• Title/Summary/Keyword: Gyeongbu

Search Result 119, Processing Time 0.026 seconds

Experimental Study on the Characteristics of Pressure Variation of KTX Passing Through Tunnel

  • Nam, Seong-Won
    • International Journal of Railway
    • /
    • v.1 no.4
    • /
    • pp.169-174
    • /
    • 2008
  • Experimental study has been conducted to clarify the internal and external pressure variation characteristics for KTX(Korea Train eXpress) passing through tunnel. Abrupt pressure variation gives rise to the ear-discomfort for passenger and fatigue for car body. In this study, the internal and external pressure variation are measured by using KTX real train experiment and on-board portable data acquisition system in Gyeongbu high speed commercial line. The tunnels from 200 m to 4000 m in length are chosen for the investigation of tunnel length effects. From the results of experiment, the internal pressure variation rate for all the test tunnels is lower than the standard criteria of 200 Pa/s. And, the critical tunnel lengths for pressure wave pattern are classified into 7 groups by using the theoretical L-t diagram analysis.

  • PDF

Analysis of Harmonic Frequency for Return Current on the Track Circuit in Electrical Railway System (전기철도시스템에서 궤도회로 측면의 귀선전류 고조파 분석)

  • Beak, Jong-Hyen
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.5
    • /
    • pp.698-704
    • /
    • 2012
  • Electric power used in electrical vehicles flows into the substation through the feedback circuit, track circuit. Due to these power conversion equipments in electrical railroads, return current contains harmonics, and it should not affect other communication lines. In this paper, based on the return currents, we measured harmonics and analyzed an influence in railway equipments due to the harmonics. For analysis, we utilize the measured values of return currents measured in track circuits, and predictive values of those compared to the earth methods between the existing electrified sections. Applying the regulations used for Gyeongbu HSL(High Speed Line), the results of measured harmonics have found to be acceptable.

The Study on Centralization & Electronic for Maintenance Efficiency of Ground Signaling System (지상신호설비의 유지보수 효율화를 위한 집중화 및 전자화 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu;Lee, Kang-Mi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2983-2988
    • /
    • 2010
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. Domestic railway signaling systems are being developed by electrification. In these systems the electrification of interlocking reaches 57% and the safety equipments of railway crossings in trackside devices have completed their development into an integrated system. Block systems of all the existing sections have not yet electrified and integrated so that they need a number of complement in terms of construction and maintenance. For ABS currently used in existing domestic lines, and LEU being installed in Gyeongbu and Honam lines, although a train is controlled by the signaling information of the same train in the same location, the system is separately installed so that the same information is separately divided and transmitted at the each distinct system. Therefore, in the conventional ABS and LEU, there are a lot of duplicate installed compartments such as lamp detection and a power supply unit. Hence, we have a lot of problems: for maintenance, a lot of manpower and costs need to be invested and the overall manufacturing costs get higher, as well as the construction costs by duplicate. Therefore, this paper suggest design to develop an integrated electronic Block Control Unit by the integration of the currently used ABS, and communication and electronic technology. We are to monitor and manage the block systems in the corresponding station by integrating. And we are to transmit information together with LEU, which is an ATS wayside transmitter.

A Study on Construction of Express Lane Applied by Bus Only Lane as Seperation Facility: Focused on Pangyo-Hannam Section of Gyeongbu Expressway (버스전용차로를 분리시설로 활용한 Express Lane 구축에 관한 연구: 경부고속도로 판교-한남 구간을 중심으로)

  • Kim, Min Kyoung;Kim, Ju Hyun;Shin, Eon Kyo
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.4
    • /
    • pp.32-46
    • /
    • 2013
  • Because of short length between interchanges, traffic congestion has been caused by a lot of short trip traffic in the urban section of interregional expressway. Also, in case of expressway with Bus Only Lane, bus causes dangerous situation by conflicting between vehicles and buses in order to access from Bus Only Lane to IC. Therefore, this study aims to propose Express Lane applied by Bus Only Lane as a new lane operation in order to efficiently operate and to analyze the effectiveness on constructing Express Lane to the Pangyo-Hannam section in Gyeongbu Expressway. The study analyzes effectiveness by scenario using the micro traffic simulation tool, VISSIM 5.4. For this, the indicators which evaluate construction effect of Express Lane, are used by average delay time, average speed and total travel time. The results of the study showed the best effectiveness when Express Lane installed one, and it represented an ideal traffic condition when long distance trip traffic of the whole traffic is 25% in the study section. Therefore, the construction of Express Lane using Bus Only Lane achieves positive effectiveness on safety and expense aspect as well as uncongested flow.

Calculation of the Normal Operation Rate of Monitoring Hardware in the Long Tunnels of High-Speed and Urban Railways (고속 철도와 도시철도 장대터널 계측기기의 정상 작동율 산정 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.80-90
    • /
    • 2022
  • Purpose: The objective of this study was to improve smart monitoring and monitoring management technology in long tunnels by investigating and analyzing the normal operation rates of monitoring hardware in the long tunnels of high-speed and urban railways. Method: This study evaluated, analyzed, and compared the normal operation rate of 6-8 types of monitoring hardware for each long tunnel, targeting three high-speed railway lines with a long tunnel (i.e., Suseo-Pyeongtaek Line, Gyeongbu Line, and Honam Line) and two urban railway groups with a long tunnel (i.e., Seoul Metro Lines 5, 6, and 7, and 9). Result: The rank of the normal operation rate of monitoring hardware was in the order of Suseo-Pyeongtaek High-Speed Railway (92.1%), Seoul Metro Lines 5, 6, and 7 (85.8%), Seoul Metro Line 9 (85.2%), Gyeongbu High-speed Railway (80.5%), and Honam High-speed Railway (46.7%). Conclusion: The mean normal operation rate of the monitoring hardware in the three high-speed railway long tunnels was 83.4%, and that of the two urban railway long tunnels was 85.5%, indicating that the deviation between them was small. The mean normal operation rate of the monitoring hardware in the long tunnels of the five high-speed and urban railway lines was 84.2%.

A study on full-face sequential blasting using electronic detonator (전자뇌관을 이용한 수직구 전단면 다단시차 분할 발파에 대한 연구)

  • Yoon, Ji-Sun;Kim, Su-Hyun;Bae, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.177-184
    • /
    • 2008
  • In this study, in order to reduce appeals regarding vibration and noise from blasts, the optimum delay-time of the electronic detonator, which can minimize blast vibration, is found through blast-waveform composition and blasting simulation, and we have developed the full-face Sequential Blasting Method based on the studies of damping properties of full-face section blasting. The optimum delay-time of the electronic detonator and Full-face Sequential Blasting Method using electronic detonator was applied to the Gyeongbu high-speed railway construction site to test the feasibility of this method.

  • PDF

A Study on the Effective and Speedy container handing system(E&S) Effectiveness in railroad (철도 화물취급역 입환생략모델(E&S) 도입 효과에 관한 연구)

  • Kim, Ick-Hee;Yoon, Dong-Hee;Hong, Cheon-Hi
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.505-510
    • /
    • 2011
  • The railroad freight transport has great merits that can transport mass and specific items(dangerous goods), but it takes a long time because of low accessibility to the logistics facility and the complex process of loading freight in middle station. This paper analyzed volumes and characters of each railroad freight item, and was carried out the effect of applying E&S system to Gyeongbu line containers to find the method of reducing transport time and effective container transportation. As a result of Cost-Effectiveness analysis, the block train(B/T) is reducing transport time more about 1~2 hours. The road congestion cost is saving about 2.2 billion won. And due to skipping work of organizing train, personnel and equipment expenses savings expected about 9 billion won. It is expected that the E&S system enhances the container transport service and has an effect positive influence on making a efficient method of transport. But It is necessary to estimate pre-feasibility of applying E&S system that the standard of estimating cost and benefit is required further examination.

  • PDF

A Cost-Benefit Analysis for the Installation of Piezoelectric Energy Harvester (압전에너지 하베스터 설치사업의 경제성 분석에 관한 연구)

  • Lee, Hyun-Kyung;Lee, Min-Gi;Kim, Hong-Bae
    • Journal of the Korean Regional Science Association
    • /
    • v.33 no.3
    • /
    • pp.49-59
    • /
    • 2017
  • The piezoelectric energy harvester is recently being developed and catching on as a way to achieve low carbon green growth. The practical application of the piezoelectric energy harvester is expected to contribute not only to the reduction of greenhouse gas emissions but also to the improvement of residents' welfare. This paper conducted a cost-benefit analysis for the installation of piezoelectric energy harvester on the highway focusing on its impacts on the public. The results showed that the installation of piezoelectric energy harvester on the gyeongbu highway is economically feasible in that it could increase the social welfare for the residents. Finally, this paper suggests policy direction for the practical use of the piezoelectric energy harvester, based on the results obtained.

Analysis of Groundwater Discharge into the Geumjeong Tunnel and Baseflow Using Groundwater Modeling and Long-term Monitoring (금정터널내의 지하수 유출량과 기저유출량 변화 분석)

  • Cheong, Jae-Yeol;Hamm, Se-Yeong;Yu, Il-Ryun;Whang, Hak-Soo;Kim, Sang-Hyun;Kim, Moon-Su
    • Journal of Environmental Science International
    • /
    • v.24 no.12
    • /
    • pp.1691-1703
    • /
    • 2015
  • When constructing tunnels, it is important to understand structural, geological and hydrogeological conditions. Geumgeong tunnel that has been constructed in Mt. Geumjeong for the Gyeongbu express railway induced rapid drawdown of groundwater in the tunnel construction area and surroundings. This study aimed to analyze groundwater flow system and baseflow using long-term monitoring and groundwater flow modeling around Geumgeong tunnel. Field hydraulic tests were carried out in order to estimate hydraulic conductivity, transmissivity, and storativity in the study area. Following the formula of Turc and groundwater flow modeling, the annual evapotranspiration and recharge rate including baseflow were estimated as 48% and 23% compared to annual precipitation, respectively. According to the transient modeling for 12 years after tunnel excavation, baseflow was estimated as $9,796-9,402m^3/day$ with a decreasing tendency.

Characteristics of Noise and Vibration emitted from Turnout System (열차 통과시 분기기 인근 소음진동 발생특성)

  • Im, Jung-Bin;Lee, Hong-Ki;Park, Hae-Dong;Um, Ki-Young;Um, Ju-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.747-750
    • /
    • 2006
  • A turnout which permits trains to pass from one track to another has a disconnecting rail component, namely a crossing, so that noise and vibration arc occurred abruptly when train is passing through it. In Korea, it is planned to adopt the high speed tilting train, which operates at the speed of 180 km/h, at the conventional line. However, for application of the tilting train, it is prerequisite to establish the stable turnout system allowing the tilting train to pass through it without reducing speed. This study was performed to evaluate noise and vibration emitted from the prototype turnout which is developed for speed-up of the conventional line. For the purpose, noise and vibration were measured at near the conventional turnout and the improved one, which is constructed at Waegwan station and Kumi station of Gyeongbu line, respectively.

  • PDF