• 제목/요약/키워드: HEMU

검색결과 107건 처리시간 0.045초

차세대 고속열차 개발을 위한 시스템엔지니어링 관리계획 연구 (A Study on the Systems Engineering Management Plan for the Korean High-speed Electric Multiple Unit 400km/h Experimental)

  • 이태형;최성훈;김상수;박춘수;김기환
    • 시스템엔지니어링학술지
    • /
    • 제3권2호
    • /
    • pp.17-24
    • /
    • 2007
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperiment) project starts in 2007. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. The Systems Engineering Management Plan(SEMP) is the primary, top level technical management document for the integration of all engineering activities within the context of, and as an expansion of, the project plan. A SEMP should be prepared for each project and regularly updated as development progresses. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF

속도향상에 따른 열차속도와 전차선 파동전파속도에 대한 실험적 연구 (A Experimental Study on Train Speed and Wave Propagation Speed of Contact Wire according to the Speed-up)

  • 이기원
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1820-1823
    • /
    • 2013
  • An overhead catenary system is the one of the main subjects for increasing speed in electric railway. When a vehicle increases the speed over 350km/h, vibrations and wave propagation reflections occur severely. Therefore, the system suitable for the speed are needed. A wave propagation speed of contact wire is the main criteria to determine the tension for the system. Therefore, a train speed is restricted below 70% of wave propagation speed of it in European railway code. In this study, we measured a strain and uplift of contact wire while HEMU-430X tain is operated for the speed-up trial test in Kyungbu high-speed railway. The measured strain and uplift are analyzed with wave propagation speed according to the speed-up. The more a train speed reaches to a propagation speed, the more measured strain is high. Through the study, an experimental approach is performed about the code which a train speed is restricted below 70% of wave propagation speed of it.

오픈 소스 CFD 코드를 이용한 차세대 고속열차 공력 해석 (Aerodynamic Simulation of Korea next generation high speed train using open source CFD code)

  • 김병윤;길재흥;권혁빈
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2011년 춘계학술대회논문집
    • /
    • pp.327-330
    • /
    • 2011
  • CFD simulation is widely used in various industries, universities and research centers. In Korea most of the researchers use foreign commercial S/W packages especially in industries. But commercial CFD packages have some problems as limit to source code and very high license foe. So from several years ago open source CFD code has been widely spread as an alternative. But in Korea there are a few users of open source code. Insufficiency of performance validation as for accuracy, robustness, convenience and parallel speed-up is important obstacles of open source code. So we tested some validation cases as to incompressible external aerodynamics and internal flaws and now are doing compressible flaws. As the first stage of compressible flow validation, we simulated Korea next generation high speed train(HEMU). It's running condition is 400km/hr and maximum Mach number reaches up to 0.4. With the high speed train we tested accuracy, robustness and parallel performance of open source CFD code OpenFOAM Because there isn't experimental data we compared results with widely used commercial code. When use $1^{st}$ order upwind scheme aerodynamic forces are very similar to commercial code. But using $2^{nd}$ order upwind scheme there was some discrepancy. The reason of the difference is not clear yet. Mesh manipulation, domain decomposition, post-processing and robustness are satisfactory. Paralle lperformance is similar to commercial code.

  • PDF

차세대 분산형 고속전철용 압출재 알루미늄 합금의 마찰교반접합 (Friction Stir Welding in Extrusion Aluminum Carbody of HEMU-400X (Highspeed EMU-400km/h eXperiment))

  • 장웅성;천창근;김흥주;박인규;백진성;노양환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.980-985
    • /
    • 2008
  • Since its invention at TWI in 1991, Friction Stir Welding (FSW) has become a major joining process in the aerospace, railway and ship building industries especially in the fabrication of aluminium alloys. In an attempt to optimize the friction stir welding process of Al alloys for extrusion Aluminium carbody of HEMU-400X (Extrusion Aluminum 6xxx series), effects of joining parameters such as tool rotating speed, plunging depth and dwelling time on the weld joints properties were evaluated. Experimental tests were carried out for butt joined Al plates. A wide range of joining conditions could be applied to join Al alloys for Extrusion Aluminum 6xxx series without defects in the weld zone except for certain welding conditions with an insufficient heat input. The microstructures of welds have dynamic-recrystallized grain similar to stir zone in FSW weld. For sound joints without defects, at the rotation speed of 700 rpm with different welding speeds, the tensile strengths of the Stir Zone(SZ) were almost the same, 80% of those of the base metal. (JIS Z 2201)

  • PDF

차세대 고속전철시스템 주요기술 특성 분석 (Analysis for Main Properties of basic characteristic of HEMU-400x)

  • 박춘수;최성훈;한인수;김상수;이태형;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.173-179
    • /
    • 2009
  • High-speed railway is important transportation in the world because it has a lot of merits like as very comfortable, environmental benefits, energy savings, etc. The increase of demand for high-speed railway influence to develop of new hish-speed trains. Many countries introduced new high-speed train in the market and it meets to the market's needs. They adopt new technology and systems like that active suspension, synchronous permanent magnetic motor, distributed drive system, aero acoustics, etc. In Korea, the project for R&D of new high-speed train is launched in 2007. We need analysis for main properties of new high-speed train(HEMU-400x). This paper presents the comparisons, analyzed characteristics of main properties like as traction system and braking system. In this analysis, we can know our technical position in the world and what is important to focus on the development. It is very useful to develop a next generation high-speed train in Korea.

  • PDF

분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰 (The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System)

  • 강병모;정상훈;안효권;조병찬;문재석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

호남고속철도 전차선로의 이상 상태 분석 (Analysis for Catenary System with Focus on Abnomal Conditions on Honam High Speed Line)

  • 전재근;신승권;정호성;나경민;박영
    • 한국전기전자재료학회논문지
    • /
    • 제32권1호
    • /
    • pp.1-5
    • /
    • 2019
  • The overhead contact line (OCL) is a key piece of equipment for transmitting electrical energy to the pantograph of rail cars. Recently, a 400 km/h OCL was applied to the Honam high-speed line, and its performance was examined by running HEMU-430X. For the study, we analyzed the current of catenary wire concurrently while running HEMU-430X in the Honam high-speed line. Specifically, this study recorded the currents for each speed during operation of the railway vehicle. The analysis of the frequency of line current showed generation of third-harmonics, 15th-harmonics, 17th-harmonics, and 19th-harmonics. The current of catenary wire is a basic technology assessment used to determine the electrical safety of electric railway systems, and it can be used as a technology for analyzing circulating currents generated in the current configuration, as well as for analyzing electric fatigue of the OCL components.

400km/h 전차선로에서 사전이도가 집전성능에 미치는 영향에 대한 시뮬레이션 및 시험 (Simulation and Testing of the Effect of Current Collection Performance According to Pre-sag in 400km/h Overhead Contact Lines)

  • 권삼영;조용현;이기원;오혁근
    • 한국철도학회논문집
    • /
    • 제19권3호
    • /
    • pp.288-296
    • /
    • 2016
  • 400km/h급 전차선로가 우리나라에 시범 부설되었다. 400km/h 심플 커티너리를 설계함에 있어서 사전이도를 어떻게 해야 하는가는 관심이 집중된 엔지니어링 항목이다. 사전이도는 일정 고속 대역에서 집전성능을 향상시키는 것으로 알려져 있다. 그러나 400km/h 속도에서 효과에 대해서는 아직 정립되어있지 않다. 400km/h 커티너리에서 적절한 사전이도량을 파악하기 위하여 사전이도 0과 1/3000 조건에서 전차선과 팬터그래프 사이 동적 성능 예측 시뮬레이션을 실시하였다. 이 예측에 근거하여 400km/h 전차선로 설계에서는 0 사전이도를 채택하였다. 그리고 400km/h 전차선로 시범구간(28km)을 건설하면서 일부구간에 1/3000 사전이도 구간(약 1km)을 조성하였다. HEMU-430X 열차를 투입하여 사전이도 조성 구간을 포함하여 시범구간에서 접촉력 측정을 실시하였다. 본 논문에서는 사전이도 조성 구간과 사전이도가 없는 구간의 동적 성능(접촉력)에 대하여 기술하며 그 둘을 비교한다. 결론적으로 400km/h 전차선로에서 사전이도를 주지 않은 구간이 1/3000 사전이도 구간보다 양호한 동적(집전) 성능을 나타냄을 해석적 및 실험적 검토를 통하여 확인하였다.

UIC 518 OR의 가속도계를 이용한 차세대고속열차(HEMU-430X) 동적 거동 안전성 평가 (Safety Evaluation of the Dynamic Behavior of HEMU-430X using the Accelerometers of UIC 518 OR)

  • 류상현;김상수;홍준희;송두상;곽양양
    • 한국철도학회논문집
    • /
    • 제16권1호
    • /
    • pp.32-39
    • /
    • 2013
  • 차세대고속열차는 국가 연구개발사업으로 국내에서 최초로 개발한 동력분산식 차량이다. 차세대고속열차의 성능시험을 위해 경부고속 구간에서 속도 354.64km/h 까지 1차 시운전을 종료하였다. 따라서 주행안전성을 위해 대차 및 차체의 동적 거동 분석을 통한 안전성 평가가 필요하다. 본 연구의 동적 거동 안전성 분석방법은 UIC 518 OR의 가속도계를 이용한 단순방법(Simplified method)를 이용하였고, 분석구간은 최고속도 지점 기준으로 ${\pm}10{\sim}20km/h$ 범위로 하였다. 이에 분석된 결과 값을 UIC 518 OR의 제한기준 값과 비교하여 차량마다 해당속도에서의 동적 거동과 속도증가에 따른 경향을 분석하였다. 본 연구의 결과, 동적 거동 분석결과는 UIC 518 OR 제한기준에 모두 만족하였고, 이러한 경향은 속도 354km/h이상에서도 지속될 것이라 예측된다.

차세대 고속열차 도입에 따른 수단분담모형 개발 및 적용방안 (Development of Mode Choice Model for the Implementation of Next-generation High Speed Train(HEMU-430X))

  • 이광섭;정성봉;엄진기;남궁백규;김석원
    • 대한교통학회지
    • /
    • 제33권5호
    • /
    • pp.461-469
    • /
    • 2015
  • 최근 차세대 고속열차에 대한 기술적 검토가 마무리됨에 따라, 실용화 방안에 대한 연구가 본격적으로 진행되고 있다. 차세대 고속열차를 도입하기 위해서는 수요예측을 통한 타당성 분석이 선행되어야 한다. 이에 본 연구에서는 차세대 고속열차 운행특성을 고려한 적정 수단분담모형을 개발하는 것을 목적으로 하고 있다. 즉, 차세대 고속열차의 경우 기존 고속열차와의 관계에 따라 다항로짓모형과 네스티드로짓모형 중 적절한 모형을 선택하는 과정이 필요하다. 수단분담모형 구축을 위해 지역 간 통행자의 통행행태 조사를 통해 현재 및 장래 수단선호도 조사를 실시하였다. 통행시간과 통행비용으로 구성된 효용함수를 추정하기 위하여 Limdep 8.0 NLOGIT 3.0 package를 이용하여 다항로짓모형과 네스티드로짓모형을 개발하였다. 구축된 각 모형의 경우 통계적 유의성은 어느 정도 확보되는 것으로 나타났다. 다만, IIA TEST에서 IV Parameter가 약 0.521로 0과 1사이에 위치하여, 향후 모형적용 시 네스티드로짓모형이 적합한 것으로 분석되었다. 또한, 차세대 고속열차가 도입될 경우 모형의 적용과정에서 국가교통DB의 수정보완 필요성과 적용방안을 제시함으로써, 합리적인 수요분석을 위한 토대를 마련하는데 기여를 할 것으로 기대된다.