• Title/Summary/Keyword: Gyeongbu

Search Result 119, Processing Time 0.037 seconds

KTX Passenger Demand Forecast with Intervention ARIMA Model (개입 ARIMA 모형을 이용한 KTX 수요예측)

  • Kim, Kwan-Hyung;Kim, Han-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.5
    • /
    • pp.470-476
    • /
    • 2011
  • This study proposed the intervention ARIMA model as a way to forecast the KTX passenger demand. The second phase of the Gyeongbu high-speed rail project and the financial crisis in 2008 were analyzed in order to determine the effect of time series on the opening of a new line and economic impact. As a result, the financial crisis showed that there is no statistically significant impact, but the second phase of the Gyeongbu high-speed rail project showed that the weekday trips increased about 17,000 trips/day and the weekend trips increased about 26,000 trips/day. This study is meaningful in that the intervention explained the phenomena affecting the time series of KTX trip and analyzed the impact on intervention of time series quantitatively. The developed model can be used to forecast the outline of the overall KTX demand and to validate the KTX O/D forecasting demand.

Arrival Delay Estimation in Bottleneck Section of Gyeongbu Line (철도선로용량 부족에 따른 지체발생 연구 - 경부선 서울~금천구청 구간을 대상으로)

  • Lee, Jang-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.374-390
    • /
    • 2015
  • This research shows the relationship between the number of trains and the probability of trains with arrival delay and suggests way to estimate the benefits of improved punctuality in a bottleneck section of the Gyeongbu Line. The arrival delays of high-speed and conventional trains were estimated using the train operation data of KORAIL. Linear regression models for the probability of trains with arrival delay by train type are presented in this paper. The probabilities of trains with arrival delay were more affected by the number of conventional trains than by the number of high-speed rail trains. For the empirical analysis, a project for increasing the capacity in the Seoul~Geumcheongu office section was tested. The benefits of the improved punctuality were estimated to be 4.2~4.5 billion Korean won every year. This research has some limitations but it can help evaluate more precisely the feasibility of the project of increasing the capacity in bottleneck sections.

A dropper length calculation method of the elevating span in overlap area (무효 인상 경간에서 드로퍼 길이 계산 기법)

  • Kwon, Sam-Young;Lee, Ki-Won;Cho, Yong-Hyeon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1503-1510
    • /
    • 2011
  • The dropper length calculation method about the normal same encumbrance spans is well known independent to whether the pre-sag is given or not. But, the dropper length calculation method for the elevating span which consists in the end area of a tensioning section and normally consists with overlaps is not well known. In this study, firstly, we investigate the dropper length calculation method about the elevating span whether the insulator is contained in or not, we also recognize the effect of dropper length due to the change of the take-off point. Secondly, we very this calculation method with a catenary sample data and check again with Gyeongbu HSL design data.

  • PDF

A Study on the Train Operation Optimization for Energy Saving (친환경 에너지 절약을 위한 열차운전 최적화 연구)

  • Choi, Ik-Sik;Jang, Woo-Jin;Choi, Kyu-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1059-1065
    • /
    • 2011
  • In line with the expansion of electric railway, reducing carbon emission and optimal train operation are required by economical, eco-friendly and efficient management. Most of the energy consumption in electric railway is consumed by train operation. So it is important that minimize the energy consumption in train operation. An analysis of the operation performance of the new model vehicle which in South Korea, Korail introduced shows that the energy consumption is different in line with the skill level of the engine driver. In this study, the know-how of train operation of a skilled engine driver is systematized by using artificial intelligence, and the technique which supports engine drivers with train operation was offered. As a result of applying in South Korea, the Gyeongbu line by using simulation, it confirmed that the maximum 20% can reduce the energy consumption in comparison with unskilled engine drivers in case of applying the Expert System.

  • PDF

Study on Securing Train Braking Distances according to the Schedule Speed Improvement (표정속도 향상에 따른 열차제동거리 확보방안 연구)

  • Lee, Hoon-Koo;Kim, Jin-Chuol;Lee, Soo-Hwan;Lee, Boo-Hyum;Eum, Ki-Young
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1238-1239
    • /
    • 2011
  • For the domestic railways, we carry out the speed-up project for the maximum speed, came out of the plan on the schedule speed improvement, such as the Gyeongbu HSR 1st and 2nd step project and the speed-up project of the major trunk railways. As the speed increase, we shall review the conventional calculation methods for braking distances and identify the increase of braking distances. In this way, we shall secure the safe braking distances.

  • PDF

Prediction of Planning Time in Busan Ports-Connected Expressways

  • Kim, Tae-Gon
    • Journal of Navigation and Port Research
    • /
    • v.40 no.2
    • /
    • pp.51-56
    • /
    • 2016
  • Expressways mean the primary arterial highways with a high level of efficiency and safety. However, Gyeongbu and Namhae expressways connected with Busan ports are showing travel time delay by increased traffic including the medium/large-sized vehicles of about 20% compared to those of about 13% regardless of the peak periods. This study, thus, intends to analyze lane traffic characteristics in the basic 8-lane segments of the above-mentioned expressways, compute the planning and buffer times based on travel time reliability, find the lane speed showing a higher correlation with planning time between the lane speeds in the basic 8-lane segments, and finally suggest a correlation model for predicting the planning time in expressways.

Study on the Utilization of HBD in the Conventional Speed-up Lines (일반철도 고속화 구간에서 차축온도검지장치 활용방안에 대한 연구)

  • Choe, Gwon-Hui;Kim, Yu-Ho;Baek, Seung-Mun;Bing, Gun-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.233-243
    • /
    • 2012
  • HBD(Hot Box Detector) is a device to monitor temperature rises to inappropriate lubricant use or mechanical defects. If a train operates without recognizing such an effect, it might result in bearing overheating due to defects and cause a dangerous situation that it could derail a train owing to the damage of axles. Now for the Gyeongbu HSL at 300km/h, the laws related to monitoring overheated axle bearings are notified in the Railway Safety Law and the Railway Construction Law. But in case of the conventional speed-up lines that a train operates at 180 to 230 km/h, the revised bill of relevant standards is ongoing. Therefore in this paper we present references and reviews investigated in order to use the optimal HBD in the conventional speed-up lines.

  • PDF

Research for the Railway Route Planning Adjacent the Protective Zone of Cultural Assets (문화재 보호구역 주변 근접통과 구간의 철도노선 계획 사례 연구)

  • Roh, Byoung-Kuk;Kim, Jae-Bok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2258-2270
    • /
    • 2008
  • After rapid running is begun in domestic, problem by the train wind that was not considered at existent train running appeared. If the High-Speed railway business speed rises by 350km/h in the future, is going to become more big issue. This study conducts an experiment that measure in local about KTX train beside Gyeongbu High-Speed railway track about aerodynamics effect that happen by passage of train and analyzed. In case KTX II runs with the 350km/h speed, forecasted effect that get in the simple vertical surfaces parallel to tracks according to distance from rail center. Compared construction size with structural analysis in case do not consider with case that consider the train wind about soundproofing walls representatively. As a result, proposed wind load standard that apply at soundproofing walls design.

  • PDF

Analysis of Relationship between the Irregularities of Rail Weld Surface and Track Irregularities (레일용접부 요철과 궤도틀림 상관관계 분석)

  • Woo, Byoung-Koo;Kim, Yong-Hyok;Yun, Un-San;Kim, Kwan-Hyung;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.539-545
    • /
    • 2009
  • KTX trains which began passenger service between Seoul and Busan in April 2004 have gained very high evaluation for their safe operation. Track is one of the most important means to keep KTX safety, it has not been a fail of safe structure. The track failure during operation may lead to a severe accident. So, it is to be verified the confidence of track maintenance management on the high speed line. This paper would like to find a track deformation trend through a comparative analysis on actual measurement data at these times. It discusses the effect of cyclic dynamic load at welding part. KTX dynamic impact load was measured in accordance with a rail surface irregularity and analyzed some track irregularities according to the condition of rail profile at welding part in the Gyeongbu high speed line.

  • PDF

A Review of tension variation according to the geometry of distribution bars and a design of straight-shaped bar (일괄식 장력장치타입에서 장력분배바 타입별 장력변동특성 검토 및 직선형 장력분배바 설계)

  • 권삼영;이기원;천선기;이희성
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.503-508
    • /
    • 2002
  • In this study, the relation between the mtation which are usually caused by the creep of the contact wire, the bar geometry and the forces(wire tensions) for the triangle-shaped distribution bar and straight-shaped one in dependent tensioning device system is reviewed. According to the result a rotation of distribution bar in triangle-shaped one modifies the distribution of the tensions between the three wires hooked in a distribution bar. On the contrary, a rotation on the straight-shaped one leads to no tension distribution change. Therefore, to use the straight-shaped distribution bar instead of triangle-shaped one is recommended. In addition, the design contents of the distribution bar which will be used in electrification of Gyeongbu line are described in this paper.

  • PDF