수력발전소 설비 신뢰성 분석을 위한 FMEA (FMEA for Facility Reliability Analysis of A Hydro-power Plant)

  • 권창섭;전태보
    • 산업기술연구
    • /
    • 제26권B호
    • /
    • pp.135-144
    • /
    • 2006
  • The significance of hydro-power plant is increasing in its public roles such as flood control and water supply as well as electric power production. Even if high level of reliability in facility operation is required, no specific reliability research has been made. This specifically stems from the lack of technology and research investments. The eventual goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Specific effort was put to develop a reliability model for water supply system within hydro-power plant. For this study, we briefly examined the overview of the hydro-power plant including the electric power generation facility system. We then discussed the facility reliability analysis methodology for hydro-power plant. Based on rigorous examination of the water supply system and components roles, we drew major failure modes for each component and examined their effects.

  • PDF

양어장 방류수를 이용한 해양소수력발전소 구축에 관한 연구 (Construction of Marine Small Hydro Power Plant using Discharge Water of Fish Farm)

  • 황영철;최영도
    • 한국유체기계학회 논문집
    • /
    • 제16권5호
    • /
    • pp.11-17
    • /
    • 2013
  • This study is aimed to construct a marine small hydro power plant using discharge water of fish farm in Jeju Haengwon-ri. The difference of design methods between marine small hydro power plant and land small hydro power plant is to consider the tides. Moreover, ground condition should be examined because gushout sea water comes out from the ground at high tide in Jeju as the ground of Jeju beach consists of basalt stone. From the field test of the turbine generator after construction of the power plant, output power and efficiency of the turbine generator shows good conformance to the required conditions.

발전소 온배수의 수력에너지 개발에 관한 연구 (A Study on Hydro Energy Development of Discharged Cooling Water at the Power Plant)

  • 강금석;이대수;김지영
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2005년도 연구개발 발표회 논문집
    • /
    • pp.813-818
    • /
    • 2005
  • Cooling seawater of thermal power plant which amounts about 5 cms per 100 MWe has hydro energy of about 3,000 kW at the thermal power plant complex, but this useful hydro energy has not been developed. Therefore, the feasibility study on hydro energy development of three power plants located in the southern and western coast of Korea was performed. Three target power plants are Samcheonpo, Boryeong and Hadong thermal power plant. The design head to discharge cooling water by gravity and the head caused by tidal level in the southwestern coastal area, could be used for the production of electric power. The various alternatives were studied and technical feasibility and economical efficiency were clearly proved.

  • PDF

구미하수처리장 방류구에서의 소수력발전 설치 및 운영에 관한 연구 (Feasibility Study on the Construction of Small Hydro-Power Plants in Gumi Sewage Treatment Plant Discharge Point)

  • 나동훈;이승환
    • 상하수도학회지
    • /
    • 제24권2호
    • /
    • pp.173-181
    • /
    • 2010
  • This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.

원자력발전소 영구정지 시 소내전력공급계통 운영방안 (An Operating Strategy of In-house Power Supply Systems in the Permanent Shutdown Nuclear Power Plant)

  • 임희택;이광대;전당희;윤종현;주익덕
    • 전기학회논문지
    • /
    • 제67권2호
    • /
    • pp.337-342
    • /
    • 2018
  • Spent fuel is moved from the reactor into the spent fuel pool when nuclear power plant permanently shutdown. The sole function of a permanently defueled facility is to store spent fuel in a quiescent state. The function of electric system and loads are reduced. It is necessary to establish an operating strategy of electric system in the permanent shutdown nuclear plant. This paper reviews required loads and design criteria considering transition to permanent shutdown. An operating strategy of onsite electric system is proposed considering decommissioning strategy and stage of defueled condition.

수력발전소 물 공급 설비에 대한 FTA 모형 (FTA Modeling of Water Supply System for Hydro-power Plant)

  • 전태보;권창섭
    • 산업기술연구
    • /
    • 제26권B호
    • /
    • pp.145-155
    • /
    • 2006
  • High level of reliability in facility operation is specifically required these days. The goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Fault tree analysis of water supply system within hydro-power plant has been performed in this study. We briefly examined the electric power generation facility and water supply system. We then developed fault tree for the water supply system based on failure modes and effects analysis. We conclude this study and provided future research areas.

  • PDF