the primary potential sites for the development of RoR type SHP sites using Geo-spatial Information System(GSIS). The use of GSIS enables precise survey of large area within a short period of time. This study has focused on the determination of locations by establishing defined criterions and methodologies and hence have located multiple locations rather than selecting one best location. The approach is applicable for the rapid initial screening of potential locations and results can facilitate detail feasibility study for the technical and economic analysis of SHP in the basin.

  • PDF

Micro급 수력발전입지의 성능특성 분석 (Performance Characteristic Anaysis of Micro Hydropower Sites)

  • 박완순;이철형
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2012년도 춘계학술발표대회 논문집
    • /
    • pp.498-501
    • /
    • 2012
  • A methodology to evaluate the performance analysis for micro hydropower sites has been studied. It consists of two main parts; flow duration function which can describe micro hydropower sites and performance analysis to estimate the output characteristics of micro hydropower plants. The output performance characteristics for Magok stream was analyzed, using developed model. Also, primary design specifications such as design flowrate, installed capacity, operational rate and annual electricity production were estimated and dicussed. Additionally, it was found that the developed model in this study is useful tool to estimate feasibility assessment for micro hydropower sites.

  • PDF

소수력 자원량 산정과 지리정보시스템 구축 (Estimation of Small Hydropower Resources and Development of Geographic Information System)

  • 허준호;박완순;윤정환;정상만
    • 한국방재학회 논문집
    • /
    • 제10권2호
    • /
    • pp.103-110
    • /
    • 2010
  • 소수력은 신재생에너지 중 하나로 우리나라에는 부존량이 매우 풍부하여 최근 개발에 대한 필요성이 대두되고 있다. 이러한 소수력 자원의 적극적인 활용을 위해 소수력 자원량 산정의 정확성을 제고하고, 소수력 지리정보시스템을 이용한 에너지원 발굴의 기반환경이 필요하다. 본 연구에서는 연평균강우량, 유역면적, 유출계수를 세분화시켜 840개의 표준유역에 대한 소수력 발전소 시설용량과 연간전기생산량을 산정하였으며, 산정된 소수력 자원량과 분석기능, 그리고 국내 소수력 자원지도시스템에서 제공되지 않았던 소수력 발전소 현황, 하천, 유역, 강우관측소, 수위관측소 등에 대한 기초정보를 제공하여 소수력 지리정보시스템을 구축하였다. 구축된 소수력 지리정보시스템은 전국에 산재되어 있는 소수력 자원의 적극적인 활용을 위한 기초정보로 활용될 수 있을 것으로 사료된다.

소수력용 수차의 종류 및 설치 예 (Classification and Installation Cases of Small Hydraulic Turbine)

  • 최영도;김유택;이영호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.503-506
    • /
    • 2006
  • Recently, small hydropower attracts attention because of its clean renewable and abundant energy resources to develop. However, suitable turbine type is not normalized yet in the range of small hydropower and it is necessary to study for the effect ive turbine type. Moreover, relatively high manufacturing cost by the complex structure of the turbine is the highest barrier for developing the small hydropower turbine. Therefore, this study is trying not only, to classify the type of current operating turbines installed in the domestic power plants and turbines supplied in Japan by Japanese manufacturer but also, to examine the practical turbine type and installation site to extract the small hydropower energy effectively.

  • PDF

소수력 발전용 상용 프란시스 수차의 유동해석을 통한 성능 개선에 관한 연구 (A Study on Hydraulic Performance of Francis Turbine for Small Hydropower Plants)

  • 최주석;김옥삼;김일수;전철균;문채주
    • 한국태양에너지학회 논문집
    • /
    • 제25권3호
    • /
    • pp.19-25
    • /
    • 2005
  • Francis turbine of commercial small hydropower plants under 10kw which is investigate a flow characterist and an efficiency in the research which it sees, the problem and an improvement is investigate. In the research which it is simply model with casing, guide-vane, runner, draft tube for simulation numerical analysis of small-sized Francis turbine. Model uses the Gambit and it composes with approximately 800,000 non-uniform lattices. Solutions are investigate the hydraulic characteristics against an outward angle of guide vane, the number of guide vane, head(inlet velocity) by using FLUENT which is a commercial business code.