• Title/Summary/Keyword: Heat recovery

Search Result 997, Processing Time 0.034 seconds

The Study of Validity on the High Temperature Heat Pump System using Dyeing Wastewater (염색폐수를 이용한 고온수 히트펌프 시스템 타당성 연구)

  • Kim, Jeong-Yeol;Chung, Dong-Yeol;Park, Shung-Sang;Peck, Jong-Hyeon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.996-1001
    • /
    • 2009
  • The purposes of this work were suggested and validated the methods of heat recovery from dyeing wastewater exhausted in Sihwa and Banwol dyeing industrial park. We analyzed the present conditions of heat supplies and demands. So it was made a selection of the system combined heat exchanger for waste heat recovery and the high temperature heat pump. We decided the specifications of the heat recovery facilities. After this, economical assessment is performed to this system. The payback periods are within 4 years, 20 years and 5 years in case of K company, S company and A company. In addition, when they are produced the heat of same capacity, quantities of pollutants from used fuels were calculated.

  • PDF

Modelling and Verification of Once-Through Subcritical Heat Recovery Steam Generator (관류형 아임계압 배열회수보일러의 열성능 모델링과 검증)

  • Lee, Chae-Soo;Choi, Young-Jun;Kim, Hyun-Gee;Yang, Ok-Chul;Chong, Chae-Hon
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.1692-1697
    • /
    • 2004
  • The once-through heat recovery steam generator is ideally matched to very high temperature and pressure, well into the supercritical range. Moreover this type of boiler is structurally simpler than drum type boiler. In drum type boiler, each tube play a well-defined role: water preheating, vaporization, superheating. Empirical equations are available to predict the average heat transfer coefficient for each regime. For once-through heat recovery steam generator, this is no more the case and mathematical models have to be adapted to account for the disappearance of drum type economizer, boiler, superheater. General equations have to be used for each tube of boiler, and actual heat transfer condition in each tube has to be identified.

  • PDF

Analysis on the Performance Test Results of Heat Pump for the Closed Cooling Water Heat Recovery on Combined Thermal Power Plant (복합화력발전소의 냉각수 배열회수를 위한 히트펌프의 성능평가)

  • Lee, Sung-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.19 no.2
    • /
    • pp.43-48
    • /
    • 2016
  • This study proves successes of Energy Service Company (ESCO) business by heat pump performance test. The purpose of ESCO business is recover investment costs through saving energy from installation of energy reduction facility. The most important technology assessment items are heat recovery and generator output. Experimental result shows that increase quality of heat recovery (11.52Gcal/h), while decrease generator output (0.234kw). In its final analysis, the ESCO business is successful according to our data.

An Evaluation on Energy Recovery Performance of the Ventilation System in Multi-Residential Building by Field Measurement (실험을 통한 공동주택 환기시스템의 실제 운전 시 전열교환성능 검토)

  • Choi, Younhee;Song, Doosam
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.2
    • /
    • pp.68-73
    • /
    • 2017
  • Recently, energy recovery ventilators (ERVs) have been installed for energy saving in many multi-residential buildings in Korea. The performance of the heat exchanger of an ERV is analyzed in this study under specific indoor and outdoor conditions in a test-cell measurement. However, the performance of the heat exchanger varies according to the indoor and outdoor condition. In this study, the performance of energy recovery of the ventilation system was therefore analyzed in actual weather conditions using field measurement. Experiments were conducted under winter conditions in a multi-residential building for 20 days. Based on the measurement results, the characteristics of sensible heat and latent heat exchange rates were analyzed.

A Study on the Characteristics of Boiling Heat Transfer of Two-Phase Loop Thermosyphons (루우프형 2상 유동 열사이폰의 비등열전달 특성에 관한 연구)

  • Cho, Dong-Hyun
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.26 no.3
    • /
    • pp.639-646
    • /
    • 2014
  • A heat exchanger using two-phase loop thermosyphons was developed as a waste heat recovery system. An experimental study was carried out on the heat transfer characteristics of two-phase loop thermosyphons heat exchanger and the results from the experiments were used to see the possibility which the two-phase loop thermosyphons could be an alternate solution for waste heat recovery system. In the present work, R134a has been used as the working fluid and the filling rate do working fluid and heat flux have been used as the experimental parameters. The results show that the filling rate of working fluid and heat flux are very important factors for the operation of two-phase loop thermosyphons. The experimental results showed the provisional results as a waste heat recovery system.

Effects of Warm-up Performance on SI Engine with Exhaust Heat Recovery System (배기열 회수장치 적용에 따른 SI 엔진의 웜업 성능에 미치는 영향)

  • Park, Kyoun-Suk;Suh, Ho-Cheol;Park, Sun-Hong;Kim, In-Tae;Jang, Sung-Wook
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.19 no.6
    • /
    • pp.53-60
    • /
    • 2011
  • The effect of exhaust heat recovery system can be evaluated by two well known method. First method is to measure the time duration from engine start under cold coolant temperature till coolant get warmed. By this methodology coolant warming duration can be index of warm-up effect. Second method is to analyze heat balance of the engine during warm-up phase under steady engine operation so that wasted energy by losses such as cooling and exhaust can be index of warm-up effect. This study focused on evaluation of warming-up effect by both methodology above mentioned using 2L SI engine under from idle to 2000rpm steady condition. Results, idle operation showed low heat recovery efficiency but under higher engine speed condition, remarkable heat recovery efficiency improvement was observed. In 2000rpm steady condition, warm-up duration of engine is decreased by exhaust heat recovery system.

Thermal and Flow Analysis of Organic Rankine Cycle System Pipe Line for 250 kW Grade Waste Gas Heat Recovery (250kW급 폐열회수 시스템용 유기랭킨사이클 배관 열유동해석에 관한 연구)

  • Kim, Kyoung Su;Bang, Se Kyoung;Seo, In Ho;Lee, Sang Yun;Yi, Chung Seob
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.4
    • /
    • pp.26-33
    • /
    • 2019
  • This study is a thermal and flow analysis of Organic Rankine Cycle (ORC) pipe line for 250 kW grade waste gas heat recovery. We attempted to obtain the boundary condition data through the process design of the ORC, which can produce an electric power of 250 kW through the recovery of waste heat. Then, we conducted a simulation by using STAR-CCM+ to verify the model for the pipe line stream of the 250 kW class waste heat recovery system. Based on the results of the thermal and flow analyses of each pipe line applied to the ORC system, we gained the following conclusion. The pressure was relatively increased at the pipe outside the refracted part due to the pipe shape. Moreover, the heat transfer amount of the refrigerant gas line is relatively higher than that of the liquid line.

Feasibility Study on Thermal Power Plant Condenser Heat Recovery for District Heating and Fuel Line Preheating (발전소 복수기 배열회수의 지역난방 및 연료라인 예열용 활용타당성 검토)

  • Jung, Hoon;Hwang, Gwang-Won
    • New & Renewable Energy
    • /
    • v.5 no.3
    • /
    • pp.40-48
    • /
    • 2009
  • Recovered heat has been considered as a renewable energy in Europe since 2008 because its great effect on energy saving and carbon decreasing in plant process. Energy saving and decreasing green gas are critical issue today, so various technologies to save energy and decrease carbon dioxide in plant process have been applied to many industrial area. In this paper, the feasibility of condenser heat recovery by heat pump in power plant for district heating and fuel line preheating were reviewed by verifying energy (heat) balance and mass balance of power plant model. Some ways to compose proper system to recover heat of condenser are suggested and their possibilities are also reviewed. Limitations on heat recovery in power plant are also reviewed. The results are verified by calculating input/output energy based on actual performance test data of Taean Thermal Power Plant in Korea. There is noticeable improvement of plant performance in some cases which demand low temperature (<100 C) heat like distrcit heating, fuel line heating, and so forth.

  • PDF

A Study on the Performance Improvement of Plastic Heat Exchanger for Exhaust Heat Recovery (배기열 회수용 플라스틱 열교환기의 성능 향상에 관한 연구)

  • Kim, Jin-Hyuck;Yoo, Seong-Yeon;Han, Kyu-Hyun;Kang, Hyung-Chul;Yun, Hong-Ik
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.328-333
    • /
    • 2008
  • In order to control indoor air quality and save energy, it is needed to install a suitable heat exchanger for heat recovery. A plastic heat exchanger have many advantages and can recover $50{\sim}80%$ of the temperature difference between supply and exhaust air. The purpose of this research is to evaluate the performance of plastic heat exchanger with different shapes. Pressure drop and heat transfer characteristics of plastic heat exchangers are investigated for various velocities.

  • PDF