본 시공사례는 "중앙선 원주~제천 복선 전철 제 ${\bigcirc}$공구 노반 건설공사" 중 고속도로 하부통과 구간으로서 터널 노선 상부 13m에 운행 중인 고속도로가 있다. 고속도로에 영향을 최소화하기 위하여 무진동 암파쇄 굴착공법이 적용되었으나, 기계식 굴착작업 특성상 굴착 자체에 많은 시간이 소요되어 신속한 터널 폐합이 이루어지지 못해 굴착 중 주변 암반의 변위 증가에 따른 상부 침하가 우려되어 대안공법의 필요성이 요구되었다. 따라서 고속도로의 진동허용기준인 1.0cm/sec 이하로 제어하면서, 터널의 신속한 굴착과 폐합을 통해 지반의 변위를 최소화하여 상부 고속도로의 침하 현상을 방지할 수 있는 전자발파공법(eDevII)이 검토되었다. 사전 굴착영향검토를 시행한 결과, 전자발파를 통해 상부 고속도로의 안정적인 관리가 가능한 것으로 검토되었으며, 이를 기초로한 시공 결과 안전하고, 신속하게 굴착을 완료하였다.
Generally, it is well known that driving in tunnel imposes large burden to driver because of spatial constraint, limited visual field and so on. And such a burden of driver result in high accident occurrence. In this reason, studies dealing with features of driving and traffic flow in tunnel have been performed. However, information about characteristics of drivers and traffic in a very long tunnel is not accumulated yet. The purpose of this study is to identify the relations between tunnel length and burden of driver, driving patterns, traffic flow characteristics using the tunnel simulator that realizing various tunnel situations. For this, the tunnel simulation program was developed along 11km-length section. And biological data of 10 subjects gained from driving condition in simulation program was analyzed and compared with the result of real driving condition.
70~80년대에 다수의 고속도로 건설과 함께 축적된 고속도로 터널에 대한 설계 및 시공기술에 비하여 철도터널의 설계는 최근들어 활발하게 이루어지고 있는 상황이다. 따라서 고속도로 터널과 철도 터널의 비교시에는 다소간의 시간적인 차이가 있는 것이 사실이다. 본 논문에서는 서로 비슷한 굴착단면적을 갖고 있으나 단면형상에서 차이를 나타내는 고속도로 2차로 자연환기터널과 선로중심간격 4.3m의 복선철도 터널에 대해 동일한 조건하에서 지보재를 설치하지 않은 경우와 지보재를 설치한 경우에 대해 수치해석을 수행하여 단면형상 차이에 따른 터널 주변암반에 발생하는 주응력크기 및 축차응력 비교를 통한 터널의 안정성을 비교 분석하였다.
Wind tunnel test is often adopted to assess the site-specific wind characteristics for the design of bridges as suggested by current design standards. To investigate the wind characteristics of flat and mountainous terrain, two topographic models are tested in a boundary layer wind tunnel. The wind characteristics, including the vertical and horizontal mean wind speed distributions, the turbulence intensity, and the wind power spectra, are presented. They are investigated intensively in present study with the discussions on the effect of wind direction and the effect of topography. It is indicated that for flat terrain, the wind direction has negligible effect on the wind characteristics, however, the assumption of a homogenous wind field for the mountainous terrain is not applicable. Further, the non-homogeneous wind field can be defined based on a proposed approach if the wind tunnel test or on-site measurement is performed. The calculated turbulence intensities and wind power spectra by using the measured wind speeds are also given. It is shown that for the mountainous terrain, engineers should take into account the variability of the wind characteristics for design considerations.
The demand of tunnels has been increased for the linear improvement of general national highway, and road construction and/or enlargement in Korea. Also, the collapses of tunnel portal slope have been increased in recent due to heavy rain caused by global warming. Therefore, it has been risen the requirement of system for the stability of tunnel portal slope in Korea as well as all over the world. The objective of this research is to develop an effective maintenance system for supervising the tunnel portal slope. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed along general national highways.
This paper describes earthquake response of the Arhavi Highway Tunnel its geometrical properties, 3D finite element model and the linear time history analyses under a huge ground motion considering soil-structure interaction. The Arhavi Highway Tunnel is one of the tallest tunnels constructed in the Black Sea region of Turkey as part of the Coast Road Project. The tunnel has two tubes and each of them is about 1000 m tall. In the study, lineartime history analyses of the tunnel are performed applying north-south, east-west and up accelerations components of 1992 Erzincan, Turkey ground motion. In the time history analyses, Rayleigh damping coefficients are calculated using main natural frequency obtained from modal analysis. Element matrices are computed using the Gauss numerical integration technique. The Newmark method is used in the solution of the equation of motion. Because of needed too much memory for the analyses, the first 10 second of the ground motions, which is the most effective duration, is taken into account in calculations. The results obtained 3D finite element model are presented. In addition, the displacement and stress results are observed to be allowable level of the concrete material during the earthquakes.
In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.
PURPOSES : This study analyzed the difference in a driver's workload between using a driving simulator and field driving in tunnel, highway. METHODS : Based on the literature review, it was found that a driver's workload could be quantified using biosignals. This study analyzed the biosignal data of 30 participants using data collected while they were using a driving simulator and during a field test involving tunnel driving. Relative energy parameter was used for biosignal analysis. RESULTS : The driver's workload was different between the driving simulator and field driving in tunnels, highway. Compared with the driving simulator test, the driver's workload exhibited high value in field driving. This result was significant at the 0.05 level. The same result was observed before the tunnel entrance section and 200 m after the entrance section. CONCLUSIONS : This study demonstrates the driving simulator effect that drivers feel safer and more comfortable using a driving simulator than during a field test. Future studies should be designed considering the result of this study, age, type of simulator, study site and so on.
Journal of Korean Society for Atmospheric Environment
/
제9권E호
/
pp.397-400
/
1993
The possible air pollution problems in a proposed underground highway are discussed using carbon monoxide (CO) as an indicator. Carbon monoxide concentrations in the underground highway depend on several factors, including the size of tunnel, the number of automobiles, the CO emission rate, and the tunnel ventilation rate. Using the estimated values, CO concentrations in the underground highway can be predicted. Without proper ventilation system, CO concentration in the underground highway can be dangerous level. However, the cost of operating the mandatory mechanical ventilation system may be tremendouslyy high and may be technically unrealistic to implement. If the underground highway is constructed with proper ventilation system, a continuous air pollution monitoring system with alarming function must be installed to alert personnel of serious air pollution built up in the underground highway. Traffic must be restricted, whenever the inside air pollution levels exceed agreed values. Short distances between evacuation exits are necessary for emergency situations or malfunction of ventilation system.
최근 들어 인구증가와 경제발전에 따른 고속도로의 확장 또는 신설이 급증하고 있고 양호한 노선을 위해 터널 건설도 급속도로 증가하고 있다. 이와 더불어 터널 시공 중 붕괴가 발생할 수 있는 경우도 상대적으로 높아지고 있다. 특히, 도로의 양호한 선형 확보를 위하여 지반조건이 불량한 구간에서 터널 굴착이 증가하므로 적절한 보강공법의 적용 없이 굴착을 실시하는 경우에 붕락이 자주 발생하였다. 본 논문에서는 고속도로 터널 시공 중 보편적인 붕괴 사례를 조사함으로써 다른 지질조건에서의 붕괴원인과 형태 및 적용 보강공법에 대해 분석하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.