• Title/Summary/Keyword: Hydro generation system

Search Result 92, Processing Time 0.026 seconds

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.57-60
    • /
    • 2006
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Report on Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계 사례)

  • Ko, Sung-Ho;Jeong, Yong-Chae;Choi, Seong-Pil;Kwack, Young-Kyun;Han, Seung-Yeul
    • The KSFM Journal of Fluid Machinery
    • /
    • v.13 no.1
    • /
    • pp.29-34
    • /
    • 2010
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

A Study on the Unit Commitment for Various Generation Type System (다양한 발전원 계통에서의 발전기 협조에 관한 연구)

  • 안재승;김성학;황갑주
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.5
    • /
    • pp.739-746
    • /
    • 1994
  • This paper present an efficient methodology to solve the unit commitment problem for large scaled power system which involves various type of generation. We introduce the global optimization approach to coordinate the thermal type, hydro type and pumped storage type generation. To overcome the shortcomings in dynamic programming for thermal unit commitment, an improved heurisitic method using lambda(λ) was proposed, Hydro and pumped type allocation was Solved by analytical approach using λ which exculde undisirable iteration for satisfying the energy usage constraints. The case studies for proposed algorithm are proven by sample system and KEPCO practical system, which produced very resonable both computing requirements and convergency.

Estimation of Annual Capacity of Small Hydro Power Using Agricultural Reservoirs (농업용저수지를 이용한 소수력의 연간발전량 추정)

  • Woo, Jae-Yeoul;Kim, Jin-Soo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.6
    • /
    • pp.1-7
    • /
    • 2010
  • This study was carried out to investigate the effect of hydro power factors (e.g., irrigation area, watershed area, active storage, gross head) on annual generation capacity and operation ratio for agricultural reservoirs in Chungbuk Province with active storage of over 1 million $m^3$. The annual generation capacity and operation ratio were estimated using HOMWRS (Hydrological Operation Model for Water Resources System) from last 10-year daily hydrological data. The correlation coefficients between annual generation capacity and the hydro power factors except gross head were high (over 0.87), but the correlation coefficients between operational rate and the factors were low (below 0.28). The optimum multiple regression equations of the annual generation capacity were expressed as the functions of watershed area, active storage, and gross head. Also, the simple regression equation of annual generation capacity was expressed as a function of watershed area. The average relative root-mean-square-error (RRMSE) between observed and estimated values by the optimum multiple regression equations was smaller than that by the simple regression equation, suggesting that the former has more accuracy than the latter.

Formation Strategy of Renewable Energy Sources for High Mountain Off-grid System Considering Sustainability (지속가능성을 고려한 산악지역 독립망 전력시스템의 신재생 에너지원 구성 전략)

  • Ahn, Sung-Hoon;Lee, Kyung-Tae;Bhandari, Binayak;Lee, Gil-Yong;Lee, Caroline Sun-Yong;Song, Chul-Ki
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.9
    • /
    • pp.958-963
    • /
    • 2012
  • Characteristics of off-grid hybrid renewable energy sources for high mountain villages are discussed. Considering reliability of electric power generation, Photovoltaic (PV)-wind hybrid and PV-hydro hybrid system are suggested. Connecting two or more villages with these hybrid systems, an extended hybrid off-grid can be formed. Sustainability of entire system is important in design of off-grid system, and income generation of the village people using the electricity should be considered.

FTA Modeling of Water Supply System for Hydro-power Plant (수력발전소 물 공급 설비에 대한 FTA 모형)

  • Jeon, Tae-Bo;Kwon, Chang-Seob
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.145-155
    • /
    • 2006
  • High level of reliability in facility operation is specifically required these days. The goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Fault tree analysis of water supply system within hydro-power plant has been performed in this study. We briefly examined the electric power generation facility and water supply system. We then developed fault tree for the water supply system based on failure modes and effects analysis. We conclude this study and provided future research areas.

  • PDF

Performance Evaluation and Economic Analysis on the Integrated Small Hydro Power Generation Device Using a Discharged Water of Sewage Treatment Plant (하수처리장의 방류수를 이용한 일체형 발전장치의 성능평가 및 경제성 분석)

  • Park, Yoo-Sin;Kim, Ki-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.486-491
    • /
    • 2017
  • The water discharged from sewage treatment plants has been considered to be useless, due to itslack of economic utility for small hydro power generation. Considering that most sewage treatment facilities have a water head of less than 2 meters and their flow rate is constant, it is necessary to develop a small hydro power generation device capable of maintaining stable power generation and efficiency. This paper presents the development of anintegrated small hydro power generation system and presents its performance evaluation and results. Then, the economics and use of the system for practical applications are suggested. As a result, it is foundthat the generator efficiency is 92%, the electric energy produced is 10kWh and the economic efficiency, as described by the B/C ratio,is 1.0 or more. Particularly, if the operating level of the generation device is maintained at 80% or more of the rated power, it is possible to secure its economic efficiency and, after 23 years, the investment cost will bereturned. The integrated hydro power generation device is expected to have a positive effect not only in terms of the water discharged from the sewage treatment plant, but also in terms of facilities capable of securing similar flow characteristics.

A New Probabilistic Generation Simulation Considering Hydro, Pumped-Storage Plants and Multi-Model (수력,양수 및 다중모델을 고려한 새로운 확률론적 발전시뮬레이션)

  • 송길영;최재석
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.40 no.6
    • /
    • pp.551-561
    • /
    • 1991
  • The probabilistic generation simulation plays a key role in power system expansion and operational planning especially for the calculation of expected energy, loss of load probaility and unserved energy expected. However, it is crucial to develop a probabilistic generation simulation algorithm which gives sufficiently precise results within a reasonable computation time. In a previous paper, we have proposed an efficent method using Fast Hartley Transform in convolution process for considering the thermal and nuclear units. In this paper, a method considering the scheduling of pumped-storage plants and hydro plants with energy constraint is proposed. The method also adopts FHT techniques. We improve the model to include multi-state and multi-block generation. The method has been applied for a real size model system.

  • PDF

Hydro-meteorological analysis of January 2021 flood event in South Kalimantan Indonesia using atmospheric-hydrologic model

  • Chrysanti, Asrini;Son, Sangyoung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.147-147
    • /
    • 2022
  • In January 2021 heavy flood affected South Kalimantan with causing many casualties. The heavy rainfall is predicted to be generated due to the ENSO (El Nino-Southern Oscillation). The weak La-Nina mode appeared to generate more convective cloud above the warmed ocean and result in extreme rainfall with high anomaly compared to past historical rainfall event. Subsequently, the antecedent soil moisture distribution showed to have an important role in generating the flood response. Saturated flow and infiltration excess mainly contributed to the runoff generation due to the high moisture capacity. The hydro-meteorological processes in this event were deeply analyzed using the coupled atmospheric model of Weather Research and Forecasting (WRF) and the hydrological model extension (WRF-Hydro). The sensitivity analysis of the flood response to the SST anomaly and the soil moisture capacity also compared. Result showed that although SST and soil moisture are the main contributors, soil moisture have more significant contribution to the runoff generation despite of anomaly rainfall occurred. Model performance was validated using the Global Precipitation Measurement (GPM) and Soil Moisture Operational Products System (SMOPS) and performed reasonably well. The model was able to capture the hydro-meteorological process of atmosphere and hydrological feedbacks in the extreme weather event.

  • PDF

The Best Generation Mix considering CO2 Air Pollution Constraint ($CO_2$ 배출량제약을 고려한 최적전원구성)

  • Lee, Sang-Sik;Tran, TrungTinh;Kwon, Jung-Ji;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.149-151
    • /
    • 2005
  • A new approach considering CO2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollutionconstraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant multi-years.

  • PDF