• Title/Summary/Keyword: Hydro power

Search Result 1,011, Processing Time 0.025 seconds

Power Circulation Characteristics of Hydro-Mechanical transmission System in Steering (정유압 기계식 변속기의 조향시 동력 순환 특성)

  • Kim, J. S.;Kim, W.;Jung, Y. H.;Jung, S. B.;Kim, H. S.
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.2
    • /
    • pp.13-22
    • /
    • 1997
  • Power flow characteristics of a hydro-mechanical transmission system(HMT) are investigated for tracked vehicle in steering. A HMT consisting of two hydrostatic pump motors(HST), several planetary gear trains and steer differential gear is considered. In order to obtain the direction and magnitude of the power flow of the HMT, network theory for the general power transmission is used. Network model for the HMT in steering is developed, which consists of shafts, nodes and transmission elements such as clutch, gear, etc. Power flow analysis procedure consists of two stages : (1) traction force analysis in steering, (2) power flow analysis in HMT. Torque and speed of every transmission element of the HMT is determined from the network analysis. Also, efficiency, mechanical and hydraulic power loss including HST, are obtained. In addition, the regenerative power flow resulting from steering can be studied in graphic display. The power flow analysis program(PCSTEER) developed in this work can be used as a useful design tool for the tracked vehicle with HMT.

  • PDF

CFD Analysis on the Hydro Turbine by the Existence of Blade Holes (블레이드 타공에 따른 수차의 유동해석)

  • Park, Yoo-Sin;Kim, Ki-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.675-680
    • /
    • 2017
  • Considering that most sewage treatment facilities have a water head of less than 2.0 m and a constant flow rate, the development of a small hydro power generation device capable of maintaining stable power generation and efficiency is urgently needed. In this study, a numerical analysis using the CFD code was carried out to develop a drag force type vertical axis hydro turbine for the improvement of the production efficiency of small-scale hydro energy underlow flow velocity conditions. The blade pressure changes and internal flows were analyzed in the presence or absence of hydro turbine blade holes at a flow velocity of less than 2.0 m/s. The pressure distribution of the hydro turbine blades with holes was found to be about 5.1 % lower than that of the hydro turbine blades without holes. The analysis of the internal flow around the water tank and hydro turbine blade revealed that the flow velocity varied with the vector distribution and that the flow velocity of the hydro turbine blades with holes was 5.6 % less than that of the hydro turbine blades without holes. It is believed that forming a hole in the blade may be helpful for its structural safety.

Control Modelling for Control Optimization of Gas Stripper System (탈기기 계통의 제어최적화를 위한 제어 모델링)

  • Lee, Kwang-Dae;Oh, Eung-Se;Kim, Jong-Won;Jeon, Dang-Hee;Hur, Jung-Won
    • Proceedings of the KIEE Conference
    • /
    • 2008.04a
    • /
    • pp.189-190
    • /
    • 2008
  • 원자력발전소의 탈기기 계통(Gas Stripper System)은 약 $25^{\circ}C$의 순수를 1.2기압, $105^{\circ}C$ 상태를 거쳐서 가스가 없는 상태(탈기)로 만들어 주는 계통이다. 탈기 상태를 유지하면서 지속적으로 순수를 만들기 위해서 본 계통에는 수위와 압력 제어루프가 있다. 탈기 상태에서는 탈기기 탱크내의 유체 상태가 이상(Two Phase)이기 차가운 급수를 사용한 수위와 압력 제어가 어렵다. 본 논문에서는 모델 기반으로 제어 최적화를 하기 위하여 제어 구성 요소들에 대한 제어 모델링 및 검증 과정을 기술한다. 제어모델링은 일반적으로 Parameter Identification 기법을 적용하지만, 유체역학 수식 모델, 운전 데이터, 탱크와 배관의 설계 자료 등을 이용한 경험적 방법을 적용하였으며 운전 데이터를 사용하여 검증하였다.

  • PDF

Reliability Improvement of Insulation Diagnosis Using the Hydro-Generator On-Line Partial Discharge Monitoring System (수력발전기 On-line 부분방전 측정 시스템을 이용한 절연상태 진단의 신뢰성 향상)

  • Ok, Yeon-Ho;Lee, Eun-Woong;Lim, Jae-Il;Park, Ji-Kun;Kwak, Won-Ku;Lee, Jae-Heung;Shin, Jae-Pil;Shin, Byoung-Chol
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.469-475
    • /
    • 2009
  • Accident dangerousness of domestic hydro power generators which are operated in Korea is on the increase because of use at the long term. On this, the Off-line diagnosis techniques developed to the On-line by continued domestic technical development since 2000. Especially, On-line insulation diagnosis of domestic hydro power generator is possible by localization of partial electric discharge sensor and On-line insulation diagnosis system. This paper shows the diagnosis result that is applied localized Ceramic Coupler and PDMS-HG(Partial Discharge Monitoring System for Hydro Generator) at four Chung-ju hydro Generator used for 25 years. Particularly, the confidence of insulation diagnosis is improved by using high frequency filter and sampling the partial discharge signals which occur in site. For reviewing the confidence of On-Line insulation diagnosis system, we measured the outside noises and partial discharge signals during practical operation by using the partial discharge diagnosis system of the Full A/D process. And we reviewed the confidence of the On-Line insulation diagnosis system by comparing and analyzing these data.

Statistical Approach for Derivation of Quantitative Acceptance Criteria for Radioactive Wastes to Near Surface Disposal Facility

  • Park Jin Beak;Park Joo Wan;Lee Eun Yong;Kim Chang Lak
    • Nuclear Engineering and Technology
    • /
    • v.35 no.5
    • /
    • pp.387-398
    • /
    • 2003
  • For reference human intrusion scenarios constructed in previous study, a probabilistic safety assessment to derive the radionuclide concentration limits for the low- and intermediate- level radioactive waste disposal facility is conducted. Statistical approach by the Latin Hypercube Sampling method is introduced and new assumptions about the disposal facility system are examined and discussed. In our previous study of deterministic approach, the post construction scenarios appeared as most limiting scenario to derive the radionuclide concentration limits. Whereas, in this statistical approach, the post drilling and the post construction scenarios are mutually competing for the scenario selection according to which radionuclides are more important in safety assessment context. Introduction of new assumption shows that the post drilling scenario can play an important role as the limiting scenario instead of the post-construction scenario. When we compare the concentration limits between the previous and this study, concentrations of radionuclides such as Nb-94, Cs-137 and alpha-emitting radionuclides show elevated values than the case of the previous study. Remaining radionuclides such as Sr-90, Tc-99 I-129, Ni-59 and Ni-63 show lower values than the case of the previous study.

A Study on Contact Characteristics of Mechanical Face Seals for a Hydro-power Turbine Depending on the Rubbing Surface Geometry (소수력 터빈용 기계평면시일의 표면마찰형상에 따른 접촉특성 해석에관한 연구)

  • Kim Chung-Kyun
    • Tribology and Lubricants
    • /
    • v.22 no.3
    • /
    • pp.119-126
    • /
    • 2006
  • In this paper, the contact behavior characteristics of a primary sealing components such as a seal ring and a seal seat has been presented for a small hydro-power turbine. Using the non-linear FEM analysis, the maximum temperature, the axial displacement, radial differences between a seal ring and a seal seat, and maximum contact normal stress have been analyzed for three optimized sealing profiles in which are designed based on the FEM analysis and Taguchi's experimental method. The three primary sealing profiles between a seal ring and a seal seat are strongly related to a leakage of a water for a hydro-power turbine and wear of a primary sealing component. The computed results show that the contact rubbing area between a seal ring and a seal seat is very important for reducing a friction heating and wear in a sealing gap, and increasing a contact normal stress in primary sealing components. Based on the FEM computation, models II and III in which have a small rubbing surface of seal rings show low dilatation of primary sealing components, and high normal contact stress between a seal ring and a seal seat. Thus, the FEM computed results recommend a short contacting width of a primary sealing component for reducing a leakage and thermal distortions, and expanding a seal life. This means that a conventional primary sealing component may be switched to a reduced sealing face of seal rings.

A Study of Design factors for Increasing Energy Production in Small Hydro power with Using Long Pipe (장대관로를 이용한 소수력 발전량 향상을 위한 설계요소에 관한 연구)

  • Kim, Hyun-Han;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.8
    • /
    • pp.1134-1139
    • /
    • 2014
  • Recently the need for renewable energy development is expanding due to the global climate change, the environmental issues and the limited fossil energy resources. Dependence of energy on overseas is high in Korea. To resolve the environmental problems and to improve the energy independence rate, the development of renewable energy is more required. The small hydro power, one of the renewable energy resources, has been developing and operating from a long time ago. If we are new developing a small hydro power with the use existing dams and reservoirs, we will design the length of inlet pipe and the diameter suitable for it. However, in case of using the existing water supply pipe which had been designed suitable for water service, the designer has to review and check that the pipe is suitable for operating a generator. In this paper, the design of small hydro power using the existing long pipe of water supply, we suggest the optimum way to reduce the water hammer in pipe which causes the unsteady flow during the load-shutdown of generator, the generator operation plan for the stable supply of water and the design factor of determining the generator capacity through the analysis between discharge and head-loss.

Wolsong 3&4 Steam Generator Tube Inspection (월성 3,4호기 증기발생기 전열관 검사)

  • Jang, Kyoung-Sik;Kwon, Dong-Ki;Choi, Jin-Hyuk;Son, Tai-Bong
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.859-866
    • /
    • 2001
  • During the Pre-service Inspection for Wolsong Unit 3&4 in 1997/1998 respectively, 17 Distorted Roll Transition indications(over expanded beyond tubesheet secondary face) were identified at the Unit 4 (S/G B, D). Six(6) tubes out of these tubes were plugged in 1998. However the first Periodic Inspection identified additional 110 indications in 1999 and 2000. The additionally identified 110 indication call, not reported at the Pre-service Inspection, are; 2 Not-Finally-Expanded-Tubes and 108 Distorted Roll Transition tubes. Design limit of each Steam Generator tube Plugging is 6.4%. Plugging was performed by the Steam Generator manufacturer under the warranty. When Distorted Roll Transition indications were first identified on the Unit 4 in 1998 the degree of Over-expansion was measured using an inner dial-gage to make the disposition of Nonconformance report. 2 Not-Finally-Expanded-Tubes were plugged and 10 tubes out of 108 Distorted Roll Transition Tubes were also plugged as a preventive measure.

  • PDF

Development of an Integrated Management System for Maintenance Parameters and Rotary Machine of Hydro-power Plant (수력발전소 정비변수 및 회전체 통합관리 시스템 개발)

  • Shin, Sung-Hwan;Park, Jin-Ho;Yoon, Doo-Byung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.263-269
    • /
    • 2012
  • Condition-based maintenance (CBM) has been used as a useful concept for optimizing maintenance plan and decreasing maintenance cost in several kinds of plant sites. This study introduced an example that developed an integrated management system for maintenance parameters and hydraulic turbine of hydro-power plant in order to improve its maintenance system as applying CBM techinique. The integrated management system consists of three parts. One is a hardware part including PDA inspection system and several kind of precision measuring instruments. Another is a vibration monitoring system on hydraulic turbine. The other is a software part that takes charge of making hierarchy tree of maintenance parameters and their inspection route, managing accumulated database, assessing health condition of components, and supporting interface with other enterprise management system. The system has been installed at Chuncheon Hydro-power plant for test and demonstration. It is expected that the system can contribute database construction for diagnostics and prognostics on facility health condition and systematic accumulation of know-how on operation and maintenance of plant.

  • PDF