In the middle of the 8th century, we met the new high-rise building, the 7th storied wooden pagodas in 'Kokubunji' in Japan. I tried to analyze and study this building to show how the wooden pagoda had changed itself because of appearance of new style. The conculusions are as follows; 1. The construction of the foundation was mainly composed namely 'Panchuk'. It was proceeded by two ways. One is the earthen-digging, laying foundations named 'Gulkwangpachuk' and the other is simply laying foundation named 'Jisangpanchuk'. In that period, due to the progress of the technique, we assumed that the main stream is 'Jisangpanchuk'. 2. The elevation of base was mostly the single foundation from archaeological study. The material was stone. The middle case of pagoda had the base of tile-roofed. We knew the just one pagoda had the base of brick, but that was not main stream. 3. The new device had appeared in the central base stone. It was the stone point. But in that period the existing method, a hole style and the new style was used in the central base stone. This fact is showed that the central government was not hold the reigon(it names 'Kook') in the respect of the technique. 4. The plan scale is classified of 3 group. As a result, the first body is larger, the main-unit and the sub-unit is a equal unit. But smaller, the length of main-unit is longer than the one of sub-unit. And the very small pagoda was build in that period.
The possibility of earthquakes in vulnerable regions indicates that efficient technique is required for seismic protection of buildings. During the recent decades, the concept is moving towards the insertion of base isolation on seismic prone buildings. So, investigation of structural behavior is a burning topic for buildings to be isolated in base level by bearing device. This study deals with the incorporation of base isolation system and focuses the changes of structural responses for different types of Lead Rubber Bearing (LRB) isolators. A number of sixteen model buildings have been simulated selecting twelve types of bearing systems as well as conventional fixed-base (FB) scheme. The superstructures of the high-rise buildings are represented by finite element assemblage adopting multi-degree of freedoms. Static and dynamic analyses are carried out for FB and base isolated (BI) buildings. The dynamic analysis in finite element package has been performed by the nonlinear time history analysis (THA) based on the site-specific seismic excitation and compared employing eminent earthquakes. The influence of the model type and the alteration in superstructure behavior of the isolated buildings have been duly assessed. The results of the 3D multistory structures show that the lateral forces, displacement, inertia and story accelerations of the superstructure of the seismic prone buildings are significantly reduced due to bearing insertion. The nonlinear dynamic analysis shows 12 to 40% lessening in base shear when LRB is incorporated leading to substantial allowance of horizontal displacement. It is revealed that the LRB isolators might be potential options to diminish the respective floor accelerations, inertia, displacements and base shear whatever the condition coincides. The isolators with lower force intercept but higher isolation period is found to be better for decreasing base shear, floor acceleration and inertia force leading to reduction of structural and non-structural damage. However, LRB with lower isolator period seems to be more effective in dropping displacement at bearing interface aimed at reducing horizontal shift of building structure.
Korean Journal of Construction Engineering and Management
/
v.6
no.6
s.28
/
pp.90-97
/
2005
Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.
Kim, Hye-Won;Lee, Byeong-Heun;Jin, Seung-Hyeon;Lee, Su-Gak;Kim, Jung-Yup;Kwon, Young-Jin
Fire Science and Engineering
/
v.33
no.4
/
pp.105-111
/
2019
In South Korea, smoke control systems are designed according to the fire safety standards NFSC501 and NFSC 501A. However, there is a problem in that the design values are incompatible when measuring the performance of the system after the design construction for calculating the leakage crack area described in the standards. Therefore, we compared the standards for smoke control systems from South Korea, Japan, and the United Kingdom. In South Korea, designs are conducted uniformly according to the NFSC 501A Manual, but in Japan and the United Kingdom, designs consider smoke temperature, duct loss, and fire floor air supply. Furthermore, they use larger values than in South Korea.
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.153-163
/
2013
As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.
Brick is not only aesthetically beautiful and emotional material, but also eco-friendly and good building commodity for human health. Nonetheless, the use of brick has declined, due to the difficulty of building high-rise buildings and the limitation of the free form implementation. However, modern society is increasingly interested in environmentally friendly finishing materials for solving environmental problems. From this point of view, the brick architecture is being reexamined as a material to improve the living environment and to provide comfort without destroying nature. In addition, the development of digital technology enables the implementation of various types of masonry method and curved forms. Parametric design is one of the ways to realize the curved forms and various architectural expressions for brick architecture. In this background, the purpose of this study is to develop algorithms that can easily generate curved brick walls through parametric design, enable various pattern designs, and respond to real-time feedback. The details of the study are as follows. First of all, we examine organic architecture, the trend of brick architecture, and the concept of parametric design. Secondly, In order to generate curved surface with complex curvature, major planning factors affecting form generation are examined. Finally, we develop a parametric design method that consists of generating a curved surface for brick arrangement, implementing a parametric algorithm, and generating a curved form using bricks. Consequentially, we propose an algorithm that can maximize the use of ready-made bricks without using cut bricks to design curved walls and present efficient and economical design alternatives.
Journal of the Korea Institute of Building Construction
/
v.16
no.4
/
pp.331-339
/
2016
According to high-rise, complexation, and enlargement of buildings, various construction methods are being developed, and the significance of construction method selection about main work types has emerged as a major interest. However, it has been pointed out that hand-on workers cannot consider project characteristics carefully, and they lack an objective standard or reference for main construction method selection. Hence, the selection is being made depending on hand-on workers' experience and intuition. To solve this problem, various studies have proceeded for construction method selection of main work types using Artificial Intelligence like Fuzzy, AHP and Case-based reasoning. It is difficult to apply many different kinds of construction method selection to every main work type with consideration for characteristics of work types and condition of a construction site when selecting construction method in the field. Accordingly, this study proposed the decision-making model which can apply to fields easily. Using matrix analysis and liner transformation, this study verified consistency of study models applied in the process of soil retaining selection with a case study.
Journal of the Computational Structural Engineering Institute of Korea
/
v.25
no.4
/
pp.339-346
/
2012
In this paper, equivalent models for active control devices are proposed so that building structures with such devices are analyzed using commercial structural analysis programs for the assessment of the structural members under active vibration control. Equivalent link models represent active control device with a virtual linear spring and dashpot, and equivalent force models are control force history acting at the installation point in structural models. Active controllers are designed based on the reduced-order models for a vertical cantilever model and a high-rise building model and corresponding equivalent models are determined from control gain matrices. Based on acceleration, displacement and member force responses, the effectiveness of the equivalent models is verified. As a result, proposed equivalent models, of which equivalent link model showed better performance, appear to enable detailed investigation of structural behavior to the extent of member force level.
Journal of the Korean Institute of Landscape Architecture International Edition
/
no.1
/
pp.176-182
/
2001
The case for study in this paper is the Main Plan and Management for the Fukutoshin; the restructure of Nishi Shinjuku, This plan was first outlines in 1960, and includes a vast area of 96 ha for redevelopment. It aims to create a totally new center in the city. This was the first case in Japan, and in the world of a plan of these magnitudes. involving urban landscape restructuring from three points: Landscape (open spaces for public use: the Shinjuku Central Park and the surrounding area of the buildings), transport and commercial building developments. The Landscape plan for the green areas was decided in a way to compensate the population of the area and the visitors. As a rule, high-rise building constructions are placed each one in single lots and are surrounded by open spaces and greenery. Pedestrain areas are widened and also connected by bridges in a way to allow free circulation, and interconnection between the constructions and the green areas. Another important factor is the role that Private Corporation, and public interest plays. Joining these two forces has allowed the concretization of this project. This interpolation between public and private roles was an innovation in Japan, and it also the key for the concretion of the project. The historical review of the process and management of this project help us to put into perspective the introduction of new concepts and ideas, which were not related at that time to traditional Japanese Landscaping. Furthermore we are better able to understand the substantial increase in the percentage of land dedicated to green areas in contrast to the typical standards of Japanese cities.
Journal of the Korea Institute of Building Construction
/
v.9
no.4
/
pp.85-92
/
2009
Urban regeneration projects have been actively proceeding all over Korea. Urban regeneration has become a critical issue in the domestic construction industry, with environmental-friendly construction and high-rise buildings being emphasized. Because these projectstend to become complex, urban regeneration projects require interest and approach on a level of program management that includes traditional project management. This paper develops aprototype for a new program management information system of a supports the promotion of urban regeneration projects through the deduction of the requirements about system. The prototype of the program management information system includes functions that supply diverse information, support the process and legislation of an urban regeneration project, manage stakeholders, support decision-making, estimate and manage program risks, and manage the program level.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.