• Title/Summary/Keyword: Hydropower dam

Search Result 66, Processing Time 0.028 seconds

Analysis of Sediment Flushing Effect for Reservoir Sedimentation Management of the Patrind Dam in Pakistan (파키스탄 파트린드댐의 저수지 퇴사관리를 위한 배사효과 분석)

  • Noh, Joonwoo;Park, Jinhyeog;Hur, Youngteck;Kim, Sangho
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.6
    • /
    • pp.799-807
    • /
    • 2013
  • Reservoir sedimentation is one of the major concerns for sustainable reservoir operation. Since sediment concentration of the rivers in the Himalayan Mountain is very high, a proper sediment management scheme is necessary. This paper presents long-term reservoir sedimentation and sediment flushing based on the gate operation. Focused on the reservoir to be constructed for the Patrind hydropower project in Pakistan, 4 different flushing scenarios were proposed in this study to prevent successive sedimentation. By extending flushing period and by increasing the flushing discharge for 2 times, the flushing rate increases up to 53.2% and 43.6% in proportion to flushing period and discharge, respectively. Based on the simulation presented in this paper, it is expected to establish efficient sediment management plan to increase hydro power generation and sediment flushing simultaneously.

Prediction of reservoir sedimentation: A case study of Pleikrong Reservoir

  • Thu Hien Nguyen;XuanKhanh Do
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.36-36
    • /
    • 2023
  • Sedimentation is a natural process that occurs in all reservoirs. Sedimentation problem reduces the storage capacity of the reservoir and limits its ability to provide water for various uses, such as irrigation, hydropower generation, and flood control. Therefore, predicting reservoir sedimentation is important for ensuring the efficient operation and sedimentation management of a reservoir and . In this study, the HECRAS model was applied to predict longitudinal distribution of deposited sediment in the Pleikrong reservoir to 2050. Different scenarios was considered: (i) no climate change, (ii) climate change (under two emissions scenarios, RCP4.5 and RCP8.5), and (iii) climate change and land use change (followed land use planning of the watershed). The computation results with different scenarios were analyses and compared. The results show that the reservoir reduced storage volume's rate and sedimentation proceed toward to the dam in the case of climate change is faster than in the case of no climate change. Analyses also indicates that following the land used planning could also improve the long-term problem of the reservoir sedimentation. The outcomes of this study will be helpful for a sustainable plan of sediment management for the Pleikrong reservoir.

  • PDF

Channel Changes and Effect of Flow Pulses on Hydraulic Geometry Downstream of the Hapcheon Dam (합천댐 하류 하천지형 변화 예측 및 흐름파가 수리기하 변화에 미치는 영향)

  • Shin, Young-Ho;Julien, Pierre Y.
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.7
    • /
    • pp.579-589
    • /
    • 2009
  • Hwang River in South Korea, has experienced channel adjustments due to dam construction. Hapcheon main dam and re-regulation dam. The reach below the re-regulation dam (45 km long) changed in flow regime, channel width, bed material distribution, vegetation expansion, and island formation after dam construction. The re-regulation dam dramatically reduced annual peak flow from 654.7 $m^3$/s to 126.3 $m^3$/s and trapped the annual 591 thousand $m^3$ of sediment load formerly delivered from the upper watershed since the completion of the dam in 1989. An analysis of a time series of aerial photographs taken in 1982, 1993, and 2004 showed that non-vegetated active channel width narrowed an average of 152 m (47% of 1982) and non-vegetated active channel area decreased an average of 6.6 km2 (44% of 1982) between 1982 and 2004, with most narrowing and decreasing occurring after dam construction. The effects of daily pulses of water from peak hydropower generation and sudden sluice gate operations are investigated downstream of Hapcheon Dam in South Korea. The study reach is 45 km long from the Hapcheon re-regulation Dam to the confluence with the Nakdong River. An analysis of a time series of aerial photographs taken in 1982, 1993, and 2004 showed that the non-vegetated active channel width narrowed an average of 152 m (47% reduction since 1982). The non-vegetated active channel area also decreased an average of 6.6 $km^2$ (44% reduction since 1982) between 1982 and 2004, with most changes occurring after dam construction. The average median bed material size increased from 1.07 mm in 1983 to 5.72 mm in 2003, and the bed slope of the reach decreased from 0.000943 in 1983 to 0.000847 in 2003. The riverbed vertical degradation is approximately 2.6 m for a distance of 20 km below the re-regulation dam. It is expected from the result of the unsteady sediment transport numerical model (GSTAR-1D) steady simulations that the thalweg elevation will reach a stable condition around 2020. The model also confirms the theoretical prediction that sediment transport rates from daily pulses and flood peaks are 21 % and 15 % higher than their respective averages.

Rock Support Design of Bakun Tunnelling Project in Sarawak, Malaysia (바쿤 가배수로 터널의 최적지보설계)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.296-306
    • /
    • 1998
  • Ongoing huge Bakun Hydropower project is including the construction of a 210 m height hydroelectric rockfill dam with an installed capacity of 2,520 MW and a power transmission system connecting to the existing networks between Sarawak and peninsula Malaysia. In order to allow the main dam construction during the dry season, the Ballui river will have to be detoured through 3 concrete lined diversion tunnels with an internal diameter of 12 m and a length of 1,400 m each. The geology of Bakun site belongs to the several thousand meters thick Belaga formation deposited from the late Cteteceous to the early Teriary in the Northwest Borneo geosyncline. The orientation of the bedding plane, strike at N55$^{\circ}$E to N70$^{\circ}$E and dip at 50$^{\circ}$SE to 70$^{\circ}$SE, is developed uniformly in Bakun sedimentary rocks. Rock mechanical characteristics of Bakun site have been classified into 4 rock mass types(RMT) depending on the degree of weathering and the occurrence of rock jointing with RMR. Graywacke(Sandstone) as well as Shale can take place together in the same rock mass type if their rock mass properties are similar. It was summarized the rock support type and support system design of underground diversion tunnels in view of rock mechanics.

  • PDF

A Study on Improvement of Water Quality in Downstream at Hydropower Dam (양수발전댐 하류 하천 수질개선 방안 연구)

  • Choi, Byung-Kyu;Chun, Sang-Jin;Kang, Tae-Ho;Chung, Yo-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.643-647
    • /
    • 2007
  • 일반적으로 양수발전댐 설계시 하부댐 인근 하류하천의 유지용수 공급 및 하류지역 농업용수 공급을 위한 용수공급시설을 계획한다. 한편, 2006년 11월 준공 운영되고 있는 양양 양수발전소의 경우 댐하류 지역의 농업용수 및 하천 유지용수를 공급하기 위해 제체내 영구방류설비를 설치하여 비상시에는 하부지 저수량을 일정기간내 비울 수 있도록 계획 설치되어 있다. 평상시에는 하류지역 용수 공급으로 방류되는 방류량을 이용하여 소수력 발전을 계획하여 하부댐 우안측 여수로에 소수력 발전소를 건설 수자원의 효율성을 높이고자 하였으나 최근 집중호우와 양수발전소 준공후 발전기 시험가동을 한 결과 호우로 인한 상류로 부터의 탁수유입과 발전으로 인한 하부지내 담수지의 교란으로 인해 탁수가 발생하여 댐 하류지역 주민들의 민원이 제기되어 이에 대한 대책을 수립하고자 한다. 양수발전소 운영과정에서 상 하류 저수지 발전수량의 순환으로 생기는 탁수발생은 피할 수 없는 현상으로 판단되나 이에 대한 근본적인 해결방법을 모색하기 위해 5개안을 선정하여 검토한 결과, 상류계곡의 청정수를 이용 하부지 상류에 취수구를 설치 기존 취수구 전면에 연결하는 방안을 선정 댐 하류하천 수질개선 및 민원발생을 해소하는 방안을 수립하였다.

  • PDF

The Attitude Change of the Downstream Cambodian Government on the Development of Hydropower Dams in the Mekong River: The Background and Influential Factors (메콩강 수력발전댐 개발에 대한 하류국가캄보디아 정부의 태도 변화: 그 배경과 영향 요인)

  • JEON, Eun Jung;YUN, Sun-Jin
    • The Southeast Asian review
    • /
    • v.28 no.1
    • /
    • pp.219-261
    • /
    • 2018
  • The conflicts among nations surrounding international rivers are intensifying as worldwide water shortage is getting worse. The Mekong River is a representative trans-boundary river in Southeast Asia shared by six countries, China, Myanmar, Thailand, Laos, Cambodia, and Vietnam. As the economy grows, hydroelectric power has become a major power supply source to meet the increasing power demand of the these countries. However, the construction of dams on the Mekong River is controversial because hydroelectric power in the river upstream has a negative impact not only on the whole river ecosystem but also on residents' life around downstream, in particular. In order to understand the controversy arising from international rivers, it is necessary to take into account different positions of countries sharing it. However, studies on the position of a specific country to Mekong hydropower have been conducted mainly focusing on China and Laos. Therefore, this study tried to study the position of Cambodian government which is located downstream of the Mekong River and is likely to bear costs rather than to gain benefits from hydroelectric power generation. What is the attitude of the Cambodian government to the hydroelectric development of the upper Mekong and what is the reason for that? The study confirmed the Cambodian government's support for dam construction on the Mekong River. It also figured out influential factors on the formation of such a position as follows: 1) economic asymmetry with China, 2) power dependency and geographical asymmetry in Laos, and 3) importance of hydroelectric power in Cambodia.

Problems of Water Use and Estimation of Water Right in North Han River Shared by North and South Korea (II) - Estimation of Water Right in Downstream Area (남북공유하천 북한강의 물이용 문제점 및 수리권 추정 (II) -하류유역 수리권 추정)

  • Ahn, Jong-Seo;Lee, Gwang-Man;Jung, Kwan-Sue
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.4
    • /
    • pp.315-325
    • /
    • 2011
  • There are not many practical measures to solve a water conflict, when a hydromorphologically asymmetric situation in international rivers exists whereby downstream users may not affect upstream users but upstream users do cause downstream impacts. In taking advantage of this merit, North Korea has built Imnam Dam in upstream of North Han River and uses water for trans-basin hydropower generation. As an impact of this dam South Korean' area as a downstream user has been suffered from water deficit and dry river. It is very critical for South Korea to solve a key problem such as water allocation for water supply and river maintenance. Therefore, this study is aim to suggest alternatives for equitable water allocation in consideration of special circumstances between the South and the North. For this, reviewing the allocation methods of water rights is carried using lessons obtained from international river cases. The results show that the minimum desired streamflow is calculated at 7.3 $m^3/sec$; water budget analysis by the equitable distribution of streamflows at the border line of the North Han River, the difference in water supply deficiency is at 3.7 $m^3/sec$ before and after Imnam Dam; in the determined distribution method, the difference in water deficiency is at 11.38 $m^3/sec$. These results show that South Korea should be secured 11.38 $m^3/sec$ from North Korean's Imnam Dam in respective of water use right and sound river maintenance.

Water Demand and Supply Stability Analysis Using Shared Vision Model (Shared Vision 모형을 이용한 용수수급의 안정성 분석)

  • Jeong, Sang-Man;Lee, Joo-Heon;Ahn, Joong-Kun
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.7
    • /
    • pp.569-579
    • /
    • 2004
  • Recently, the extreme drought is often occurred due to the global warming and the serious weather changes. Also, the problems of the water pollution In the developed areas, the oppositions from people in the upper stream area and water concession from the local governments affect the national request to get more clean water resources in upper stream of the undeveloped areas. It also brings on the necessity of recognition for water supply managements. Therefore, as the water demand is rapidly changes in the metropolitan areas, the capability of water supply from the north Han river basin dams should be appropriately investigated. In this study, we developed a simulation system using STELLA (equation omitted) software environment, a shared vision model, to analyze the possibility of the stable water supply from north Han river basin dams. Also, three different rules are applied on this model by dividing the water level to minimum(Rule 1), medium(Rule 2) and maximum(Rule 3). Using the rules, the safety yield changes are analyzed for dam rule curve of the reservoir and hydropower release.

A Hydrological Analysis on the Gate Operation Rule of Dams in Han River Basin (한강유역(漢江流域) 댐군(群)의 수문조작방안(水門操作方案)에 관한 수문(水文) 해석(解析))

  • Lee, Won Hwan;Cho, Won Cheol;Lee, Jae Joon;Heo, Jun Haeng
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.91-100
    • /
    • 1985
  • This study is on the gate operation of dams, which are for the hydropower and multipurpose in Han River Basin, considering the safety under the emergency. The results of the study on the safety of dams in Han River Basin associated with the gate operation of dams against the design flood flow and the combined inflow are as follows; 1) The empirical formula (1) can be used for gate operation with the informations of reservoir's water level and the inflow. 2) The applicability of the multiple regression formula (2) among the gate opening area, inflow, water level, and outflow is assured. 3) From the safety analysis of dams for the emergency by the procedures developed in this study, six dams are safe except Soyanggang, Euiam, and Cheongpyung Dam, but the above three dams can be safe with the lowering of the starting water level of gate opening by the pre-discharges.

  • PDF

Soil Erosion Modeling in the 3S Basin of the Mekong River Basin

  • Thuy, Hoang Thu;Lee, Giha;Yu, Wansik;Shin, Yongchul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.7
    • /
    • pp.21-35
    • /
    • 2017
  • The 3S Basin is described as an important contributor in terms of many aspects in the Mekong River Basin in Southeast Asia. However, the 3S Basin has been suffering adverse consequences of changing discharge and sediment, which are derived from farming, deforestation, hydropower dam construction, climate change, and soil erosion. Consequently, a large population and ecology system that live along the 3S Basin are seriously affected. Accordingly, the calculating and simulating discharge and sediment become ever more urgent. There are many methods to simulate discharge and sediment. However, most of them are designed only during a single rainfall event and they require many kinds of data. Therefore, this study applied a Catchment-scale Soil Erosion model (C-SEM) to simulate discharge and sediment in the 3S Basin. The simulated results were judged with others references's data and the observed discharge of Strung Treng station, which is located in the mainstream and near the outlet of the 3S Basin. The results revealed that the 3S Basin distributes 31% of the Mekong River Basin's total discharge. In addition, the simulated sediment results at the 3S Basin's outlet also substantiated the importance of the 3S Basin to the Mekong River Basin. Furthermore, the results are also useful for the sustainable management practices in the 3S Basin, where the sediment data is unavailable.