• 제목/요약/키워드: H/W 규모산정

검색결과 10건 처리시간 0.03초

정보시스템 용량산정프레임워크 연구 -H/W 규모산정을 중심으로 - (A Study on Capacity Sizing Framework for Information System : Focus on H/W sizing)

  • 나종회;최광돈;이승한;이헌중
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2004년도 춘계학술대회
    • /
    • pp.355-367
    • /
    • 2004
  • Interest about information infrastructure construction is decayed socially according to arrival of information age, and various information systems is constructed for efficient business processing, customer service improvement in public sector. According to subjective method of performance improvement for information system of public sector and engine that propel information system construction bemuse it is no definite hardware sizing guidelines for introduction or system caterer, is calculating resources scale of information system. Is situation that problem of excess of scale or reduction sizing is happening, and is causing various kinds problem that is waste of information budget and service decline thereby. So, We proposed hardware sizing framework for information system that is applied to information programs.

  • PDF

정보시스템 용량산정방식에 관한 탐색적 연구: 공공부문 H/W 규모산정을 중심으로 (An Exploratory Study on Capacity Sizing Method for Information System: Focus on H/W Sizing in Pubic Sector)

  • 나종회;최광돈
    • 한국IT서비스학회지
    • /
    • 제3권2호
    • /
    • pp.9-23
    • /
    • 2004
  • Interest about Information infrastructure construction is enlarged socially according to arrival of information age, and various information systems are constructed for efficient business processing, customer service in public sector. According to subjective method for performance improvement for information system of public sector and engine that propel information system construction because it is no definite hardware sizing guidelines for information system caterer, is calculating resource volume of information system. It is situation that problem of excess of scale or reduce sizing is happening and is causing various kind of problems that is waste of information budget and service decline thereby. In this research, we proposed hardware sizing framework for information system that is applied to pubic sector.

클라우드 컴퓨팅 플랫폼을 이용한 효율적인 정보시스템 용량 산정 방법에 관한 연구 (Efficient Information System Sizing Selection Using Cloud Computing Platform)

  • 성백민;이민규;손효정;김종배
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2014년도 추계학술대회
    • /
    • pp.79-81
    • /
    • 2014
  • 최근 IT기술이 발전하면서 다양한 정보시스템이 구축되고 있다. 하지만 정보시스템을 구축할 때 H/W가 적정한 규모인지 판단하기 어려워 SI업체 및 전문가에 상당히 의존하는 문제가 발생한다. 이러한 문제점을 해결하기 위해 정보화진흥원 등에서는 시스템 유형 별 로 H/W 용량 산정식을 개발하여 기준으로 삼고자 하였으나, 공급업체 전문가그룹의 토의에 의한 용량 산정식을 제시한 것과 비교적 오래되었다는 문제가 있어 지금의 실정에서는 더 이상 적용하기 힘들다는 한계가 있다. 따라서 본 연구에서는 투자되는 예산 대비 최적의 성능을 보장할 수 있는 적정용량 산정 기법을 제안한다. 이를 위해 클라우드 가상 환경에서의 시뮬레이션을 통해 다양한 경우의 비용 대비 성능 측정치를 수집하여 회귀분석함으로써 적정 용량을 추정할 수 있는 산식을 도출하였다. 본 연구를 통해 H/W 용량 산정 시 객관적으로 수치화된 자료를 바탕으로 정보시스템을 구축할 수 있기 때문에 과대 과소 책정되는 비용을 절감할 수 있으며, SI업체나 전문가에 의존하지 않는 환경에서 정보시스템 구축이 가능하다.

  • PDF

한국형 EMS 하드웨어 Sizing 산정에 관한 연구 (Estimation of Hardware Sizing in Korean EMS System)

  • 이원상;이효상;이명희;김인현;이봉길;최진우;여현구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.412-413
    • /
    • 2007
  • 정보시스템의 개발 및 유지보수에 대한 기준은 과기처 등에서 제정한 'S/W 개발비 산정기준'을 준용하고 있다. 그러나 본 기준이 Business Computing 환경을 기준으로 작성되었고, 전력계통 제어를 비롯한 각종 공정제어시스템 구축 환경에 부적합할 뿐 아니라 시스템의 뼈대(Frame)를 구성하는 H/W의 규모 산정이 누락되어 있는 상태이다. 전력거래소는 우리나라의 전력계통 환경에 적합한 한국형 에너지관리시스템(이하 K-EMS)의 국산화 개발을 각종 첨단 S/W의 탑재 기준에 따라 단계별(Baseline, Prototype, Fullscale)로 추진하면서, 각 단계에 가장 적합한 하드웨어의 용량 산정 기준을 선정하는 작업을 진행하고 있다. 이는 정보시스템 개발에서 자원의 낭비를 최소화하고 전체 개발비용을 절감 할 수 있다는 점에서 매우 중요하다. 본 연구에서는 K-EMS 시스템 국산화 개발을 위해 K-EMS가 수용할 각종 응용프로그램별 특성을 감안한 하드웨어의 적정 용량 산정 기준과 적용방안을 제시하고, CPU, Memory 등 세부 항목에 대한 고려항목을 언급함으로써 최적의 K-EMS 하드웨어 Sizing 산정방안을 소개하고자 한다.

  • PDF

클라우드컴퓨팅 기반의 HW용량 산정방법에 관한 연구

  • 최국현;강용석;신용태;김종배
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2014년도 추계학술대회
    • /
    • pp.878-881
    • /
    • 2014
  • 정보시스템은 메인프레임(Mainframe)에서 클라이언트/서버시스템(C/S System), 인터넷 및 인트라넷 시스템을 지나 최근에는 클라우드 컴퓨팅환경으로 발전하고 있다. 이러한 복잡성과 컴퓨팅 환경의 다변함에 따라 시스템 성능 및 용량 산정에 관한 중요성은 점점 부각되고 있다. 이는 기존의 H/W(하드웨어규모산정지침 등)의 방식이 체계적이지 못하고, 다양한 컴퓨팅 환경의 특징을 반영하지 못하기 때문이며 이는 하드웨어 구축비용의 증가 혹은 감소로 실제 요구되는 정보시스템 자원이 과다 또는 과소 산정되는 경우가 발생할 수 있다. 특히 클라우드 컴퓨팅은 막대한 서버자원이 필요하기 때문에 보다 체계적이고 정확하게 HW를 산정하는 것은 사업성공 중요한 요소라 할 수 있다. 클라우드 컴퓨팅의 하드웨어의 용량 산정을 위해서는 우선 IT자원의 성격에 따른 3가지 서비스모델(서비스형소프트웨어, 플랫폼형서비스, 인프라형서비스)에 적합한 용량산정모델을 제시해야 한다. IaaS는 사용자에게 인프라기반의 서비스를 제공하며, PaaS의 경우에는 플랫폼과 OS 등의 개발환경을 제공의 목적이 있기 때문에 HW용량산정을 위해서는 다양한 측면에서의 접근이 요구된다. SaaS는 WEB/WAS의 서비스와 유사한 형태의 서비스 특징을 가지고 있기 때문에 기존 서비스 특징과 클라우드 특징을 도출하기에 적합하다 할 수 있다. 본 연구에서는 SaaS기반의 하드웨어 용량산정에 대한 방법과 기준을 제시하였다. 본 연구결과는 클라우드 컴퓨팅 환경구축 시 HW용량산정에 대한 가이드라인으로 활용 가능하다.

  • PDF

유량 규모별 소양호 유입 밀도류 특성 변화 (Characteristics of Inflow Density Currents with Different Flow Rates in Soyang Reservoir)

  • 최환규;정세웅;윤성완;오동근
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2009년도 학술발표회 초록집
    • /
    • pp.880-884
    • /
    • 2009
  • 여름철 강우시 저수지로 유입하는 고탁도의 하천수는 저수지 주변 수체에 비해 낮은 수온과 높은 부유물질 농도(SS)로 인해 상대적으로 높은 밀도를 가지며, 저수지 내에서 동일 밀도층을 따라 분포하며 밀도류를 형성하게 된다. 탁수는 대부분 장기간 저수지에 체류하며 수질과 수생태계에 큰 영향을 주게 된다. 따라서 저수지로 유입한 탁수의 밀도류 거동특성을 파악하는 것은 저수지 운영, 수질관리 및 수생태계 보호를 위한 관리대책 수립에 있어서 중요한 요소이다. 본 연구의 목적은 횡방향 평균 2차원 수치모델을 이용하여 초기수위별 다양한 유량규모에서 소양호로 유입하는 밀도류의 거동특성(유입경계지점 수심($h_0$), 침강점 수심($d_p$)과 거리($X_p$), 분리점 수심($d_s$), 중층류 관입두께($h_i$), 댐 축 도달시간($t_a$), 희석율(${\beta}$))을 분석하여 저수지 수질관리를 위한 의사결정지원 기초정보를 제공하는데 있다. 밀도류의 거동분석을 위해 사용된 유량조건은 그동안 소양호에서 발생한 홍수크기를 바탕으로 7개의 등급으로 나누었으며, 각각의 유량조건별 수문곡선은 2007년 수문사상 중 7월 30일부터 8월 30일까지의 수문사상을 바탕으로 수정가우시안 공식을 사용하여 산정하였다. 탁수 거동 특성의 모의는 서로 다른 초기 수위 및 유량조건하에서의 탁수거동을 나타냈고, SS농도 25 mg/L 이상을 기준으로 하여 탁수층의 $d_p$, $X_p$, $d_s$, $h_i$, $t_a$, ${\beta}$를 산정하였다. 일반적으로 유량규모가 커질수록 $d_p$$d_s$는 증가하였고, $X_p$는 댐 축으로부터 가까워짐이 확인되었으나, 동일 유량규모에 대해 초기 수위가 증가함에 따라 $X_p$는 대체로 댐으로부터 멀어졌다. $h_i$는 유량규모가 증가함에 따라 완만하게 증가하는 경향을 보였고, $t_a$는 초기수위가 EL. 165 m일 때 유량이 2,000 CMS 미만인 경우 댐 앞까지 도달하지 못하는 것으로 나타났으며, 나머지 수위조건에서는 유량이 3,000 CMS 미만인 경우 댐 앞까지 도달하지 못하는 것으로 나타났다. 유량 규모에 따라 $X_p$가 0 km인 지점과 19 km인 지점에서의 ${\beta}$ 값을 산정한 결과 일반적으로 유량규모가 커질수록 유입수의 희석효과는 작아지며 초기수위가 커질수록 증가하는 경향을 나타냈다. 연구 결과는 탁수 발생 초기 저수지 운영 실무자들이 유량규모 및 초기 수위조건에 따른 밀도류의 거동특성을 신속히 예측하는 목적으로 사용될 수 있다.

  • PDF

계산에 기초한 하드웨어 도입 규모산정 방식 연구 (The Study on Hardware Sizing Method Based on the Calculating)

  • 나종회;최광돈;정해용
    • 한국IT서비스학회지
    • /
    • 제5권1호
    • /
    • pp.47-59
    • /
    • 2006
  • According to the policy for "e-Korea construction" of Korean government, Investment of information system during the past decade are dramatically increasing. More than a half of this investment is cost of hardware infrastructure. So, accurate hardware sizing are essential for higher efficiency of investment. Accurate hardware sizing benefits are generally viewed in terms of the avoidance of excess equipment and lost opportunity costs by not being able to support business needs. Unfortunately, however, little research effort to make the hardware sizing methodology are doing. We propose a sizing method for information system in public sector. This method is determinate empirical study that are gathering and analyzing cases, making method and reviewing expert. Finally we are proposed calculating method for hardware components that is CPU, memory, internal and external disk according to the application system type which is OLTP, Web, WAS. Our study certainly will act as a catalyst for higher investment-efficiency of the future information programs in public sector.

파키스탄 Gulpur 수력발전 현장의 Best Practices 소개 (Introduction of the Best Practices in the Pakistan Gulpur HEPP)

  • 장옥재;홍원표;채희문
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2022년도 학술발표회
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

온실 난방부하 산정방법의 검증 및 틈새환기와 지중전열의 영향 분석 (Validation of Load Calculation Method for Greenhouse Heating Design and Analysis of the Influence of Infiltration Loss and Ground Heat Exchange)

  • 신현호;남상운
    • 원예과학기술지
    • /
    • 제33권5호
    • /
    • pp.647-657
    • /
    • 2015
  • 원예시설의 환경설계 중 난방부하 산정방법에 대한 검증을 위하여, 대규모 플라스틱 온실에서 총난방부하와 틈새환기율, 지중전열량을 계측하여 계산결과와 비교 분석하였고, 지중전열 및 틈새환기가 온실의 난방부하에 미치는 영향을 검토하였다. 실험기간 동안 실내기온은 $13.3{\pm}1.2^{\circ}C$, 실외 기온은 $-9.4{\sim}+7.2^{\circ}C$의 범위를 보였으며, 우리나라의 난방 설계 외기온 범위에서 유효한 것으로 확인하였다. 가스트레이서법으로 측정한 틈새환기율은 평균 $0.245h^{-1}$로 나타났다. 온실의 피복면적에 일정한 환기전열계수값을 사용하는 방법은 온실의 규모에 따라서 문제가 있는 것으로 분석되었다. 따라서 환기전열부하는 온실의 체적과 틈새환기율을 이용하는 방법이 합리적인 것으로 판단된다. 온실 중앙에서 측정한 지중열류는 실내외 기온차에 따라 음으로 약간 증가하는 경향을 보이고, 온실 측면에서 측정한 지중열류는 실내외 기온차에 따라 양으로 크게 증가하는 경향을 보였다. 계측 결과를 바탕으로 온실의 외주부를 통한 열손실 개념을 도입한 새로운 지중전열부하 산정 방법을 개발하였으며, 검증결과 잘 일치하는 것으로 나타났다. 관류열부하는 대체로 실내외 기온차에 비례하는 것으로 나타났으나, 열관류율은 작아지는 경향을 보였다. 따라서 관류열부하 산정시 설계조건에 따라 열관류율의 선택에 주의를 기울여야 할 것으로 판단된다. 실험온실의 열관류율은 평균 $2.73W{\cdot}m^{-2}{\cdot}C^{-1}$로 단일피복의 플라스틱 온실 대비 60%의 열절감율을 보이는 것으로 나타났다. 전체 난방부하 중에서 관류열부하가 84.7~95.4%, 환기전열부하가 4.4~9.5%, 지중전열부하가 -0.2~+6.3%를 차지하는 것으로 나타났다. 관류열부하는 실내외 기온차가 낮은 그룹에서 더 큰 비율을 차지하고, 환기전열 부하는 실내외 기온차가 높은 그룹에서 더 큰 비율을 차지하는 것으로 나타났다. 지중전열부하의 경우 실내외 기온차가 낮은 그룹에서는 부하를 경감시키는 방향으로 작용하고, 실내외 기온차에 따라 부하를 증가시키거나 경감시키는 방향으로 작용하는 것으로 나타났으므로 이 기준 온도차의 선택이 중요한 것으로 판단된다. 지중전열부하에 비하여는 환기전열부하가 더 큰 비중을 차지하므로 에너지 절감을 위해서는 틈새환기율을 줄일 수 있는 대책이 필요한 것으로 판단된다.

퇴비화촉진을 위한 쓰레기 수거체계의 확립 I. 음식물찌꺼기 원단위 발생량의 산정 (Establishment of Waste Collection and Transportation System for Composting I. Estimation of Unit Garbage Generation)

  • 신항식;황응주;강호;이시진;장원
    • 유기물자원화
    • /
    • 제3권2호
    • /
    • pp.25-36
    • /
    • 1995
  • 쓰레기는 여러가지 물질이 혼합되어 나오므로 퇴비화 시설의 성공적 운영을 위해서는 퇴비화에 적합한 쓰레기만을 분리해내는 것이 중요하다. 또한, 이를 위해서는 다양한 발생원에 산재하는 퇴비화 가능 쓰레기의 총량을 산출하는 것이 필요하며, 이를 바탕으로 쓰레기의 적정 수거체계는 물론이고 필요한 퇴비화시설의 규모 및 갯수도 산정이 가능하다. 본 연구에서는 주된 퇴비화 대상인 음식물찌꺼기의 발생량을 추정하였다. 원단위의 실측은 업소의 면적을 기준으로 하는가 또는 이용객의 수를 기준으로 하는가에 따라 상이한 결과를 보일 수 있는데 기존의 연구에서는 이것에 대한 기준이 제시되지 않은 문제가 있었다. 따라서 본 논문에서는 업소의 면적과 이용자수간의 상관관계를 분석하여 관계식을 유도하고, 이를 실제의 발생량 추산에 이용한 결과를 통해 원단위 측정시의 기준을 제시하였다. 그 결과 면적 기준과 이용자수 기준의 실측자료의 상대분산값은 각각 62.5와 52.8로 비슷하지만 이용자수 기준의 실측자료가 상대적으로 다소 변화가 적었다. 업소의 면적과 이용자수간의 상관성에서는 선형회귀분석결과 Y=0.244X+59.0인 관계가 구해졌으며, 이 때의 상관계수는 0.904이었다. 반면 Monod식 형태의 회귀분석에서는 Y=616.5X/(X+1215.4) 인 관계가 구해졌고 이때의 상관계수는 0.720으로 구해졌다. 선형회귀분석결과에서 얻어진 관계식을 이용하여 서울과 전국의 음식물찌꺼기 발생량을 산출한 결과는 2043.9톤/일, 9014.0톤/일과 같았고, 면적기준의 실측 원단위자료를 모든 면적의 업소에 대해 동일하게 적용했을 때는 821.3톤/일과 3821.0톤/일로 상대적으로 적은 수치를 보였다. 또한 1994년의 퇴비화 의무대상업소의 발생량은 집단급식소 9.3톤/일, 식품접객업소 3.3톤/일로 산출되었다. 결론적으로 음식물찌꺼기의 발생량을 산출하기 위한 원단위 발생량의 실사는 실측지점을 줄이면서 실측지의 대표성을 확보할 수 있는 이용객 기준의 측정방법이 바람직하며, 이는 특히 업소의 면적이 통계자료로 되어 있는 식품접객업소에서 유효하리라 판단되었다.

  • PDF