• 제목/요약/키워드: Housing reconstruction project

검색결과 47건 처리시간 0.028초

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제24권3호
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

이웃협정에 의한 협조형 도시주택의 모델개발에 관한 연구 -순천시의 도심주택지에 있어서 케이스스터디 - (A Study on Model Development of Cooperative Urban Housing by Neighborhood Agreement - Case Study on the Inner Residential Area, Sunchon City -)

  • 김영석
    • 한국주거학회논문집
    • /
    • 제14권6호
    • /
    • pp.193-204
    • /
    • 2003
  • In connection with the plan for improving the residential environment gradually by analyzing the present condition of the reconstruction and parcel form of the housing area in a inner area, the main objective of this research is to develop a cooperative urban housing model based on the neighborhood agreement. The parcel form has a structure that is inappropriate for individual reconstruction; thus, the substantial improvement only through the residential environment improvement project has its limitations. As an alternative plan to resolve such limitations, I proposed a system that enables step-by-step reconstruction within the small-scaled blocks through the annexation of the land based on the neighborhood agreement. Nonetheless, I realized that it is difficult to apply such reconstruction system to individual housing. Therefore, I presented a design concept on the cooperative urban housing project as a residential form for the reconstruction inside blocks. A model plan vouches for its effectiveness. To apply substantially the cooperative urban housing plan based on the neighborhood agreement, we need to supplement the sectional plan system.

공동주택 재건축사업의 건설사업관리 적용방안에 관한 연구 (A Study on the CM Application to the Apartment Reconstruction Project - Focused on the CM Work Scope in the Reconstruction Project -)

  • 김관회;유명남;서재웅;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.251-256
    • /
    • 2001
  • 70년대 이후 급속히 건설된 공동주택은 시간이 경과함에 따라 구조체와 시설이 노후화 되면서 유지관리 비용이 상승하였고 또한 경제성장에 따른 생활수준의 향상으로 인해 주거공간으로의 기능을 상실하게 되었다. 이러한 이유로 인해 공동주택 재건축 수요가 창출되었고 90년대를 기점으로 활성화되었다. 그러나, 사업시행주체인 조합임원의 대부분이 비전문인이기 때문에 사업시행에 않은 문제점들이 발생하게 되었다. 본 연구에서는 이러한 문제점들을 해결하기 위한 방안으로 재건축조합의 전반적인 업무를 대행하고, 공정하고 투명한 절차에. 의해 사업을 추진할 수 있도록 공동주택 재건축사업에 대한 CM의 적용방안을 모색하고자 하며, 특히 재건축사업 추진단계별 CM업무를 제시하고자 한다. 또한 향후 재건축사업의 CM적용시 현실적으로 활용 가능한 업무를 중심으로 제안하여 조합과 CM회사에서 이를 활용할 수 있도록 하였다.

  • PDF

A STUDY ON APPLICATION OF CONSTRUCTION MANAGEMENT(CM) TO HOUSING RECONSTRUCTION/RENEWAL PROJECT IN KOREA - Focused on Application of Construction Management (CM) in Professional Management of Renewal Business(PMRB)

  • Changgyo Kim;Jaeyoul Chun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.649-654
    • /
    • 2005
  • A new law, the Urban and Living Environment Improvement Act, was established, promulgated, and entered into by the Ministry of Construction and Transportation as of 1st July 2003. This system under this law, which improves currently executed consulting process and upgrade its level, is to execute the legal process and procedures that are necessarily required for housing reconstruction/renewal project.. This system requires to be supplemented with addition of reasonable, logical, and systemized tools of system. Through concurrent application of professional management of renewal business(PMRB), more benefit will be provided to housing renewal associations that are constituted with residences concerned for execution of CM project.

  • PDF

재건축에 따른 건축밀도 및 주거환경의 변화 연구 (A Study on the Change of Architecture Density and Residential Environment according to Reconstruction)

  • 김홍배
    • 한국농촌건축학회논문집
    • /
    • 제19권1호
    • /
    • pp.35-42
    • /
    • 2017
  • This study aims to investigate the change in building density and residential environment after the reconstruction of decrepit public rental housing complexes formed in accordance with the Land Readjustment Project during the 1970s-80s. The results of this study can be summarized as follows: First, in terms of change in residential environment after the reconstruction, floor plans that were limited to two to four types and to small apartments measuring $42.9m^2$(13py)-$56.1m^2$ (17py) became varied, presenting 5-6 types of floor plans and various sizes of apartments. In particular, the reconstructed apartments were mainly built in a size smaller than 85($m^2$) and in the 3LDK floor plan and staircase-style unit architectural structure in order to reflect the lifestyle of residents. Second, in terms of change in building density after the reconstruction, the building coverage ratio did not change a lot, but the floor area ratio showed great change depending on the complex, ranging from a minimum of 2.9 times (Singdong Complex) to a maximum of 5.4 times (Eoyangdong Complex). Such change is attributable to the reconstruction policy that aims to improve the residential environment for original residents, secure economic feasibility and efficiency, and reflect the lifestyle of residents while incorporating dividends assigned to the existing housing project members as well as the maximum floor area ratio allowed by the regulation. Additionally, in terms of change in the number of floors and building density after the reconstruction, the former 5-story apartments were changed to apartments with 16-28 stories. Accordingly, the number of households in each complex has also increased by 20%. Third, according to the characteristics of parking facilities in terms of the size and density of parking spaces, former apartment complexes had only aboveground parking lots, not underground parking area. The newly constructed apartment complexes have underground parking space, and the parking-housing ratio is 1.1-1.3 cars.

AHP분석을 통한 가로주택정비사업의 개선방안 (Improvement of Small-size Multi-housing Area Reconstruction Project Using AHP Analysis)

  • 김석준;이상호;허영기
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.79-85
    • /
    • 2019
  • 최근에는 '빈집 및 소규모 주택정비에 관한 특례법'을 제정하여 정부정책사업으로 가로주택정비사업을 활성화하기 위해 노력하고 있다. 그라나 이 정책은 원도심의 노후 불량 건축물이 밀집한 가로구역에서 소규모 정비사업보다 대규모정비사업 이 더 적용돼서 실적이 매우 미흡하고 제도개선이 필요한 실정이다. 그래서 본 연구에서는 전문가 간담회와 설문조사를 통해 대규모 정비사업과 차별화된 법적인 공공지원 방안을 도출한다. 연구결과는 '층 면적 비율'과 '건축물의 높이제한 기준 완화'가 가장 효과적인 반면 '지자체에서 주민공동시설 유상매입 후 운영'은 미미한 것으로 나타났다. 이러한 결과는 그 지역의 사회환경을 파괴하지 않고 노후한 주택 지역을 정비사업을 하는 동시에 취약계층에 임대 주택을 제공함으로 공공기관에 큰 이익이 될 수 있다는 전망이다. 그리고 소규모 정비사업인 가로주택사업을 활성화하기 위해 효과적으로 도입하여 적용 가능한 특례항목을 제시함으로서, 도심지내 임대주택건설을 유도하고 세입자 우선공급을 통한 둥지내몰림 현상을 방지하며 신혼부부나 청년 등의 젊은 층 입주를 통해 노후주거지에 새로운 활력을 도모하는데 도움이 될 것으로 기대한다.

조합방식과 신탁방식의 재건축사업 및 재건축부담금에 관한 비교 연구 (A Comparative Study on the Association-led and Trust Company-led Methods in Reconstruction Business and Reconstruction Charges)

  • 이한창;유선종
    • 지적과 국토정보
    • /
    • 제49권1호
    • /
    • pp.29-43
    • /
    • 2019
  • 본 연구는 조합방식 재건축사업의 문제점을 해결하기 위하여, 조합방식 재건축사업의 대안으로 신탁방식 재건축사업의 신뢰성을 검증한다. 이를 위해 조합방식 재건축사업과 신탁방식 재건축사업의 사업기간, 사업수지, 재건축부담금 산정내역 등의 비교분석을 진행하였다. 연구 결과는 다음과 같다. 첫째, 사업 기간은 신탁방식의 재건축사업이 조합방식의 재건축사업보다 짧다. 둘째, 사업성은 신탁방식이 조합방식보다 좋을 가능성이 크다. 셋째, 재건축초과이익 산정 기간의 차이와 시행 주체 관련 비용 항목의 차이로 인하여 신탁방식이 조합방식보다 재건축부담금을 적게 부담하게 된다. 따라서 조합방식 재건축사업의 대안으로서 신탁방식 재건축사업의 안정성은 부분적으로 검증되었다. 신탁방식 재건축사업은 앞으로 더 확대될 것으로 예상된다.

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

주택재건축사업의 매도청구권 행사 절차의 문제점 분석 (Analysis of The Problem of Exercising the Right of Claim for the Sale of the Housing Reconstruction Project)

  • 김길찬;박경미;엄선용;이명훈
    • 한국콘텐츠학회논문지
    • /
    • 제11권7호
    • /
    • pp.508-518
    • /
    • 2011
  • 정비사업에 있어서 사업시행자가 사업을 시행하기 위해서는, 사업구역 내 부동산을 직접 취득 하거나 소유자들로부터 사업시행에 대한 동의를 받아야만 한다. 주택재건축사업의 경우 조합과 미동의자 사이에 부동산에 대한 협의가 이루어지지 아니할 때 원활한 사업진행을 위해 매도청구제도가 사용된다. 그러나 매도청구권 행사 절차에 대한 규정이 명확하지 않아 재건축사업의 이해관계자들 간의 분쟁이 다발하고 있으며, 이러한 법적분쟁은 사업기간 연장 및 사업비용 증가와 같은 재정적 문제로 직결 되며, 극단적인 경우에는 사업성이 상실되어 재건축사업을 포기해야 하는 사태를 유발하기도 한다. 따라서 본 연구는 매도청구권의 행사 절차와 관련된 법적분쟁에 있어서의 판례 및 실제 재건축 사업 사례를 살펴보고, 재건축사업의 이해관계자들에게 설문조사를 실시하여, 이해관계자 입장별 인식의 차이 및 매도청구권 행사 절차의 문제점을 도출한다. 그 결과를 바탕으로 이해관계자 다수가 원하는 매도청구권제도의 개선 방안을 제시함으로써, 법적 분쟁을 미연에 방지하여, 재건축 사업의 성공에 일조하는데 그 목적이 있다.

Revitalization of Urban Regeneration through the Happiness Housing Project as Public Housing Policy

  • Kim, Ok-Yeon;Lee, Jae-Pyeong
    • 토지주택연구
    • /
    • 제5권3호
    • /
    • pp.151-167
    • /
    • 2014
  • Urban space structure in South Korea when through drastic changes ever since public housing policies began their full-fledge implementation. That is, public housing policies represent the main cause for formation of the current urban space structure, as the public houses are constructed in accordance with changes of demographic/social structure, considering changes of housing demand, in urban spaces demanded by the end users. After rapid industrialization and urbanization in the 1960's, each government in different periods have implemented housing supply policies through massive urban developments, to resolve the issue of housing shortage and residential instability. Phase 1 New Towns were developed in the 1980's resulting in suburbanization of the Seoul Area, followed by urban sprawl due to construction of small-size New Towns after deregulation in the 1990's, and construction of Phase 2 New Towns for resolution of housing shortage in the early 2000's and the resulting urban problems. In the mid-2000's, construction of Bogeumjari houses in GB areas led to insufficient housing supply in downtown areas, and the period after 2010 witnessed continuous deterioration of existing urban areas and acceleration of the rental housing crisis caused by rental housing shortage in downtown areas. Moreover, the residentially vulnerable classes consisting of young, 1~2-member households is expanding, with the real estate market in recess. Therefore, the government is trying to achieve urban regeneration through public housing policies so as to resolve the urban space problem and the housing problem at the same time, and the Happiness Housing Project has been implemented as a policy to achieve that goal. The Happiness Housing Project for young, residentially vulnerable classes in downtown areas, is going through diversification aimed at conjunction with urban regeneration projects in downtown areas, as exemplified by conversion of rental houses in residential environment improvement project districts and redevelopment/reconstruction project districts into happiness housing, and supply of happiness housing in conjunction with small reorganization projects for deteriorated residential areas in such areas as those excluded from New Town designation. Continuous supply of Happiness Housing in conjunction with urban regeneration requires mixed-use residential development which includes convenience facilities and public facilities, along with improvement of rental conditions (rental period/rent) and diversification of project methods, considering that the project is implemented in downtown areas.