Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.1351-1360
/
2005
New construction for public transport in congested urban areas will involve tunnel construction adjacent to existing building or bridge foundations and services due to the lack of surface space. Therefore, careful assessment of the important underground structure-soil-tunnelling interaction is relatively new, currently only limited information is available. In this study, the authors carried out FE analysis and the laboratory model test using the photogrammetric technique and suggested the influence zones associated with the normalised pile tip settlement during new tunnel construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.6
/
pp.1277-1285
/
2015
It has been known that the conventional retaining wall system with timber lagging and H pile has several problems such as the irregular gap between H-piles, cutting or adding to standard timber, back fill over first step excavation, and especially break-down accident at the disjoint of wall system. In the practical excavation, these problems may lead to worker's accident and the inefficiency of construction economy. To solve the above problems, a new method using prefabricated retaining wall was proposed and verified. The characteristics of the new method is to replace timber wall as free-sliding steel-lagging and connector. To check its verification and application, laboratory tests such as bending strength, tensile strength, and fatigue strength were carried out. Also, a pilot test in the field and numerical simulations under various ground conditions were performed. From the researches, it is found that the prefabricated retaining wall plate can be superior to the conventional timber lagging plate in the strength. It is also found that the proposed methods can be effective in the reuse of retaining wall plate and safe in the disjoint of wall system. Finally, it is desired that the proposed method will be effective in the reduction of the imported timbers and helpful in the safety of retaining wall construction.
Seo, Soo-Yeon;Kim, Seoung-Soo;Yoon, Yong-Dae;Ha, Gee-Joo
Journal of the Korea Concrete Institute
/
v.20
no.5
/
pp.573-581
/
2008
In general, conventional sheeting H-pile is often used as a temporary member installed upon construction of outer retaining wall at basement floor. In CBW (composite basement wall), R/C basement wall is combined with H-Pile and resists lateral soil pressure together. This paper presents an experimental results of push out shear test of CBW with stud coupler as shear connectors to combine H-Pile with R/C wall six specimens with different diameter of FT (form tie) and arrangement of shear connectors were tested to evaluate the shear capacity of the composite wall. Test results showed that shear strength increased with diameter of FT. The shear strength of shear connector in CBW could be suitably predicted by using the previous equations codified in the codes. Best correlation, especially, was found when the calculation result by the formula in AISC 360-05 was compared to test one.
Journal of the Korea Organic Resources Recycling Association
/
v.11
no.1
/
pp.149-153
/
2003
This study was conducted to survey the utilization possibility of composting system of small scale static pile with animal manure produced from cattle shed and the effect of addition of microorganism on the maturity of compost. Microorganisms added in composting substrate were bacteria+lactobacillus(BL)+photo.(BLP). The composting practiced was a windrow system without aeration equipment and turning was practiced periodically. The water content of substrate mixed with cow manure, rice husk, and sawdust was about 60%. The temperature during the composting process was increased at over $60^{\circ}C$ within 3 days after composting starting. Increase of temperature at the early stage of composting was fasten in BLP and BL than Control. Because the pH of the raw material was high, the changes of pH during composting was little and stabilized in weak alkaline condition. EC value was high for accumulation of manure and urine excreted continuously by animal and the changes of those during composting occurred in 5~10% increase. Reduction rates of C/N ratio were the largest as the 22.7% in BLP and 19.2and 17.5% in BL and Control respectively. In the evaluation of phytotoxicity, there was stabilized within the short time in BLP and not the difference between BL and Control. Treatment of animal manure produced from small scale cattle shed was possible by using the small scale static pile composting system with reasonable water content and turning and the addition of microorganism in composting substrate was effected on the temperature increase at the early stage of composting and reduction of plant toxicity compounds but little on the maturity of compost.
In urban areas, structures are installed deep underground in the lower part of the structure to utilize space. Therefore, a retaining wall is used to prevent earth pressure from the ground when constructing a structure. Due to the development of construction technology, retaining wall applied to excavation work are used to prevent danger such as falling rocks and landslides in temporary facilities when construction or retaining walls are installed. In general, the application of a retaining wall to a temporary facility during the embankment construction is the case of expanding an existing roads or railways. Therefore, it is necessary to study the retaining wall applied to the embankment construction such as the double-track site of the high-speed railway. In this study, two types of common one row H-pile retaining wall and two types of IER retaining wall were analyzed, and the stability of the retaining wall applied to the construction of double-track of the high-speed railway was analyzed. The earth retaining wall is a construction method that combines forced pile applied to the stabilization of the slope with the wall of the earth retaining wall. As a result of the analysis, the IER retaining wall had maximum lateral displacement of 19.0% compared to the type with H-plie installed only in the front while dynamic load was applied. In addition, the slower the speed of high-speed railway, the more displacement occurred, and the results show that more caution is needed when designing the ground in low-speed sections.
In this study, practical verifications for an advanced C.I.P(Cast in Place Pile) construction method were carried out. The structural characteristics of the method is to attach an angular joint in the steel-casing. This joint plays an important role in boring vertically, connected pile to pile, and protects the permeation of the ground water. For verifications, experimental research and numerical analysis were performed. In the experimental research, two model-tests were set up with the real scale steel-casing. One is to examine the leakage in the joint of piles and the other is to compare earth pressures in the front and the joint, respectively. In addition, 3 point bending test and compressive loading test were carried out and numerical analysis was performed to simulate the loading test. As a result of model-tests, the leakage in the pile joints was not shown up to 300 KPa of water pressure and stress concentration in the joint is out of the question. From the results of bending and compressive test, it was found that the new advanced C.I.P method is more convenient and superior than the conventional method.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.3
/
pp.543-560
/
2018
With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).
Detonation phenomena of $C_2H_2$were invesgated using the various shock tube. To study the detonation characteristics according to the composition of $C_2H_2-0_2$$_2$ and $C_2H_2$-air mixtures, the composition were varied from 5 to 90% and 5 to 50% of acetylene each other. A spiral ring was installed in the shock tube to study the effect of obstacles in DDT phenomena. Detonation velocities were measured using the photodiode, and the DDT phenomena was visualized using the high speed schlieren photograph. From the experimental result, it was found that the detonation velocity was most high near the 1. 8times the stoichiometric ratio of acetylene. And from the visualization of DDT phenomena, it was found that the detonation wave was strengthened throuth the pile up of small compression wave of burned gas. And the obstacles in shock tube accelerate the detonation reaction by turblent effect of flammable gas mixture.
Proceedings of the Korean Geotechical Society Conference
/
2000.11a
/
pp.237-244
/
2000
Piles are often subjected to both axial and lateral loads. The nonlinear subgrade reaction method is widely used for the design of laterally loaded piles and in this approach the soil reaction is replaced with a series of independent nonlinear Winkler springs. In this study, Laterally loaded high strength H-piles were analyzed using a finite difference solution, and three p-y curve models with different k values(the coefficient of horizontal subgrade reaction, [FL$\^$-3/]) were evaluated using data obtained from various field tests, and another analysis method using Q$\sub$g/ - y$\sub$g/ curve was developed. The results of this analysis were compared with the measured values to assess their applicability.
Sawdust is commonly used as a bulking agent for livestock manure composting. Nowadays, demand of sawdust for composting is increasing, so its price is very high and not easy to obtain. In this study in order to examine the effect of autoclaved lightweight concrete (ALC, one of the industrial wastes) on composting of swine manure, ALC (each size of 2, 4, an 8mm) was used as a bulking agent. Swine manure was mixed with each of sawdust and 8mm of ALC in a 1:1 ratio by volume and 2, 4mm of ALC was mixed in a 2:1 ratio by volume. The total period lasted 50 days and was divided into two periods. After mixing bulking agent with swine manure, they were left undisturbed to compost with aeration for an initial period of 20 days. At the end of this period, they were decomposed and mixed to effect a homogenization and then a second period of composting (without aeration) was conducted for 30 days. Temperature during the initial period of swine manure composting were above 70$^{\circ}C$ in all piles and maintained above 55$^{\circ}C$ for 5 days. Temperatures during the second period were relatively lower than the initial period. pH of the compost was increased during the initial period and after 50 days it reached 9.08 in sawdust pile and 9.03 in ALC pile ( 2mm). In nitrogen content of final compost, sawdust pile was higher than ALC piles by 21∼29%.
이메일무단수집거부
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.