• Title/Summary/Keyword: Hole Design

검색결과 909건 처리시간 0.025초

보행형 배추정식기 개발 (Development of Walking Type Chinese Cabbage Transplanter)

  • 박석호;김진영;최덕규;김충길;곽태용;조성찬
    • Journal of Biosystems Engineering
    • /
    • 제30권2호
    • /
    • pp.81-88
    • /
    • 2005
  • Manual transplanting Chinese cabbage needs 184 hours per ha in Korea. Mechanization of Chinese cabbage transplanting operation has been highly required because it needs highly intensive labor during peak season. This study was conducted to developed walking-type Chinese cabbage transplanter. In order to find out design factor of the transplanter, a kinematic analysis software, RecurDyn, was used. The prototype was tested in the circular soil bin and its operating motion was captured and analyzed using high speed camera system. Prototype was one row type which utilized original parts of engine, transmission and etc. from walking-type rice transplanter in order to save the manufacturing cost. Success ratio of pick-up device of hole-pin type and latch type were $96.0\%$ and $99.2\%$, respectively. which was highly affected by feeding accuracy of feeding device of seedling. Transplanting device of the prototype produced a elliptic loci which were coincident with those produced by the computer simulation. Prototype proved good performance in transplanting with mulching and without mulching operation, either. Working performance of prototype was 22 hours per ha and operation cost of the prototype was 961,757 won per ha. So, it would reduce $88\%$ of the labor and $29\%$ of operation cost.

넘어짐(전도) 재해예방 안전기준 개정(안) 연구 (A study of improvement on safety regulation for slip, trip and fall prevention)

  • 김정수
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2013년 춘계학술대회
    • /
    • pp.19-29
    • /
    • 2013
  • Slips and falls are associated with many occupational injuries in Korea. It is also estimated that slipping are major contributors to slip, trip and fall injury burden. So "LOCAL RULE ON OCCUPATIONAL SAFETY AND HEALTH STANDAR D" must be improved, especially article 3(prevention of slip, trip and fall). The primary purpose of the present study is to determine if, and to what extent, the standard could be improved in present environment. In order to fulfill our objective, the another regulation in Korea and foreign countries were investigated and reviewed. Many kind of standard, mandatory documents and guideline were also reviewed. And then, regulations, standard, guideline etc. reviewed were compared with each others. The article 3 was revised as below. 1. The floors of the traffic route in workplace shall have no hole or slope, or be uneven or slippery so as, in each case, to expose employees to slip, trip and fall risk, except if adequate measures have been taken to prevent a employees falling. 2. The employer shall design, install and fix the drain for effective drainage if fluid contaminants were frequently occurred. So far as is reasonably practicable, An employer shall keep the workplace clean, sanitary, and dry so that employees won't have any risk to tripping or slipping at the workplace. 3. To facilitate cleaning, every floor, workplace, and passageway shall be, so far as is reasonably practicable, kept free from protruding objects, splinters, holes, etc. Also, some criteria was developed in this study. Standard and criteria developed in this study will help to prevent slip, trip, and fall injuries.

  • PDF

초경엔드밀 적용 표면처리 조성별 마모특성 영향 평가 (The Evaluation of Wear Characteristics Depending on Components of Surface Treatment for Cemented Carbide Endmill)

  • 윤일채;김동배;윤국태;윤인준;이지형;고태조
    • 한국정밀공학회지
    • /
    • 제31권6호
    • /
    • pp.513-519
    • /
    • 2014
  • For depth machining in die and mold, Electrical Discharge Machining (EDM) is used generally. To make deep hole and deep shape efficiently, cemented carbide endmill for depth machining is necessary. For this purpose, cemented carbide endmill was designed using design of experiment (DOE). To improve cutting performance, endmill was coated with multilayer surface treatment, TiAlCrSiN and TiAlCrN, for higher wear resistance. In order to evaluate the endmill, Transverse Rupture Strength (TRS) test was tried for investigating the relationship between surface treatment and strength in endmill body. Scratch test was also used for measuring adhesion force of each surface treatment. To evaluate hardness of surface treatment, Atomic Force Microscope (AFM) analysis was carried out. Wear test was executed for characteristics of each surface treatment in high temperature. Consequently, TiAlCrSiN was superior to the TiAlCrN coating in case of high temperature environment such as cutting.

입체 재단과 평면 재단 방식의 토루소 원형 비교 - 유방 크기 75A와 75D를 중심으로 - (Comparison of Torso Pattern Made by Draping and Flat Pattern Method - Based on the Comparison between 75A and 75D according to the Size of Breast -)

  • 윤지현;박길순
    • 복식문화연구
    • /
    • 제18권5호
    • /
    • pp.892-907
    • /
    • 2010
  • The purpose of this study was to compare torso pattern made by draping and flat pattern method in terms of the size of breast. The size of this study was classified as 75A and 75D according to the size of breast. Each torso pattern by the combination of the size and pattern method was compared and analyzed. In order to test the fit of the draping and flat pattern that was developed according to the size of breast, the outer appearance was evaluated. The results of the study were as follows: First, The most striking size difference was difference between the front and the back on bust line level, which decides on position of the side seam in comparison of size between draping and flat pattern of 75A and 75D. In the flat pattern, the difference between the front and the back in the size of breast was consistent regardless of a change in the size of breast. However, in the draping, the bigger breast led to the bigger difference between the front and the back on bustline level. Second, the flat pattern in 75D was evaluated to be the worst in 27 items among total 46 items for the evaluation of outer appearance in the draping and flat pattern of 75A and 75D. Third, regardless of size, the draping was evaluated to be more suitable in the areas related to neck, arm hole, and waist dart than the flat pattern. These results are suggesting that the draping is a method of reflecting characteristic of the body type more accurately than the flat pattern, and that the draping is a more suitable method than the flat pattern for the design of clothing pattern of the body type with big breast like 75D.

토목 공학에서의 SASW 기법의 활용 (Applications of SASW Method to Civil Engineering)

  • 송명준;정연문;이영남
    • 지구물리와물리탐사
    • /
    • 제2권4호
    • /
    • pp.174-179
    • /
    • 1999
  • 토목구조물의 내진설계등에 필요한 탄성 계수중의 하나인 S파 속도의 측정을 위해서 통상적으로 시추공을 이용한 downhole 시험이나 crosshole 시험 또는 검층 조사를 실시하여 왔다. SASW(Spectral Analysis of Surface Waves, 주파수영역 표면파해석)기법은 이러한 공내 시험법들의 한계를 극복한 것으로서 지표면에서 표면파의 측정을 통해 지표 아래의 전단 강성 주상도를 추정하는 비파괴, 비관입 시험방법이다. 본 논문에서는 SASW기법의 원리를 간략히 언급하고 현장적용 가능성 파악을 위하여 여러 현장에서 수행한 SASW실험 결과를 요약하였다. 인천국제공항 현장에서의 동다짐 효과 판정, 마북리 시험터널의 라이닝 및 배면 암반 상태 파악, 콘크리트 옹벽의 두께 파악을 위하여 SASW기법을 성공적으로 활용하였으며 비파괴적, 경제적인 특징으로 인하여 그 외 다양한 분야에서도 SASW기법이 응용될 수 있는 가능성을 제시하였다.

  • PDF

대구경의 발파공을 적용한 터널 발파 패턴의 비용 효과 (Cost-effectiveness of Tunnel Blasting Pattern by Applying Large Blasting Holes)

  • 최원규
    • 융합정보논문지
    • /
    • 제10권7호
    • /
    • pp.147-152
    • /
    • 2020
  • 본 연구는 발파 설계에 있어서 발파공의 직경과 발파 패턴을 중심으로 비용 효과를 분석하기 위하여 수행되었다. 발파 패턴을 단일 직경 발파공으로 설계한 경우와 직경의 다른 2개의 발파공을 혼합하여 설계한 경우에 대하여 천공 시간, 장약 시간과 화약과 화공품 소모량을 비교 분석하였다. 소요 발파공 수는 단일 직경 발파공으로 설계할 경우와 직경이 다른 두 개의 발파공으로 설계할 경우 각각 138개와 93개로 나타났다. 직경이 다른 두 개의 발파공을 이용하여 설계한 경우, 단일 직경 발파공으로 설계한 경우보다 천공 시간은 139분이 단축되고 천공 효율은 25% 증가되었다. 규격이 다른 두 개의 발파공을 적용하여 설계한 경우, 작업 인원당 장약 단축 시간과 작업 효율 증가는 각각 22.5분과 33%로 분석되었다. 화약 소요량과 뇌관 소요량은 단일 규격 배열시 300개와 138개였으며, 혼합 규격 배열시 242개와 93개로 후자의 경우 각각 58개와 45개 적게 소요되는 것으로 나타났다. 직경이 다른 두 개의 발파공 혼합 설계 패턴은 발파 비용 절감의 잠재성을 가지고 있는 것으로 나타났다.

Complication incidence of two implant systems up to six years: a comparison between internal and external connection implants

  • Chae, Sung-Wook;Kim, Young-Sung;Lee, Yong-Moo;Kim, Won-Kyung;Lee, Young-Kyoo;Kim, Su-Hwan
    • Journal of Periodontal and Implant Science
    • /
    • 제45권1호
    • /
    • pp.23-29
    • /
    • 2015
  • Purpose: This study was conducted to compare the cumulative survival rates (CSRs) and the incidence of postloading complications (PLCs) between a bone-level internal connection system (ICS-BL) and an external connection system (ECS). Methods: The medical records of patients treated with either a ICS-BL or ECS between 2007 and 2010 at Asan Medical Center were reviewed. PLCs were divided into two categories: biological and technical. Biological complications included >4 mm of probing pocket depth, thread exposure in radiographs, and soft tissue complications, whereas technical complications included chipping of the veneering material, fracture of the implant, fracture of the crown, loosening or fracture of the abutment or screw, loss of retention, and loss of access hole filling material. CSRs were determined by a life-table analysis and compared using the log-rank chi-square test. The incidence of PLC was compared with the Pearson chi-squared test. Results: A total of 2,651 implants in 1,074 patients (1,167 ICS-BLs in 551 patients and 1,484 ECSs in 523 patients) were analyzed. The average observation periods were 3.4 years for the ICS-BLs and 3.1 years for the ECSs. The six-year CSR of all implants was 96.1% (94.9% for the ICS-BLs and 97.1% for the ECSs, P=0.619). Soft tissue complications were more frequent with the ECSs (P=0.005) and loosening or fracture of the abutment or screw occurred more frequently with the ICS-BLs (P<0.001). Conclusions: Within the limitations of this study, the ICS-BL was more prone to technical complications while the ECS was more vulnerable to biological complications.

터널 굴착면 여굴 최소화를 위한 발파암 분류(안) 및 공법 개발 연구 (A Study on the Development of the Rock Blastability Classification and the Methods for Minimizing Overbereak in Tunnel)

  • 이태노;김동현;서영화
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.303-310
    • /
    • 2002
  • Overbreak occurred inevitably in a tunnel excavation, Is the main factor for increasing cost and time in tunnel projects. Furthermore the damage to the remained rock mass related to the overbreak can give rise to a serious safety problem in tunnels. As a rule of thumb, causes for the overbreak are inaccuracy in drilling, the wrong design of blasting and selection of explosives, and heterogeneity in rock mass. Specially, the geological features of the rock mass around periphery of an excavation are very important factors, so a lot of researches have been conducted to describe these phenomena. But the quantitative geological classification of the rock mass for the overbreak and the method for decreasing the amount of the overbreak have not been established. Besides, the technical improvement of the charge method is requested as explosives for the smooth blasting have not functioned efficiently. In this study, the working face around periphery of an excavation has been continuously sectionalized to 5∼6 parts, and the new Blastability Index for the overbreak based on 6 factors of RMD(Rock Mass Description), UCS(Uniaxial Compressive Strength) JPS(Joint Plane Spacing), JPO(Joint Plane Orientation), JPA(Joint Plane Aperture) and FM(Filling Material) is proposed to classify sections of the working face. On the basis of this classification, the distance between contour holes and the charging density are determined to minimize the overbreak. For controlling the charging density and improving the function of explosives, the New Deck Charge(N.D.C) method utilizing the deck charge method and detonation transmission in hole has been developed.

  • PDF

인공지반을 적용한 사교하는 사면에서의 터널 갱구부 설계 (The design of outlet in inter-cross slope with tunnel which it applied forming artificial ground)

  • 박철숙;곽한;이규탁;김봉재;윤용진;김희광
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1532-1548
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.

  • PDF

정상류 침투를 가정한 강우시 사면안정해석기법 (A methodological approach for slope stability analysis in Steady state infiltration)

  • 송평현;유병옥;안광국
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.736-744
    • /
    • 2009
  • The abrupt failure of slope caused by a concentrated rainfall would be a disaster in this country. Specially, the soil slope may be collapsed by the rainfall seepage, however, there is not much information for the mechanism of slope failure during rainfall. As analyzing the stability of slope by rainfall, the conventional method is to put the ground-water level on the surface of slope. However, it may provide the over-reinforcement for the slope stability. Futhermore, although over-reinforcement for the slope was fulfilled, the possibility of potential slope failure still exists. In this study, the slope stability by the conventional design method and the causes of unstable slope during rainfall were investigated. To analyze the slope stability by rainfall, the computer program SEEP/W for the analysis of seepage was used. As changing the intensity and duration of rainfall in SEEP/W, the analysis were performed. After completion of analysis, the porewater pressure data from SEEP/W was applied to SLOPE/W. As a results of this analysis, it is not reasonable that the groundwater level is going up to the surface of slope during rainfall. Therefore, the conventional reinforcement for the slope stability is not obvious to satisfy the criterion safety factor during rainfall. The reasonable counterplan is to install drainage hole on the surface of slope in order to prevent erosion and debris flow.

  • PDF