• Title/Summary/Keyword: Highway Management system

Search Result 239, Processing Time 0.032 seconds

A Study on Analysis of Performance Life for Hot Recycled Asphalt Pavements in the National Highway (일반국도의 가열 재활용 아스팔트 포장 공용수명 분석 연구)

  • Lee, Kanghun
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.117-129
    • /
    • 2017
  • PURPOSES : The purpose of this study is to analyze the performance life of hot central plant recycling (HCPR) and hot in-place recycling (HIR) pavements applied to the National Highway for the past 20 years and compare it with conventional hot-mix asphalt (HMA) pavement. METHODS : In order to analyze the performance life of recycling asphalt pavements, a comprehensive literature review was conducted to investigate the government law and official system for the use of recycling asphalt pavement in Korea and foreign countries. Next, the application information of using a hot central plant recycling and hot in-place recycling pavements in the national highway is collected from the database of pavement management system (PMS) and then their field condition is visually surveyed. Finally, the performance life of recycling asphalt pavements in the national highway is analyzed and compared with conventional hot-mix asphalt pavement. RESULTS :Institutions are encouraging the promotion of using recycled asphalt pavement through various legal systems in Korea as well as abroad. Based on analysis results for the average performance life of hot central plant recycling pavement applied to the national highway, the average performance life is estimated to be 10.2 years. However, the average performance life of in-place recycling pavement is estimated to be 6.5 years. However, it is expected to increase performance life after the HIR construction system is modified. CONCLUSIONS : Based on the limited data analysis of the performance life of recycled asphalt pavements, HCPR shows similar performance life to conventional asphalt pavement but HIR shows shorter performance life than conventional asphalt pavement. However, it is noted that all performance life data is very limited and it should be monitored and analyzed further.

Integration of Strategic Issue Management and Knowledge Management in View of Strategic Information Paradigm - An Integrative Framework

  • Yum, Ji-Hwan;Mallikarjun, M.
    • Proceedings of the CALSEC Conference
    • /
    • 2005.03a
    • /
    • pp.24-50
    • /
    • 2005
  • Knowledge management is a current management concept dealing with information gathering and implementation processes for the organizational performance advantage. The study investigates knowledge management in two perspectives: internally, Organizational information processing structure and externally, strategic issue management system. The study proposes the existence of filtering processes in the organizations. Based on this argument, the authors propose that organizations need to employ strategic issue management system for the successful implementation of knowledge management.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

Comparison and State Analysis of Slope Management System(SMS) at Home and Aboard (국내외 사면관리시스템의 비교 및 현황분석)

  • Kang, Ho-Yun;Jang, Yong-Gu;Hong, Soon-Hun;Kang, In-Joon
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.403-408
    • /
    • 2007
  • Korea is topographically and meteorologically prone to natural disasters. In addition to extraordinary weather, localized heavy rain is a irregular occurrence. Korea are frequently damaged by rain, wind, flood, etc. Recently, slope failures are disastrous when they occur in mountainous area adjoining highways. The accidents associated with slope failures have increased due to rapid urbanization of mountainous area. Therefore, the inspection of slope is conducted to maintain highway safety as well as road function. We developed basic function and risk management of a partial shape on highway slopes based on the internet. It is important for quantitative risk evaluation of highway slopes.

  • PDF

Extraction of Highway′s Superelevation Using GPS Real Time Kinematic Surveying (GPS 실시간 동적측위법을 이용한 도로 편경사 추출)

  • 서동주;장호식;이종출
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.2
    • /
    • pp.183-190
    • /
    • 2002
  • This study is about the extraction of highway's superelevation using real time kinematic surveying among of GPS surveying methods which is economic method to construct data base in the side of highway maintain management. Using the developed vehicle, center line and shoulder of highway are measured and enough precision is obtained after analyzing the result. The result is show that 1.3 cm to 2.0 cm error in the clothed and about 0.8 cm to 1.2 cm error in the circular curve. Those errors are proved error to lane making during construction. This study is expected to become efficient method for extraction of highway alignment elements in the Mobile Mapping System.

Performance Characteristics of the Thermal Management System for Passenger Hydrogen Fuel Cell Vehicle (수소연료전지 자동차의 열관리시스템 성능특성에 관한 연구)

  • Lee, Ho-Seong;Won, Jong-Phil;Cho, Chung-Won;Lee, Moo-Yeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.3
    • /
    • pp.986-993
    • /
    • 2012
  • The objective of this study is to investigate performance characteristics of the thermal management system for passenger hydrogen fuel cell vehicle under various operating conditions. The thermal management systems comprised of a stack cooling system, an electric device cooling system and an air conditioning system for a passenger room were tested with driving conditions. As a result, in highway driving mode, the cooling performance of the stack cooling system with air conditioning on condition was 28.8 % lower than that of the air conditioning off condition. And cooling load of the electric cooling system in the city driving mode was 65.6% higher than that of the highway driving mode.

The Study on an Automated Generation Method of Road Drawings using Road Survey Vehicle (도로교통안전점검차량을 이용한 도로의 자동도면화 생성 연구)

  • Lee, Jun Seok;Yun, Duk Geun;Park, Jae Hong
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.91-98
    • /
    • 2014
  • PURPOSES : This study is to develop a automate road mapping system using ARASEO(Automated Road Analysis and Safety Evaluation TOol) for road management. METHODS : The road survey van named ARASEO(Automated Road Analysis and Safety Evaluation TOol) was used to generate highway drawings for Korea National Road number 37 automatically. In order to generate the highway drawings for purpose of road management, it is required to acquired the information for highway alignment, road width and road facilities such as safety barrier and road sign. Therefore the survey van acquired and analyzed the road width, median and guardrail data using rear side laser sensor of ARASEO and recognized the traffic control sign and chevron sign using foreside camera images. Also the highway alignment which is the basic information for highway drawing can be analyzed by acquisition the every 1m positional and attitude data using GPU and IMU sensor and developed algorithm. Finally, in this research the CAD based drawing software was developed to draw highway drawing using the analysis result from ARASEO. RESULTS : This study showed the comparison result of the surveyed road width and drawing data. To make the drawing of the road, we made the Autocad ARX program witch run in CAD menu interface. CONCLUSIONS : Using this program we can create the road center line, every 500m horizontal and vertical ground plan drawing automatically.

Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients (고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석)

  • Eung Ho Park;Su Dong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.

Application of Mobile Mapping System for Effective Road Facility Maintenance and Management (효율적인 도로 시설물 유지관리를 위한 모바일 매핑 시스템 활용에 관한 연구)

  • Kim, Moon-Gie;Sung, Jung-Gon
    • Korean Journal of Remote Sensing
    • /
    • v.24 no.2
    • /
    • pp.153-164
    • /
    • 2008
  • According to the economic growth, many highways are constructed for increasing need of better life style. Especially roads and roadside facilities are used for accident prevention and offering mobility for drivers. For these purpose, roads and roadside facilities should be well maintained and managed. Now, many roads and roadside facilities are constructed in many areas. Because of traditional surveying method requires much time and surveying efforts, we designed and developed mobile mapping system for highway maintenance and management purpose using multi sensors. We tested our mobile mapping system and data management process. Using developed database, road managers can easily check the information of facility conditions, positions, and attributes. We are expecting low cost and efficient road maintenance process by using our system.