• Title/Summary/Keyword: Hot-firing Test Facility

Search Result 25, Processing Time 0.041 seconds

Sub-System Requirements of a Pressure-fed Hot-firing Test Facility for the Performance Assessment of a LRE Thrust Chamber (액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건)

  • Lee, Kwang-Jin;Lim, Byoung-Jik;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.15 no.4
    • /
    • pp.94-102
    • /
    • 2011
  • Sub-system requirements of a pressure-fed hot-firing test facility for performance assessment of a Liquid Rocket Engine(LRE) thrust chamber using Liquid oxygen and kerosene were described. These requirements were based on the experience of construction and operation of the ground hot-firing test facility which was used for the development of the KSR-III and a 30 tonf-class LRE thrust chamber. So it is expected that this paper is used as a basic material and an itemized previous review statement for the design and construction of a large hot-firing test facility.

Sub-System Requirements of a Pressure-fed Hot-firing Test Facility for the Performance Assessment of a LRE Thrust Chamber (액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건)

  • Lee, Kwang-Jin;Lim, Byoung-Jik;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.63-71
    • /
    • 2010
  • Sub-system requirements of a pressure-fed hot-firing test facility for performance assessment of a Liquid Rocket Engine(LRE) thrust chamber using Liquid oxygen and kerosene were described. These requirements were based on the experience of construction and operation of the ground hot-firing test facility which was used for the development of the KSR-III and a 30 $ton_f$-class LRE thrust chamber. So it is expected that this paper is used as a basic material and an itemized previous review statement for the design and construction of a large hot-firing test facility.

  • PDF

A Construction Scheme of Control System in a Ground Hot-firing Test Facility (지상연소시험설비의 제어시스템 구축 방안)

  • Lee, Kwang-Jin;Kim, Ji-Hoon;Kim, Seung-Han;Han, Young-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.468-471
    • /
    • 2012
  • This paper describes a construction scheme of hot backup or triple modular redundancy control system in a ground hot-firing test facility to carry out performance assessment of propulsion system used in a space launch vehicle. It was possible for a hot backup redundancy control system with manual operated console to simulate TMR control system. A console layout of control system in control center to restrict imprudent works of operators was proposed.

  • PDF

Rocket Engine Test Facility Improvement for Hot firing test of a Combustor in the 30-tonf class (30톤급 연소기의 연소시험을 위한 설비 개량)

  • Lee Kwang-Jin;Seo Seonghyeon;Lim Byoungjik;Moon Il-Yoon;Han Yeoung-Min;Choi Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • v.y2005m4
    • /
    • pp.313-317
    • /
    • 2005
  • The facility improvement for hot firing test of combustion chamber having thrust of 30-tonf class and chamber pressure of 60bara were performed at ReTF in KARI. The KSR-III main engine having combustion pressure of 13bara and thrust of 12.5tonf had been successfully tested in this facility. To increase the capability of the facility, the feeding and the trust measurement system have been modified. The modification of the feeding system plays also a role of ensuring the stability of propellant supply and two step ignition sequence of combustion chamber. The one-axis thrust measurement system of up to 60tons has been newly manufactured and installed in test stand and the water/kerosene supply lines with high pressure vessel of $4m^3$ and gas nitrogen vessel of $10m^3$ have been designed for regenerative cooling system. The results of cold flow test show that this facility has been successfully improved to satisfy the requirement for hot firing test of high performance combustor.

  • PDF

Methane Engine Combustion Test Facility Construction and Preliminary Tests (메탄엔진 연소시험설비 구축 및 예비 시험들)

  • Kang, Cheolwoong;Hwang, Donghyun;Ahn, Jonghyeon;Lee, Junseo;Lee, Dain;Ahn, Kyubok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.25 no.3
    • /
    • pp.89-100
    • /
    • 2021
  • This paper deals with the construction of a combustion test facility and preliminary tests for hot-firing tests of a methane engine. First, the combustion test facility for a 1 kN-class thrust chamber using liquid oxygen/gas methane as propellants was designed and built. Before hot-firing tests, the cold-flow tests of each propellant line and the ignition tests of torch igniter/afterburner were performed to verify propellant supply stability of the combustion test facility, operation of the control and measurement system, and successful ignition. Finally, a preliminary hot-firing test was conducted to measure the combustion efficiency, heat flux, and combustion stability of a thrust chamber prototype. The constructed combustion test facility will be helpfully used for basic research and development of methane engine thrust chambers.

Test Facility Improvement for Hot Firing Test of a 7-tonf Combustor (7톤급 연소기 시험을 위한 시험 설비 변경)

  • Kim, Hyeon-Jun;Lim, Byoung-Jik;Kang, Dong-Hyuk;Jae, Won-Ju;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.493-497
    • /
    • 2012
  • The rocket engine test facility(ReTF) was improved for hot firing tests of 7 ton-class liquid rocket engine combustion chamber, which will be used for the third stage of the Korea Space Launch Vehicle II(KSLV-II), considering convenience of operation and maintenance, flexibility and safety. In this paper, main modifications and functions of improved ReTF were described. 초 록

  • PDF

Rocket Engine Test Facility Improvement for Hot Firing Test of 75 ton-f Class Gas Generator and Cold Flow Test (75톤급 가스발생기 연소시험을 위한 시험장 개선 및 수류시험)

  • Kang, Dong-Hyuk;Lim, Byoung-Jik;Ahn, Kyu-Bok;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.29-33
    • /
    • 2009
  • On the basis of the development experience of a gas generator for the 30 ton-f thrust liquid rocket engine combustor a Subscale Ground Firing Test Facility was designed and fabricated for a gas generator for the 75 ton-f thrust liquid rocket engine combustor. The Subscale Ground Firing Test Facility developed is going to be used to develop 75 ton-f class gas generator. Acquired data and test technique from this facility will be used to develope the high performance liquid rocket engine combustor and the Ground Firing Test Facility. This report describes the improved Subscale Ground Firing Test Facility for 75 ton-f class gas generator and results of the cold flow test.

  • PDF

A Layout Plan of a Pressure-fed Hot-firing Test Facility for the Performance Evaluation of a Combustion Chamber (연소기 성능평가를 위한 가압식 연소시험설비의 배치 계획)

  • Lee, Kwang-Jin;Cho, Nam-Kyung;Han, Young-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.465-467
    • /
    • 2012
  • A layout plan of a pressure-fed test facility to carry out hot-firing test of liquid rocket engine combustion chamber and purpose of rooms located in the test building were proposed. The layout plan of suggested infrastructure in this paper was determined depending on the design of a vertical test facility to use the natural lay of the land and simulate the initial position of flight model.

  • PDF

Design Study for KSLV Integrated Power Plant Test Facility

  • Kang, Sun-Il;Lee, Jung-Ho;Kim, Young-Han;Oh, Seung-Hyup
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2004.03a
    • /
    • pp.573-576
    • /
    • 2004
  • KARI is achieving the KSLV program according to National Space Technology Development Program. In this paper, the authors are intended to introduce the Integrated Power Plant (abb. IPP) test facility which will be constructed for the variety of tests on KSLV program. IPP test facility refers to comprehensive testing equipment for liquid rocket launch vehicle. Using this facility, KARl can verify the adaptiveness of parts and subsystems for launch vehicle and finally can qualify the system characteristics of launch vehicle doing kinds of test including hot firing test. Using this facility, KARI can simulate the vehicle launching circumstances and it make to predict the performance of launch vehicle when its flight test.

  • PDF

Construction and Start-up Test of Hot-firing Test Facility for KSLV-II Combustion Chamber (한국형발사체 연소기 연소시험설비의 구축 및 시운전)

  • Lee, Kwang-Jin;Yi, Seung Jae;Seo, Daeban;Hwang, Chang Hwan;Woo, Seongphil;Im, Ji-Hyuk;Jeon, Junsu;So, Younseok;Kim, Chae-Hyoung;Kim, Sunghyuk;Kim, Seung-Han;Cho, Namkyung;Han, Yeoung Min
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.20 no.1
    • /
    • pp.69-75
    • /
    • 2016
  • This paper covers the result of construction and start-up tests of the KSLV(Korea Space Launch Vehicle)-II combustion chamber hot-firing test facility. This facility was constructed from 2012 to 2014. Start-up test of this facility began in the second half of 2014. Oxidizer cold flow test, fuel cold flow test and cooling water cold flow test were carried out as start-up test. Afterward, ignition test of combustion chamber was accomplished. The result of ignition test is applied to set up start-up sequence of KSLV-II combustion chamber and utilized as base line data for hot-firing test of low and normal design point.