• Title/Summary/Keyword: Height Determination

Search Result 341, Processing Time 0.024 seconds

Accuracy Analysis of GNSS-derived Orthometric Height in Mountainous Areas

  • Lee, Jisun;Kwon, Jay Hyoun;Lee, Hungkyu;Park, Jong Soo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.5
    • /
    • pp.403-412
    • /
    • 2018
  • Recently, GNSS (Global Navigation Satellite System)-derived orthometric height determination has been studied to improve the time and cost-effectiveness of traditional leveling surveying. However, the accuracy of this new survey method was evaluated when unknown points are located lower than control points. In this study, the accuracy of GNSS-derived orthometric height was examined using TPs (Triangulation Points) to verify the stability of surveying in mountainous areas. The GNSS survey data were obtained from Mungyeong, Unbong/Hadong, Uljin, and Jangseong. Three unknown points were surrounded by more than three UCPs (Unified Control Points) or BMs (Benchmarks) following the guideline for applying GNSS-derived orthometric height determination. A newly developed national geoid model, KNGeoid17 (Korean National Geoid 2017), has been applied for determining the orthometric height. In comparison with the official orthometric heights of the TPs, the heights of the unknown points in Mungyeong and Unbong/Hadong differ by more than 20 cm. On the other hand, TPs in Uljin and Jangseong show 15-16 cm of local bias with respect to the official products. Since the precision of official orthometric heights of TPs is known to be about 10 cm, these errors exceed the limit of the precision. Therefore, the official products should be checked to offer more reliable results to surveyors. As an alternative method of verifying accuracy, three different GNSS post-processing software were applied, and the results from each software were compared. The results showed that the differences in the whole test areas did not exceed 5 cm. Therefore, it was concluded that the precision of the GNSS-derived orthometric height was less than 5 cm, even though the unknown points were higher than the control points.

Preliminary Study of Vertical Datum Determination in Korea (수직기준 결정을 위한 기초 연구)

  • Jeong, Tae-Jun;Yun, Hong-Sic;Huang, He
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.55-58
    • /
    • 2007
  • This study describes a problem of the Original Bench Mark which is used currently. We calculate New Mean Sea Level(MSL) in Incheon Port using tide data for 57 months and take 8 points GPS/Leveling data in research area. We calculate orthometric height of one control point using tide data and GPS/Leveling data. After fixed the control point, we decide final orthometric heights using relative geoidal height and ellipsoidal height from GPS survey. To analysis the Original Bench Mark compares final orthometric heights with the orthometric heights in Korea height system. We get the result that the New Original Bench Mark's height is 26.7176m. It appears 3.05cm difference as the Original Bench Mark's height is 26.6871cm in Korea height system.

  • PDF

The conditional risk probability-based seawall height design method

  • Yang, Xing;Hu, Xiaodong;Li, Zhiqing
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.7 no.6
    • /
    • pp.1007-1019
    • /
    • 2015
  • The determination of the required seawall height is usually based on the combination of wind speed (or wave height) and still water level according to a specified return period, e.g., 50-year return period wind speed and 50-year return period still water level. In reality, the two variables are be partially correlated. This may be lead to over-design (costs) of seawall structures. The above-mentioned return period for the design of a seawall depends on economy, society and natural environment in the region. This means a specified risk level of overtopping or damage of a seawall structure is usually allowed. The aim of this paper is to present a conditional risk probability-based seawall height design method which incorporates the correlation of the two variables. For purposes of demonstration, the wind speeds and water levels collected from Jiangsu of China are analyzed. The results show this method can improve seawall height design accuracy.

Analysis of the Feasibility of GNSS/Geoid Technology in Determining Orthometric Height in Mountain (산악지 표고결정에 있어서 GNSS/Geoid 기술의 활용가능성 분석)

  • Lee, Suk Bae;Lee, Keun Sang;Lee, Min Kun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.25 no.2
    • /
    • pp.57-65
    • /
    • 2017
  • The purpose of this study is to analyze the feasibility of using Global Navigation Satellite System(GNSS)/Geoid technology in determining orthometric height in mountain. For the study, a test bed was set up in and around Mount Jiri and GNSS surveying were conducted. The orthometric height of 39 benchmarks was determined by applying the EGM2008, KNGeoid13, and KNGeoid14 geoid models and the accuracy was estimated by comparing with the offical Benchmarks orthometric height value issued by National Geographic Information Institute(NGII) and finally, the results were analyzed with the Aerial Photogrammetry Work Regulations. As a result of the study, it was found that the accuracy of the orthometric height determination by GNSS/Geoid technology was ${\pm}7.1cm$ when the KNGeoid14 geoid model was applied. And also, it can be confirmed that it is usable for the less than 1/1000 plotting scales as a vertical reference point for the aerial triangulation in Aerial Photogrammetry.

The Automatic Determination of the Optimal Build-Direction in Rapid Prototyping (고속적층조형법에서 최적 적층방향의 자동결정)

  • 채희창
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1997.04a
    • /
    • pp.150-155
    • /
    • 1997
  • Rapid Prototyping(RP) is the technique which is used to make prototypes or functional parts directly using the 3-D solid data. Before building the prototype, several processes such as transfering 3D data from CAD system(STL) determination of build-direction, adding support structure and slicing are required. Among the above processes. determination of build-direction is the target of this study. The build direction is determined by many factors according to the objective of the user, like part accuracy, number of support structure, build time, amount of trapped volume, etc, But it is not easy to determine the build-direction because there are many factors and some factors have dependent properties with one another. So, in this study the part accuracy, the number of support structures and build time are considered as the main factor to determine the optimal build-direction. To determine the optimal build-direction for increasing part accuracy, sum of projected area which caused stairstepping effect was considered. The less the projected area is the better part accuracy is About the optimal build-direction to minimize the amount of support structure, sum of projected area of facets that require support structures was considered. About the build time, we considered the minimum height of part we intended. About the build time, we considered the minimun height of part we intended to make.

  • PDF

Effect of HPLC Analytical Procedure upon Determining Drug Content in PLGA Microspheres

  • Heo, Sun-Ju;Lee, Hong-Hwa;Lee, Min-Jung;Sah, Hong-Kee
    • Journal of Pharmaceutical Investigation
    • /
    • v.40 no.3
    • /
    • pp.193-200
    • /
    • 2010
  • The objective of this study was to investigate the effects of sample preparation, HPLC conditions and peak measurement methods upon determining progesterone content of poly-d,l-lactide-co-glycolide microspheres. A series of the microspheres with different formulations was first prepared. To determine their actual drug contents, the microspheres were dissolved in tetrahydrofuran and diluted with various amounts of methanol to precipitate the polymer. After removal of polymeric precipitates, the filtrates were subject to HPLC analysis under versatile experimental conditions. Interestingly, the composition of a sample solution (e.g., the ratio of methanol to tetrahydrofuran) affected the magnitudes of both peak fronting and peak broadening of progesterone. Its peak became broader and more asymmetrical at lower methanol:tetrahydrofuran ratios. Furthermore, its peak height was influenced by the proportion of tetrahydrofuran in a sample solution. Such problems encountered with tetrahydrofuran were exacerbated when a larger volume of the sample solution was injected onto an analytical column. Under our experimental conditions a peak area measurement provided more accurate and reliable determination of progesterone content in various microspheres than a peak height determination. Optimizing the composition of a sample solution, HPLC chromatographic conditions and peak analysis methods was a prerequisite to an accurate determination of progesterone encapsulated within microspheres.

Fringe-Order Determination Method in White-Light Phase-Shifting Interferometry for the Compensation of the Phase Delay and the Suppression of Excessive Phase Unwrapping

  • Kim, SeongRyong;Kim, JungHwan;Pahk, HeuiJae
    • Journal of the Optical Society of Korea
    • /
    • v.17 no.5
    • /
    • pp.415-422
    • /
    • 2013
  • White-light phase-shifting interferometry (WLPSI) is widely recognized as a standard method to measure shapes with high resolution over a long distance. In practical applications, WLPSI, however, is associated with some degree of ambiguity of its phase, which occurs due to a phase delay, which is the offset between the phase of the fringes and the fringe envelope peak position. In this paper, a new algorithm is proposed for the determination of a fringe order suitable for samples in which the phase delay mainly occurs due to noise, diffraction and a steep angle. The concepts of the decouple factor and the connectivity are introduced and a method for calculating the decouple factor and the connectivity is developed. With the phase-unwrapping procedure which considers these values, it is demonstrated that our algorithm determines the correct fringe order. To verify the performance of the algorithm, a simulation was performed with the virtual step height under noise. Some specimens such as step height standard and a column spacer with a steep angle are also measured with a Mirau interference microscope, after which the algorithm is shown to be effective and robust.

Analysis Study for the Determination of Optimized Block Size in Mass Concrete (매스콘크리트에서 최적의 타설 단면 결정을 위한 해석적 연구)

  • 김진근;김상철;이두재;김국한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.422-429
    • /
    • 1997
  • Thermal stress induced by hydration heat may produce cracks in mass concrete structure, which can result in structural problems as well as bad appearance. To minimize crack occurrence in massive structural, thus, the study put an emphasis on the determination of optimized lift height and block size. In the parametric study different sizes and lift heights were used to measure the magnitudes of hydration heat and thermal stresses for 3 different types of concrete fabricated with 1 pure cement and 2 blended Portland cements. As a result of analysis. it was found that magnitude of hydration heat and the occurrence of thermal cracks depend on the restriction conditions and material characteristics, especially adiabatic material parameters. It was also found that optimized lift height and block size can be determined from an appropriate combination of the degree of inner and outer structural restrictions.

  • PDF

Determination of Wave Run-up Height on S-berm Breakwater (복합사면에서의 도파고 산정)

  • 유동훈;이대석
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.13 no.3
    • /
    • pp.202-208
    • /
    • 2001
  • Explicit approximation has been developed to estimate the run-up height on S-berm breakwater on the basis of Saville's hypothetical slope method. For the explicit expression of run-up height several relations are developed to represent the ratio of run-up height against breakwater slope with various conditions of water depth and wave steepness. For the verification of explicit approximation the results are compared with Saville's measurement data and simple expression of Delft Hydraulic Laboratory.

  • PDF

Research on Transferring the National Height System to the Island

  • Liu, Yanxiong;Zhou, Xinghua;Peng, Lin;Wu, Yongtong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.425-427
    • /
    • 2006
  • It is quite difficult to transfer the National Height System 1985 to the island in China. In the study, one feasible and alternative way, which measures synchronally the tide variation at the island and the coast , is firstly introduced. Then, a new method is proposed. This new method combines GPS technique and Quasi-Geoid Determination technique (GQGD). It needs gravity data, GPS data, leveling data and DEM data, together with complex calculation method and the Earth gravity model. After describing the mathematical model and presenting the calculational steps, one experiment has been shown that this method is valid and can achieve accuracy up to 5 cm for the normal height, compared with the results both from the tidal observation and height approximation. Some suggestion is also given in the end.

  • PDF