• Title/Summary/Keyword: Hwangryong river watershed

Search Result 2, Processing Time 0.021 seconds

Nn Evaluation of Climate Change Effects on Pollution Loads of the Hwangryong River Watershed in Korea (기후변화에 따른 황룡강 유역의 오염부하 유출량 변화 분석)

  • Park, Min Hye;Cho, Hong-Lae;Koo, Bhon Kyoung
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.185-196
    • /
    • 2015
  • A conceptual watershed model HSPF (Hydrological Simulation Program-Fortran) was applied to the Hwangryong river watershed to evaluate climate change effects on pollution loads of the river. For modeling purposes, the Hwangryong river watershed was divided into 7 sub-watersheds. The model was calibrated and validated for the river discharges against the data observed in 2011 at several monitoring stations. The RCP scenarios were set up for the model simulations after being corrected by change factor method. The simulation results of the RCP 4.5 scenario indicate that the annual river discharge and concentrations of BOD, TN, TP of the Hwangryong river will continually increase during the second-half of the 21st century. As for the RCP 8.5 scenario, the simulations results imply that the pollution loads will increase during the middle of the 21st century reflecting the pattern of precipitation. Monthly distributions of the pollution loads for the RCP 4.5 and the RCP 8.5 scenarios show it will increase the most in September and February, respectively.

Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed (황룡강 유역 저수지군 하류하천 영향평가)

  • Hwang, Soon-Ho;Kang, Moon-Seong;Kim, Ji-Hye;Song, Jung-Hun;Jun, Sang-Min;Lee, Sang-Hyun;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.