• Title/Summary/Keyword: HBMS

Search Result 5, Processing Time 0.029 seconds

Regression Analysis of Life Cycle Profile for Life Cycle Cost and Bridge Management System (교량관리체계 개선 및 LCC분석을 위한 생애주기 성능이력 회귀함수의 산정)

  • Kong, Jung-Sik;Park, Heung-Min;Lee, Kwan-Kyun;Park, Chang-Ho;Shin, Jae-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.149-154
    • /
    • 2008
  • Service life of bridges should be evaluated by physical life considering damage/deterioration. But it is difficult to identify optimal maintenance scenario due to insufficient research related to that. To identify optimal maintenance scenario, it is needed to develope life cycle profile model of condition state variation by deterioration factor. The LCP model has been developed in consideration of regression analysis and survey in this study. It is expected that the LCP model could help to achieve HBMS system improvement.

  • PDF

Perspectives of Women during Reproductive Years for Cervical Cancer Scans and Influencing Factors

  • Acar, Gokce Banu;Pinar, Gul
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.16
    • /
    • pp.7171-7178
    • /
    • 2015
  • Background: This descriptive study was performed in order to assess health perspectives of women, who applied to Yildirim Beyazit University Ataturk Education and Research Hospital, Outpatient Clinic of Obstetrics and Gynecology for cervical cancer scans and were in the reproductive years. Factors influencing their perspectives were also assessed. Materials and Methods: In this study, a simple random sampling formula was adopted to calculate the volume (300) of the targeted sample. Results of the research were obtained through individual diagnosis form and cervical cancer and the Pap smear test health belief model scale (HBMS). Results: It was found that 75.0% of the women heard of the Pap smear test before, and 48.7% had undertaken one. Some 51.4% of the women who had Pap smear test expressed that they had the test at irregular periods. Most of the women stated that they heard about the smear test from the health staff (51.7%). Lack of any health complaints (28.3%) and not having adequate information about the test (21.0%) were among the reasons for not undergoing a Pap smear test. It was found that lower dimension average scores of the women obtained from the cervical cancer and Pap smear test HBMS varied from $7.7{\pm}2.3$ to $33.5{\pm}9.3$. When the lower dimension average scores of women from the HBMS were examined, the perception of usefulness was high but the susceptibility and health motivations were low. Conclusions: In this study, it was determined that the awareness of women about cervical cancer and the Pap smear test was insufficient, and susceptibility and motivation perception towards having a Pap smear test were low.

Highway Bridge Inspection Period Based on Risk Assessment (위험도평가에 의한 고속도로 교량의 점검주기)

  • Lee, Il-Keun;Kim, Dong-Hyawn
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.64-72
    • /
    • 2015
  • Risk Based Inspection (RBI) Period was proposed for highway bridges in Korea. Hazard factors affecting bridge condition deterioration were found by analyzing condition data from Highway Bridge Management System (HBMS). Certain level of correlations between those factors and condition deterioration were found. They are used to evaluate hazard score. Summarizing several hazard factors, final hazard is classified as three level;high, moderate, low. Vulnerability is assessed only by the current state of bridge. Then, risk matrix is suggested for inspection periods. Inspection periods of the bridges with grade C, D, and E are maintained the same as before. But, those of grade A and B with moderate and high hazard score are elongated to maximum 6 years while the maximum inspection period is three years at present. By adjusting inspection period according to risk assessment, it was shown that 27% of average inspection manpower can be saved.

Bridge Life Cycle Cost Analysis of Preventive Maintenance (예방적 유지관리를 통한 교량의 생애주기비용 절감 효과 분석)

  • Jeong, Yo-Seok;Kim, Woo-Seok;Lee, Il-Keun;Lee, Jae-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.6
    • /
    • pp.1-9
    • /
    • 2016
  • The paper aims at evaluating effects of preventive maintenance on life cycle cost(LCC) reduction of bridges. The preventive maintenance activities capable to delay bridge deteriorations can reduce overall maintenance costs and extend service life of a bridge by regularly providing maintenance activities and avoiding larger maintenance(repairs or rehabilitations) costs. Couple of prediction models were proposed in order to calculate LCC of a typical bridge: a health score model and repair rehabilitation cost model. In addition, the maintenance activities such as wash and painting were also suggested in order to consider effects of preventive maintenance in the analysis based on literature reviews. According to analysis results, new maintenance strategy(reactive maintenance + preventive maintenance) can save \0.5 billion per bridge for future life-cycle costs over 100 year analysis or \184 billion for entire HBMS(Highway Bridge Management System) inventory over 20 years. Small investments for preventive maintenance in improved bridge management can have a very significant return when considering the large bridge inventory.