• Title/Summary/Keyword: Hydraulic line

Search Result 332, Processing Time 0.025 seconds

A study on hydraulic back analysis for an urban tunnel site and stability analysis based on hydro-mechanical coupling analysis (도심지 터널 용출수 발생구간에서의 수리 역해석 및 수리-역학 연계해석을 통한 안정성 해석 연구)

  • Park, Inn-Joon;Song, Myung-Gyu;Shin, Uyu-Soung;Park, Yong-Su
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.397-404
    • /
    • 2008
  • Excessive amount of groundwater flowed into tunnel, while constructing Incheon international airport railway. Tunnel passes under subway line no. 2 with only 1.76 m below. To protect the existing structure, TRcM excavation method was applied. As station and construction shaft are already constructed, which are located back and forth of TRcM section, 86.4 ton per day of groundwater inflow is against expectation. To identify mechanism of excessive water inflow, hydraulic back analyses were performed. Then, hydro-mechanical coupled analysis were also performed with the hydrogeologic parameters identified, whose results are investigated for checking the stability of adjacent structures to the tunnel under construction. And a number of mechanical analyses were also performed to check the hydro-mechanical coupling effect. The result from the mechanical analysis shows that subsidence and tunnel ceiling displacement will be 0.85 mm and 1.32 mm. The result of hydro-mechanical couple analysis shows that subsidence and maximum tunnel ceiling displacement will be 1.2 mm and 1.72 mm. Additional displacements caused by groundwater draw down were identified, however, displacement is minute.

  • PDF

A Numerical Model for Analysis of Groundwater Flow with Heat Flow in Steady-State (열(熱)흐름을 동반(同伴)한 정상지하수(定常地下水)의 흐름해석(解析) 수치모형(數値模型))

  • Wang, Soo Kyun;Cho, Won Cheol;Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.4
    • /
    • pp.103-112
    • /
    • 1991
  • In this study, a numerical model was established and applied to simulate the steady-state groundwater and heat flow in an isotropic, heterogeneous, three dimensional aquifer system with uniform thermal properties and no change of state. This model was developed as an aid in screening large groundwater-flow systems as prospects for underground waste storage. Driving forces on the system are external hydrologic conditions of recharge from precipitation and fixed hydraulic head boundaries. Heat flux includes geothermal heat-flow, conduction to the land surface, advection from recharge, and advection to or from fixed-head boundaries. The model uses an iterative procedure that alternately solves the groundwater-flow and heat-flow equations, updating advective flux after solution of the groundwater-flow equation, and updating hydraulic conductivity after solution of the heat-flow equation. Dierect solution is used for each equation. Travel time is determined by particle tracking through the modeled space. Velocities within blocks are linear interpolations of velocities at block faces. Applying this model to the groundwater-flow system located in Jigyung-ri. Songla-myun, Youngil-gun. Kyungsangbuk-do, the groundwater-flow system including distribution of head, temperature and travel time and flow line, is analyzed.

  • PDF

Selecting Aquifer Artificial Recharge Methods Based on Characteristics of the Target Aquifer (주입대상 대수층의 특성을 고려한 인공함양 방법 선정 연구)

  • Lee, Yeoung-Dong;Shin, Dong-Min;Kim, Byeong-Jun;Kim, Gyoo-Bum
    • The Journal of Engineering Geology
    • /
    • v.29 no.4
    • /
    • pp.483-494
    • /
    • 2019
  • This study aimed to determine the extent of artificial aquifer recharge and to evaluate appropriate recharge techniques based on field investigations and comparative analysis of each recharge method. Characteristics of the aquifer determine the target aquifer and the recharge method for artificial groundwater recharge. Electrical conductivity surveys, drilling, permeability tests, and grain-size analysis indicate that the hydraulic conductivity of weathered soil and weathered rock is higher than that of upper unconsolidated soil. Pumping tests indicate that the groundwater level was stable at a depth of 12 m until 9 hours of pumping, but after that it dropped again, indicating anisotropic aquifer characteristics. Three types of artificial recharge method were reviewed, including recharge wells, ditches, and ponds, and a combination of two methods is proposed: a recharge well system directly injecting into weathered soil and rock sections with good permeability, and an injection ditch that can increase the recharge effect by line-type injection in the upstream area. The extent of groundwater recharge by the selected methods will be evaluated through on-site tests and if their applicability is verified, they will contribute to securing water in areas of water shortage.

Development of Switching and Heating Devices in Embedded Rack Track for Environmental-friendly Mountain Railway (친환경 산악철도 매립형 궤도의 선로전환기 및 히팅장치 개발)

  • Seo, Sung-il
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.503-510
    • /
    • 2020
  • Eco-friendly mountain railways operate on concrete rack tracks embedded on existing sharp curved and steep roads to preserve the environment in mountainous areas. Owing to the narrow roads, single lines are inevitable, and many branches are required. In branches, previous switchers and heating devices cannot be applied, because of the limited spacing for the rack and the slow removal of thick ice. To solve these problems, a switch and a heating device have been developed. The switcher changes the line by moving the block of concrete track with hydraulic actuators. The lack of discontinuity reduces the derailment risk and makes locking simple. The heating device uses high frequency induction coils to increase the efficiency and melt the thick ice rapidly. The prototype switcher and heating device were produced and operated to prove their performance. The heating device yielded a 10 times greater efficiency than the previous one. The switcher and heating device are the essential core technologies for the operation of mountain trams in winter and contribute to the spread of mountain railways to domestic or foreign resort areas by enhancing safety and efficiency. In addition, they can provide transportation rights to local residents in poor winter traffic, and bring about tourism and local economic growth.

A Study on the Management and the Discharge of the Sluice Gates (배수갑문(排水閘門)의 관리(管理) 및 배제유량(排除流量)에 관(關)한 연구(硏究))

  • Kim, Tai Cheol;Lee, Duk Joo;Han, Young Soo
    • Korean Journal of Agricultural Science
    • /
    • v.17 no.2
    • /
    • pp.102-114
    • /
    • 1990
  • This study was carried out to analyze the operation of the sluice gates by taking Sabkyo Reservoir as the model, and to examine the formulae of the design criteria for the Agricultural Land Improvement Project by hydraulic model experiments. The results were summarized as follows ; 1. According to the records of gate operation for 9 years, the mean height of the opened gates was 4.13 m, the mean number of operated gates were 4.04, the average annual number of operation were 67 times, the average annual operating time were 192.5 hours, and the average operating time were 2.88 hours. 2. The water supplied through Sabkyo Reservoir was 88.15 megatons per year, which was about 1.4 times the effective storage capacity. And the annual volume of pumping in May, which is the most water demanding season, was 29.56 megatons in average. 3. As the submerged orifice was transformed into the surface orifice, the suggested formulae for the orifice flow on the design criteria for the Agricultural Land Improvement Project showed a discontinuous line on the transition zone. It should be improved, because it is different from the real hydraulic phenomena. 4. The formulae for the orifice flow which are divided into the submerged and surface orifices are being used. However, these formulae could be substituted for the formular, $q=C{\cdot}W\sqrt{2gH_1}$, if the discharge coefficient considering the reservoir water level, the sea water level, and the gate opening height is used.

  • PDF

Hydraulic Investigation of Pyokkolche Reservoir (벽골제의 수공학적 고찰)

  • Lee, Jang-U
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.397-406
    • /
    • 1998
  • The Pyokkolche Reservoir was constructed as a major public project of the ancient agricultural society, 1600 years ago. From a hydraulic point of view, it is considered to have been carried out with a distinguished technology. It should be in particular noticed that for a consecutive banking the main stream was diverted and drained to the Yonpo stream and the dam with same sea levels on its top along the whole length was built in a nearly straight line in spite of the different sea levels between both ends on the bottom. These suggest that the carrying out artifice and surveying technigue of those days were considerably excellent. However, the insufficient plan and design at the time of the construction, the temporary management and the repeated repair works in the later ages caused the Pyokkolche to lose its function. The Changsaenggeo and Kyungjanggeo gate sites being the facilities for sluices composed of a simple span and a vertical lift hand-operated sing a pully. The advantage of the geographical characteristics at both ends of the main dam was scientifically taken to these sites which also functioned as a spillway against a flood. The gate site of Suyogeo must have been located in an entrance to Suwolri, the northern end of the Pyokkolche and Yutonggeo is presumed to have been located on the right of Sangsori, the southern end of the Pyokklche. Keywords : Pyokkolche Reservoir, construction technology, gate site location.

  • PDF

Hydraulic Model Experimental Study on the Rope Kink Phenomena and Mooring Block Behavior under Wave Conditions at a Seaweed Farm (연승 수하식 양식시설의 파랑 중 해조류 꼬임 현상 및 계류용 블록 이동에 관한 수리모형 실험적 연구)

  • Kim, Heon-Tae;Choi, Jin-Hyu;Yoon, Han-Sam
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.1
    • /
    • pp.11-17
    • /
    • 2014
  • In this study, a hydraulic model experiment under wave conditions was carried out to investigate the gap/distance between two near-unit farm lines that affects the rope kink and shape variation of a seaweed farm during mooring block movement. As a result, rope kink occurred during the low wave height condition as the gap/distance between the two near-unit farm lines decreased. The seaweed farm maintained a stable shape in the higher wave height conditions as the gap/distance between the two near-unit farm lines increased. This result indicates that rope kink is sensitively affected by the gap/distance between the two near-unit farm lines. A tendency to increase the critical wave height was observed when mooring block movement occurred, and as the mooring block weight and wave period increased. From the experimental results in which incident wave conditions and the mooring block weight changed, as the front side mooring block weight increased from 3.0 to 8.0 tons, the seaweed farm was stable, and rear side mooring block movement hardly occurred. The observed tension of the seaside mooring line was a maximum at about 3.0 ton/m.

Numerical Analysis of the Hydraulic Characteristics of a Boundary Layer Streaming over Beach Cusps Surf-Zone Using LES and One Equation Dynamic Smagorinsky Turbulence Model (LES와 One Equation Dynamic Smagorinsky 난류모형을 이용한 Beach Cusps 쇄파역에서의 경계층 Streaming 수치해석)

  • Cho, Yong Jun
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.32 no.1
    • /
    • pp.55-68
    • /
    • 2020
  • In order to investigate the hydraulic characteristics of a boundary layer streaming over the beach cusps appeared in swells prevailing mild seas, we numerically simulated the shoaling process of Edge waves over the beach cusp. Synchronous Edge waves known to sustain the beach cusps could successfully be duplicated by generating two obliquely colliding Edge waves in front of beach cusps. The amplitude AB and length LB of Beach Cusp were elected to be 1.25 m and 18 m, respectively based on the measured data along the Mang-Bang beach. Numerical results show that boundary layer streaming was formed at every phase of shoaling process without exception, and the maximum boundary layer streaming was observed to occur at the crest of sand bar. In RUN 1 where the shortest waves were deployed, the maximum boundary layer streaming was observed to be around 0.32 m/s, which far exceeds the amplitude of free stream by two times. It is also noted that the maximum boundary layer streaming mentioned above greatly differs from the analytical solution by Longuet-Higgins (1957) based on wave Reynolds stress. In doing so, we also identify the recovery procedure of natural beaches in swells prevailing mild seas, which can be summarized such as: as the infra-gravity waves formed in swells by the resonance wave-wave interaction arrives near the breaking line, the sediments ascending near the free surface by the Phase II waves orbital motion were carried toward the pinnacle of foreshore by the shoreward flow commenced at the steep front of breaking waves, and were deposited near the pinnacle of foreshore due to the infiltration.

Evaluation of Pilot scale Coagulation system Design for CSOs treatment (CSOs 처리를 위한 실증규모 응집침전시스템의 설계평가)

  • Lee, Seung-Chul;Ha, Sung-Ryong
    • Journal of Wetlands Research
    • /
    • v.15 no.1
    • /
    • pp.1-8
    • /
    • 2013
  • A pilot scale coagulation system, which has a function of physicochemical treatment, was developed to treat Combined sewer overflows(CSOs). This coagulation system requires evaluation of optimum design factors whether it has reflected those of lab scale system, moreover, the pilot scale system can be evaluated differently according to the characteristics of influent CSOs even though it has reflected lab scale's design factors. We conducted an experiment using lab scale system that could treat $1m^3$ of CSOs in a day, and also pilot-scale system with $100m^3/day$ CSOs flowed into the Cheongju sewage treatment plant. Therefore the aim of this study is to evaluate a hydraulic similarity between the design factors of pilot scale and those of lab scale coagulation system, and to evaluate feasibility of the coagulation system for the CSOs treatment with optimum operation conditions. From the result of pilot-test, we drew the optimum operation factors of in line mixer and flocculator having similarities with those of lab scale system as well as the optimum coagulant dose. Finally we confirmed that the coagulation system has feasibility to treat the CSOs with high removal efficiency.

On the Occurrence of Defects by Vehicle Type According to the Fire-fighting Vehicle Detailed Inspection (소방차량 정밀점검 분석에 따른 차종별 결함 발생에 관한 연구)

  • Lee, Jang Won;Han, Yong-Taek
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.112-119
    • /
    • 2021
  • Purpose: This study is based on the detailed inspection data for the last 6 years of fire-fighting high ladder vehicles, fire-fighting inflected ladder vehicles, fire-fighting chemical vehicles and fire-fighting pump vehicles used in front-line fire departments. The purpose is to contribute to the technological development of fire-fighting vehicles by grasping the implementation status of each city and province, the rate of defects, and the occurrence of defects by year. Method: The implementation status by city and province, defect incidence rate, and defect occurrences by year were analyzed. Result: From 2012 to 2017, when the average of 230 or more overhaul vehicles was requested, the results of each city/province show slight fluctuations, but the number of defects gradually decreased due to the old fire-fighting vehicle replacement project and the response of fire vehicle manufacturers. Conclusion: In the case of fire-fighting ladders, the incidence rate of defects was found to be in the order of elevator device, electric device, ladder device, and pneumatic supply device. And in the case of the fire fighting ladder, it was confirmed that the incidence of defects appeared in the order of the refractive ladder, hydraulic cylinder, hydraulic oil, and pneumatic supply device. In the case of fire-fighting chemical vehicles, it was confirmed that defects occurred in the powder fire extinguishing device, fire pump, vacuum pump, and pneumatic supply device.