• 제목/요약/키워드: Highway tunnel

검색결과 152건 처리시간 0.021초

Roof Panel Shield 공법을 이용한 철도지하횡단터널 굴착의 수치해석 연구 (Numerical Analysis of Crossing Tunnel Under Railroad using Roof Panel Shield Method)

  • 신은철;김중희;정병철;노정민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.655-660
    • /
    • 2005
  • Recently, the crossing tunnel has been constructed to maintain the operation highway as well as railroad. The advantages of adopting RPS method in crossing tunnel construction are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing tunnel construction.

  • PDF

Numerical modeling of two parallel tunnels interaction using three-dimensional Finite Elements Method

  • Nawel, Bousbia;Salah, Messast
    • Geomechanics and Engineering
    • /
    • 제9권6호
    • /
    • pp.775-791
    • /
    • 2015
  • Due to the extension of communication ways (metro, highways, railways), hence, to improve traffic flow imposes often the difficult crossing that generally drive to the construction of underground works (tunnel, water conveyance tunnel...) plays a major role in the redevelopment of urban areas. This study is focused on the assessment of the interaction response of parallel tunnels, so this study uses the results from the simulation of two tunnels to illustrate a few observations that may aid in practical designs. In this article, simultaneous drilling of highway's twin tunnels is simulated by means of Finite Element Method (FEM) implemented in Plaxis program. So the treated subject appears in a setting of geotechnical where one can be to construct several tunnels sometimes in a ground of weak mechanical characteristics. The objective of this study is to simulate numerically the interaction effects caused by construction of two parallels tunnels. This is an important factor in the study of the total answer of the problem interaction between parallels underground works. The importance of the effects transmitted is function of several parameters as the type of the works, and the mechanical characteristics (tunnel size, depth, and the relative position between two tunnels, lining thickness...). This article describes numerical analyses of two parallels tunnels interaction. This study will be applied to a real case of a section tunnel T4 of the highway East-West (Algeria); the study presented below comprises a series of numerical simulations of two tunnels using the computer program Plaxis which is used in the analyses is based on Finite Element Method.

Failure of circular tunnel in saturated soil subjected to internal blast loading

  • Han, Yuzhen;Liu, Huabei
    • Geomechanics and Engineering
    • /
    • 제11권3호
    • /
    • pp.421-438
    • /
    • 2016
  • Explosions inside transportation tunnels might result in failure of tunnel structures. This study investigated the failure mechanisms of circular cast-iron tunnels in saturated soil subjected to medium internal blast loading. This issue is crucial to tunnel safety as many transportation tunnels run through saturated soils. At the same time blast loading on saturated soils may induce residual excess pore pressure, which may result in soil liquefaction. A series of numerical simulations were carried out using Finite Element program LS-DYNA. The effect of soil liquefaction was simulated by the Federal Highway soil model. It was found that the failure modes of tunnel lining were differed with different levels of blast loading. The damage and failure of the tunnel lining was progressive in nature and they occurred mainly during lining vibration when the main event of blast loading was over. Soil liquefaction may lead to more severe failure of tunnel lining. Soil deformation and soil liquefaction were determined by the coupling effects of lining damage, lining vibration, and blast loading. The damage of tunnel lining was a result of internal blast loading as well as dynamic interaction between tunnel lining and saturated soil, and stress concentration induced by a ventilation shaft connected to the tunnel might result in more severe lining damage.

NATM 공법에 의한 고속도로 터널 공사 중 라돈 노출 평가 (Evaluation of Radon Exposure During Highway Tunnel Construction by New Austrian Tunneling Method)

  • 유예지;김형렬;강모열;최상준
    • 한국산업보건학회지
    • /
    • 제33권2호
    • /
    • pp.115-125
    • /
    • 2023
  • Objectives: This study was conducted to measure the level of radon in the air at a highway tunnel construction site in a gneiss area using the New Austrian Tunneling Method (NATM) and to evaluate exposure levels by occupation. Methods: Radon concentrations in the air were measured using E-PERM at points 300 m, 600 m, and 900 m from the tunnel entrance during the excavation and waterproofing work inside the tunnel. In addition, radon concentrations were measured during external excavation to compare with the inside of the tunnel. Personal exposure levels for major occupations including tunnel workers, construction equipment operators, waterproofers, shotcrete workers, and safety and health managers who participated in the construction were estimated using radon concentration measured in the work process area and working hours by occupation. Results: As a result of a total of 77 radon measurements, the geometric mean (GM) concentration was 71.1 Bq/m3, and the maximum concentration was 127.3 Bq/m3, which was below the indoor air quality criteria. Radon concentration by process decreased in the order of the tunnel excavation process (GM= Bq/m3, GSD=1.2), waterproofing process (GM=73.35 Bq/m3, GSD=1.2), and outside excavating process (GM=45.28 Bq/m3, GSD=1.2). Processes inside the tunnel were significantly higher than outside excavating processes (p<0.05). There was no statistically significant difference in radon concentration measured inside by distance from the tunnel entrance, but the innermost point of the tunnel, 900 m (GM=79.24 Bq/m3, GSD=1.27), measured the highest. Conclusions: The occupation with the highest individual exposure to radon was tunnel worker (64.16 Bq/m3), followed by construction equipment driver (64.04 Bq/m3) and waterproofer (63.13 Bq/m3).

터널운영시스템 표준화 연구 (A Study on the Standardization of Operation System for Road Tunnels)

  • 김태형;김진;금재성;태재호;김선홍;홍대희
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.75-79
    • /
    • 2008
  • Since tunnel construction order was placed one by one, various sensors and actuators installed at the RTU and higher level system in each tunnel maintenance office had their own protocols depending on construction company. The TGMS testbed established on the extended region of Yong-dong Highway, for example, did not have consistent protocol between each automation levels and management levels without considering the functions and/or roles of each level. The management sever in each tunnel was simply networked to the TGMS server. Therefore, it is impossible to implement a new control algorithm as well as to integrate each other since each tunnel was constructed by different company. So, if the construction company is out of business, there is no way to maintain the corresponding tunnel effectively. In order to solve this problem, all the necessary standard protocols was established between automation level and management levels. These interface standards provide the clear classification between individual tunnel system and tunnel management system. So, even if construction company is different, its effect is minimized, so that it is expected to successfully establish PC based TGMS.

  • PDF

공용중인 고속도로 터널내 연장별 온도 조사 분석 (Analysis of temperature distribution per length in highway tunnel)

  • 홍승호;이경하;김낙영;윤경구
    • 한국터널지하공간학회 논문집
    • /
    • 제7권3호
    • /
    • pp.259-267
    • /
    • 2005
  • 본 논문에서는 터널별로 매설된 온도계의 연중계측을 통하여 년 중 온도변화특성과 갱구부로부터의 길이별 온도변화특성, 터널연장별 대기 온도변화특성, 지표부 온도 변화특성을 분석하였다. 터널의 연장별 터널내 바닥부 온도 분포에 대한 분석 결과 입구부와 출구부가 다른 온도분포를 보임을 알 수 있었다. 출구부에서의 터널내 바닥부 표면온도 분포는 출구부에서 50m 지점까지는 온도가 변하다가 50m 이후 깊이에서는 터널연장에 상관없이 거의 일정한 온도분포를 보임을 알 수 있었다. 그러나 입구부에서의 터널내 바닥부 표면온도 분포는 출구부와 달리 터널내 길이 약 125~150m 지점에서 본도분포가 변하고 있음을 알 수 있었다. 이는 입구부로 유입되는 찬공기가 풍향 및 풍속의 영향을 받아 터널깊이 약 125~150m 지점까지 영형을 끼치는 것으로 보인다.

  • PDF

터널천단변위와 암석 또는 암반의 일축압축강도를 이용한 시공 중인 터널의 예비 안정성 평가 (The Pre-Evaluation of Stability during Tunnel Excavation using Unconfined Compression Strength of Intact Rock or Rock Mass and Crown Settlement Data)

  • 박영화;문홍득;하만복
    • 한국도로학회논문집
    • /
    • 제17권6호
    • /
    • pp.27-32
    • /
    • 2015
  • PURPOSES : It is difficult to estimate tunnel stability because of lack of timely information during tunnel excavation. Tunnel deformability refers to the capacity of rock to strain under applied loads or unloads during tunnel excavation. This study was conducted to analyze a methods of pre-evaluation of stability during tunnel construction using the critical strain concept, which is applied to the results of tunnel settlement data and unconfined compression strength of intact rock or rock mass at the tunnel construction site. METHODS : Based on the critical strain concept, the pre-evaluation of stability of a tunnel was performed in the Daegu region, at a tunnel through andesite and granite rock. The critical strain concept is a method of predicting tunnel behavior from tunnel crown settlement data using the critical strain chart that is obtained from the relationship between strain and the unconfined compression strength of intact rock in a laboratory. RESULTS : In a pre-evaluation of stability of a tunnel, only actually measured crown settlement data is plotted on the lower position of the critical strain chart, to be compared with the total displacement of crown settlement, including precedent settlement and displacement data from before the settlement measurement. However, both cases show almost the same tunnel behavior. In an evaluation using rock mass instead of intact rock, the data for the rock mass strength is plotted on the lower portion of the critical strain chart, as a way to compare to the data for intact rock strength. CONCLUSIONS : From the results of the pre-evaluation of stability of the tunnel using the critical strain chart, we reaffirmed that it is possible to promptly evaluate the stability of a tunnel under construction. Moreover, this research shows that a safety evaluation using the actual instrumented crown settlement data with the unconfined compression strength of intact rock, rather than with the unconfined compression strength of a rock mass in the tunnel working face, is more conservative.

철도 터널 공사시 지하수 발생량 산정에 관한 연구 (Evaluation of Groundwater Flow on Railroad Tunnel Excavation)

  • 어성욱;안태봉;최승선
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.448-453
    • /
    • 2005
  • Tunnel excavation is an inevitable process for railroad construction in Korea and it being a one of the major issues of its environmental impact assessment. Ground water flow by tunnel excavation is an important parameter to determine environmental effects. The current method to determine the ground water flow is used a unit number induced a highway construction site. But it does not consider any site characteristics; ground water level, soil properties and others. The purpose of this study is to suggest the determination way of ground water flow considering site characteristics in tunnel construction.

  • PDF

Seismic responses of a metro tunnel in a ground fissure site

  • Liu, Nina;Huang, Qiang-Bing;Fan, Wen;Ma, Yu-Jie;Peng, Jian-Bing
    • Geomechanics and Engineering
    • /
    • 제15권2호
    • /
    • pp.775-781
    • /
    • 2018
  • Shake table tests were conducted on scaled tunnel model to investigate the mechanism and effect of seismic loadings on horseshoe scaled tunnel model in ground fissure site. Key technical details of the experimental test were set up, including similarity relations, boundary conditions, sensor layout, modelling methods were presented. Synthetic waves and El Centro waves were adopted as the input earthquake waves. Results measured from hanging wall and foot wall were compared and analyzed. It is found that the seismic loadings increased the subsidence of hanging wall and lead to the appearance and propagation of cracks. The values of acceleration, earth pressure and strain were greater in the hanging wall than those in the foot wall. The tunnel exhibited the greatest earth pressure on right and left arches, however, the earth pressure on the crown of arch is the second largest and the inverted arch has the least earth pressure in the same tunnel section. Therefore, the effect of the hanging wall on the seismic performance of metro tunnel in earth fissure ground should be considered in the seismic design.

터널 채널파를 이용한 사갱 연장성 규명 (Estimation of the continuity of inclined pits by tunnel channel wave investigation)

  • 김중열;방기문;정현기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.229-236
    • /
    • 2002
  • In this paper, a new novel technique of seismic survey is introduced to estimate the continuity of inclined pits filled with water, It was assumed that the pits would be connected to an abandoned railway tunnel that might be constructed in the past. Thus, detection of pit end was needed for the design of a new highway tunnel(Yukshimreong tunnel) that was likely to be met with a pit. In the beginning of exploration, no reliable, cost effective method was available. Hence, focus of interest moved toward the high impedance contrast(reflection coefficient k∼0.8) between water and rock. In this special model of sequence rock-water-rock, total reflection occurs and the seismic energy, when it is generated in the pit water, is nearly confined to the pit so that seismic waves can propagate much further within the pit. As a matter of convenience, this is called“tunnel channel wave”. With these considerations in mind, seismic detonator(2g) was used as a source at the entrance of pit, whereas hydrophone chain(hydrophone interval=1m) was placed on the bottom of pit. With this appropriate source-receiver arrangement, desirable down-going and up-going waves could be observed that will help conform the continuity of pits. After about one year, it was ascertained that the inclined pit of interest was just nearby crossed with the newly excavated tunnel, as it was predicted.

  • PDF