• Title/Summary/Keyword: Heating cost

Search Result 581, Processing Time 0.029 seconds

A Daily Operation Scheduling of Total Cogeneration System Connected with Auxiliary Devices of Different Posession Right (소유권이 서로 다른 각종 보조설비가 연계된 종합 열병합발전 시스템의 일간운전계획 수립)

  • 이종범;류승헌
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.81-88
    • /
    • 1998
  • This paper describes the method decide to optimal sizing and operation scheduling of total cogeneration system which is interconnected with cogeneration unit of utility and auxiliary thermal devices of heating company. Optimal sizing and operation scheduling is established in order to minimize the fuel cost under national viewpoint. Simulations are carried out to show the reliability of method suggested by seasons and kinds. The simulated results can be effectively used as the guideline of operation scheduling between the utility and the heating company.

  • PDF

Field Enhanced Rapid Thermal Process for Low Temperature Poly-Si TFTs Fabrications

  • Kim, Hyoung-June;Shin, Dong-Hoon
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2005.07a
    • /
    • pp.665-667
    • /
    • 2005
  • VIATRON TECHNOLOGIES has developed FE-RTP system that enables LTPS LCD and AMOLED manufacturers to produce poly-Si films at low cost, high throughput, and high yield. The system employs sequential heat treatment methods using temperature control and rapid thermal processor modules. The temperature control modules provide exceptionally uniform heating and cooling of the glass substrates to within ${\pm}2^a\;C$. The rapid thermal process that combines heating with field induction accelerates the treatment rates. The new FE-RTP system can process $730{\times}920mm$ glass substrates as thin as 0.4 mm. The uniform nature of poly-Si films produced by FE-RTP resulted in AMOLED panels with no laser-Muras. Furthermore, FE-RTP system also showed superior performances in other heat treatment processes involved in poly-Si TFT fabrications, such as dopant activation, gate oxide densification, hydrogenation, and pre-compaction.

  • PDF

공동주책의 에너지소비와 이산화탄소 배출특성

  • 이윤규;이강희
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.13 no.9
    • /
    • pp.868-877
    • /
    • 2001
  • This study is to present the typical energy consumption criteria and $CO_2$ exhaust rate in multi-family housing complex by analyzing the energy consumption characteristics. The contents and methodology of this study are as follows; -Examining the documents of maintenance accounts, investigate the cost and its items expended by the annual maintenance in multi-family housing complex. -Survey each consumption of energy sources, maintenance area, location of multi-family housing complex, heating type, and so forth. -After classifying with heating type of multi-family housing complex investigated, Scrutinize the energy consumption by each source. -Analyze the characteristics of energy consumption and $CO_2$ exhaust through multiple regression analyses of maintenance property. -Suggest the typical energy consumption criteria (Mcal/$m^2$.year, Mcal/house.year) and $CO_2$ exhaust rate (kg-c/$m^2$.year, Kg-c/house.year) in multi-family housing complex. the results will come into basic data for estimating energy consumption in multi-family housing complex according to maintenance characteristics.

  • PDF

An Experimental Study of surface temperature distribution in Flat-Plate Heat Pipe (평판형 히트파이프의 표면온도 분포에 관한 실험적 연구)

  • Joo, Sang-Hyun;Lee, Young-Soo;La, Ho-Sang;Jo, Sung-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.635-639
    • /
    • 2007
  • In this study, optimal design and test of flat-plate heat pipe were carried out in order to improve both thermal response and surface temperature uniformity of heating plate. Experimental results show that the thermal response of flat-plate heat pipe is faster than that of a conventional heating type ones along with less weight and cost. The surface temperature uniformity is also improved.

  • PDF

A study on the configuration of the Rail Heating System for Energy Saving (에너지 절감을 고려한 레일 해빙 시스템 구성에 관한 연구)

  • Kim Jong-Chul;Kim Kyeong-Hwa;Han Seong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.969-975
    • /
    • 2005
  • A rail heating system can be classified as the method which uses a natural phenomena change in climate condition and the method which uses electric energy. The former uses a the sunshine and wind for frozen rail or snow. On the other hand, and the latter uses the electric energy. In this paper, to set up an effective thaw system in railway facilities using the electric energy, the component for thaw equipments, the installing method, the method for temperature regulation, and the maintenance technique will be analyzed and compared, which results in an introduction of an effective and economic scheme for respective railway systems. Although the portion of thaw system is not quite large in the entire railway facilities, a significant energy saving and cost reduction can be expected if the proper system is employed.

  • PDF

Temperature Uniformity Control of Wafer During Vacuum Soldering Process (진공 솔더링 공정 중 웨이퍼 온도균일화 제어)

  • Kang, Min Sig;Jee, Won Ho;Yoon, Wo Hyun
    • Journal of the Semiconductor & Display Technology
    • /
    • v.11 no.2
    • /
    • pp.63-69
    • /
    • 2012
  • As decreasing size of chips, the need of wafer level packaging is increased in semi-conductor and display industries. Temperature uniformity is a crucial factor in vacuum soldering process to guarantee quality of bonding between chips and wafer. In this paper, a stepwise iterative algorithm has been suggested to obtain output profile of each heat source. Since this algorithm is based on open-loop stepwise iterative experimental technique, it is easier to implement and cost effective than real time feedback controls. Along with some experiments, it was shown that the suggested algorithm can remarkably improve temperature uniformity of wafer during whole heating process compared with the ordinary manual trial-and error method.

A Study on the Control of Solenoid Valve for Heating by using Power Line Communication (PLC) (전력선 통신을 이용한 난방용 솔레노이드밸브 제어에 관한 연구)

  • 신관우;김용태;이윤섭
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.8
    • /
    • pp.647-650
    • /
    • 2003
  • PLC (Power Line Communication) is the communication method using the existing power line installed in houses and offices to convert and transmit high frequency communication signal from tens of KHz to tens of MHz, and receive the filtered signal using high frequency filter The advantage of PLC is that PLC uses the existing power line installed in houses and offices so it does not require separate power line. Easy and convenient access using electric outlets is another advantage of PLC. However, PLC has some disadvantages such as limited transmission power, high load interference and noise, variable signal attenuation, characteristic of impedance, and selective possibility of frequency property. We designed the boiler temperature control system unit by using the PLC modem. We can avoid unnecessary heating of separate temperature control unit, and save the cost accordingly control stability of the proposed system is proven through the experiment.

A Study on the Analyses of Defect Occurrences and its Repair Costs in the Public Equipment of an Deteriorated Apartment House (노후 아파트 공용설비부문의 하자발생과 보수비용 분석에 관한 연구)

  • 전규엽;조극래;홍원화
    • Journal of the Korean housing association
    • /
    • v.14 no.4
    • /
    • pp.11-19
    • /
    • 2003
  • This study intends to predict prospective defects and establish the plan of Preventive Maintenance through research and analysis of defect occurrences and their repair costs in the public equipment of ‘H’ apartment house from 1998 to 2001. According to results of the analysis, more than 90% of defects and their repair costs for 4 years of the building have occurred in heating, hot water and water supply equipments. In case of specific classification in each equipment, more than 60% of defects were found at hot water pipes and heating pipes, and their repair costs covered more than 60% of the total defect costs. After two repairs by ‘Preventive Maintenance’ had been performed in the year 1998, total defects and defects of each equipment each yew have increased in number from 1999 to 2001. But total repair costs and repair costs of each equipment have not increased as time has gone by, because repair costs have relationship with the price of materials and labor, the part of defect and the scale of repair.

A Study on the Application of the Solar Energy Seasonal Storage System Using Sea water Heat Source in the Buildings (해수냉열원을 이용한 태양열계간축열시스템의 건물냉방 적용에 관한 연구)

  • Kim, Myung-Rae;Yoon, Jae-Ock
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.56-61
    • /
    • 2009
  • Paradigm depending only on fossil fuel for building heat source is rapidly changing. Accelerating the change, as it has been known, is obligation for reducing green house gas coming from use of fossil fuel, i.e. reaction to United Nations Framework Convention on Climate Change. In addition, factors such as high oil price, unstable supply, weapon of petroleum and oil peak, by replacing fossil fuel, contributes to advance of environmental friendly renewable energy which can be continuously reusable. Therefore, current new energy policies, beyond enhancing effectiveness of heat using equipments, are to make best efforts for national competitiveness. Our country supports 11 areas for new renewable energy including sun light, solar heat and wind power. Among those areas, ocean thermal energy specifies tidal power generation using tide of sea, wave and temperature differences, wave power generation and thermal power generation. But heat use of heat source from sea water itself has been excluded as non-utilized energy. In the future, sea water heat source which has not been used so far will be required to be specified as new renewable energy. This research is to survey local heating system in Europe using sea water, central solar heating plants, seasonal thermal energy store and to analyze large scale central solar heating plants in German. Seasonal thermal energy store necessarily need to be equipped with large scale thermal energy store. Currently operating central solar heating system is a effective method which significantly enhances sharing rate of solar heat in a way that stores excessive heat generating in summer and then replenish insufficient heat for winter. Construction cost for this system is primarily dependent on large scale seasonal heat store and this high priced heat store merely plays its role once per year. Since our country is faced with 3 directional sea, active research and development for using sea water heat as cooling and heating heat source is required for seashore villages and building units. This research suggests how to utilize new energy in a way that stores cooling heat of sea water into seasonal thermal energy store when temperature of sea water is its lowest temperature in February based on West Sea and then uses it as cooling heat source when cooling is necessary. Since this method utilizes seasonal thermal energy store from existing central solar heating plant for heating and cooling purpose respectively twice per year maximizing energy efficiency by achieving 2 seasonal thermal energy store, active research and development is necessarily required for the future.

  • PDF

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF