• 제목/요약/키워드: High-speed Railway

검색결과 2,291건 처리시간 0.032초

한국 고유형 고속전철 디자인 방법론 (Design Methodology of the Korean High Speed Train)

  • 이병종;정경렬
    • 한국철도학회논문집
    • /
    • 제5권3호
    • /
    • pp.142-147
    • /
    • 2002
  • This paper proposes the Systematic Design Methodology of the Korean High Speed Train. High Speed Train does not operate in isolation and is a part of a rail system which is influenced through input and output effects from the environment and from the neighbouring system. To fullfil its overall desired function, such input and output relationships between the systems must be considered in the system boundary conditions. Therefore, the overall interrelationship of all these effects has to be carefully considered during the design process. Here proposed methodology may provide a guide line and criteria for the systematic problem solving method of that highly complex High Speed Train System.

초고속 주행시 교량/토공 접속부 보강방안의 설계변수 분석 (Analysis of Design Parameters for Earthwork/Bridge Transition Structure for Ultra-High Speed Running)

  • 이일화;이성진;이수형;이강명
    • 한국철도학회논문집
    • /
    • 제18권2호
    • /
    • pp.117-126
    • /
    • 2015
  • 600km/h급 철도노반 개발은 초고속주행에 의한 동적상호작용의 예측이 어렵기 때문에 기술개발에 애로사항이 많다. 특히 교량/토공 접속부는 동적 상호작용을 포함하여 지지력, 압축, 침하, 배수, 유동 등의 영향 요소가 복합적으로 발생하는 구간으로서 접속부에서의 안정성이 확보된다면 초고속 열차용 토공노반의 안정성도 확보 가능할 것으로 예상된다. 본 논문에서는 초고속철도 접속구조개발의 기초 연구단계로서 국내 고속철도에서 적용하고 있는 접속부의 보강방안을 우선적으로 적용하여 초고속 주행시의 설계변수 영향을 해석적으로 검토하였다. 설계변수는 설계단계에서 검토 가능한 항목인 보강방안의 유무, 기하하적 형상, 재료의 강성 등이며, 분석내용은 초고속주행에 따른 궤도의 변형응답과 주행안정성을 검토하였다.

에너지 저장용 고속회전기의 실험적 평가 (Experimental Evaluation of an Energy Storage Device with High Rotaional Speed)

  • 이준호
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2014년도 추계학술대회 논문집
    • /
    • pp.193-196
    • /
    • 2014
  • Experimantal evaluation of an energy storage device with high rotational speed to store regenerative energy which might be generated during the braking period of the trains is presented. The proposed ESS is small scale model and has 5kW output power, high rotational speed. In general railway trains generate regenerative energy for 10-20 sec when the train brakes and also high traction energy is needed for very short moment (10 sec) when the train increases the traction force. Considering such characteristics of the railway system energy storage device for the railway should have very fast response property. Among the various energy storage devices flywheel energy storage system has the fastest response property, which means that flywheel ESS is the most suitable for the railway system.

  • PDF

철도차량 안전성을 위한 주행 차축의 비파괴 검사주기 평가 (Evaluation of Non Destructive Inspection Interval for Running Safety of Railway Axle)

  • 권석진;이동형;서정원;김재철
    • 한국정밀공학회지
    • /
    • 제31권9호
    • /
    • pp.777-782
    • /
    • 2014
  • Usually, railway axles are designed for infinite life based on endurance limit of the material and the axle is not fractured immediately when a surface crack initiated. The railway axles have been inspected regularly by NDT such as ultrasonic testing, magnetic testing and eddy current testing and so on. Because the axle failure is profoundly influenced by the probability of missing a fatigue crack during an NDT inspection, it is necessary to evaluate the Non Destructive Interval of railway axle. In the present paper, the Non Destructive Interval of railway axle based on fracture mechanics and finite element analysis was investigated. It was shown that the Non Destructive Interval of railway axle can be evaluated using fracture mechanics approach and extended using NDT which a crack can detect clearly.

경부고속철도 토공부에 대한 변형상태 계측 및 분석 (Measurements and Analysis of Deformation States in Roadbed in Gyeongbu High Speed Railway)

  • 진남희;김남혁;심현우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1542-1549
    • /
    • 2009
  • The function of subgrade in the railway is to support track load on the subgrade as well as train load. Unlike the traditional railway, the uppermost subgrade layer in the Gyeongbu high speed railway was constructed as the reinforced road bed. The reinforced road bed comprises sub-ballast in the upper part and grade ballast in the lower part. The filling material such as soil and rocks in the subgrade can be settled by consolidation of original ground, compression due to self weight, plastic displacement due to train operation, and unequal settlement due to embankment material or improper compaction, therefore many efforts have been given for sufficient compaction and use of proper filling materials in the construction stage. The purpose of this study is to investigate the deformation state of subgrade in the Gyeongbu high speed railway. The investigation on the subgrade settlement was performed by choosing representative sections suspected to be settled based on the previous GPR test results and track maintenance history, measuring the settlement for some time period after installing settlement measuring instruments on and under the reinforced road bed. and analyzing the long-term subgrade settlement data from monitoring system which was installed at the construction stage of the high speed railway.

  • PDF

Indirect displacement monitoring of high-speed railway box girders consider bending and torsion coupling effects

  • Wang, Xin;Li, Zhonglong;Zhuo, Yi;Di, Hao;Wei, Jianfeng;Li, Yuchen;Li, Shunlong
    • Smart Structures and Systems
    • /
    • 제28권6호
    • /
    • pp.827-838
    • /
    • 2021
  • The dynamic displacement is considered to be an important indicator of structural safety, and becomes an indispensable part of Structural Health Monitoring (SHM) system for high-speed railway bridges. This paper proposes an indirect strain based dynamic displacement reconstruction methodology for high-speed railway box girders. For the typical box girders under eccentric train load, the plane section assumption and elementary beam theory is no longer applicable due to the bend-torsion coupling effects. The monitored strain was decoupled into bend and torsion induced strain, pre-trained multi-output support vector regression (M-SVR) model was employed for such decoupling process considering the sensor layout cost and reconstruction accuracy. The decoupled strained based displacement could be reconstructed respectively using box girder plate element analysis and mode superposition principle. For the transformation modal matrix has a significant impact on the reconstructed displacement accuracy, the modal order would be optimized using particle swarm algorithm (PSO), aiming to minimize the ill conditioned degree of transformation modal matrix and the displacement reconstruction error. Numerical simulation and dynamic load testing results show that the reconstructed displacement was in good agreement with the simulated or measured results, which verifies the validity and accuracy of the algorithm proposed in this paper.

개선된 38자유도 차량모델을 이용한 고속철 PSC교량의 동적거동해석 (Dynamic Analysis of PSC Bridge for a High-Speed Railway Vehicle Using Improved 38-Degree of Freedom Model)

  • 오순택;심영우;이동준
    • 콘크리트학회논문집
    • /
    • 제22권6호
    • /
    • pp.797-803
    • /
    • 2010
  • 경부 고속철의 PSC 박스거더 교량의 동적응답에 대하여 보다 우수한 평가를 얻기 위한 동적거동해석방법을 개발하였다. 특히, 고속철 차량, 교량 그리고 궤도구조물간의 구조적 상호작용을 고려한 3차원 수치해석모델을 개발하여 고속철 속도에 의하여 발생되는 PSC 교량의 동적응답을 정확하게 해석하고 심도깊은 영향평가를 수행하였다. PSC 박스거더 교량은 40 m 경간의 단순교를 뼈대요소를 사용하여 3차원 프레임 모형화 하였다. K-TGV 고속철 차량은 동력차를 포함하여 다련 38자유도 모형으로 개발하고 차체와 대차의 연직변위, 횡변위, 종변위 및 피칭, 롤링, 요잉을 모두 고려하였다. 동적충격계수는 정적해석결과와 Runge-Kutta 기법으로 산출된 동적해석 결과를 비교 산출하였으며, 고속철 차량 속도에 따른 그 차이를 회귀분석을 통하여 추정실험식으로 제안하였다.

서비스수준(LOS)을 감안한 고속철도 노선 및 차량관리방안 (A Study on Managing High-Speed Railway Links and Rolling Stocks Based on the Level of Service)

  • 오재경;김시곤
    • 대한토목학회논문집
    • /
    • 제37권6호
    • /
    • pp.1025-1032
    • /
    • 2017
  • 본 논문에서는 고속철도 노선 및 철도차량의 서비스수준을 정의하고 이를 감안한 철도노선 및 철도차량의 관리방안을 제시하였다. 고속철도시설의 서비스수준(LOS) 등급은 A부터 F까지 6단계로 구분하여 제안하였다. 우선, 고속철도 노선의 서비스수준을 나타내는 효과척도는 열차지연으로 정의하였다. 구체적으로는 총 지연시간과 노선이용률 간 관계를 활용하여 서비스수준을 구분하였다. 추가적으로 노선용량이용율 (V/C)이라는 효과척도도 제시되었다. 한편, 고속철도 차량의 서비스수준을 결정짓는 효과척도는 차량 내 탑승 승객밀도로 정하였다. 좌석정원을 꽉채우는 수준을 LOS "D"로 정의하고 LOS A는 LOS D의 50%, LOS B는 LOS D의 70%, LOS C는 LOS D의 90%, LOS E~F는 최대 좌석수에 입석승차수를 감안하였다. 마지막으로 정부에서 정한 목표 서비스수준을 유지할 수 있도록 철도노선과 철도차량을 관리하는 방안을 제시하였다.

고속철도차량기술개발 표준 모니터링 절차에 대한 고찰 (A Study on Standard Monitoring Process in Development of High Speed Railway Vehicle)

  • 박민흥;김범진;김철수;최덕호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.528-535
    • /
    • 2011
  • According to railway safety regulations for securing the railway vehicle's quality and performance, it can be partly exempted that the performance tests and production inspections on the railway vehicles which are produced and assembled for the purpose of test and research. The reasons of this exemption are for ensuring maximum autonomy and for saving time considered the development period of railway vehicle. However, it was continuously demanded the necessity of supplementation on the confirmation about railway vehicle's quality & performance. Therefore, we added "The monitoring step" which is for securing the quality and performance in high speed railway vehicle's subsystem & compartment to supplement those tests & inspections in development. In this paper, based on a standard ABS(Activity Breakdown Structure) of railway vehicle and a WBS(Work Breakdown Structure) of the railway vehicle system, we investigate the necessity of monitoring in the High speed railway vehicle development. And by comparing and analyzing the essential requirements of international standard, IRIS(International Railway Industry Standard) & TSI(Technical Specification for Interoperability), we try to examine a standard monitoring procedure.

  • PDF

하이브리드 타입 에너지 저장장치의 교류 고속철도 적용 (Applying Hybrid Type Energy Storage System in AC High Speed Railway)

  • 전용주;강병욱;채희석;김재철
    • 조명전기설비학회논문지
    • /
    • 제28권9호
    • /
    • pp.60-66
    • /
    • 2014
  • In case of DC railway, value of ESS(Energy Storage System) is already approved. Whereas AC railway system, there are a lot of differences such as system design and operation pattern. Therefore there is doubt about AC ESS usefulness. Especially, regenerative energy can return to the source. So in case of AC 25kV system, it is necessary to consider different operation algorithm compare to DC railway system. In this paper ESS which is installed in AC high-speed railway was introduced. Power consumption pattern of High speed trains were analyzed, proper storage material was reviewed and operation algorithm was suggested. Super capacitor and Battery was used with hybrid type. Super capacitor was used to handle short term energy movement because of its prompt response and battery was used to handle long term energy movement because of its high energy density. Also in case of operation algorithm, phase control method was upgraded compare to voltage magnitude detection method.