• Title/Summary/Keyword: Gushout water

Search Result 3, Processing Time 0.028 seconds

Concentrations and Natural 15N Abundances of NO3-N in Groundwater and Percolation Water from Intensive Vegetable Cultivation Area in Japan (일본 노지채소 집약 재배지역 토양 침출수 중의 NO3-N 농도와 질소 안정동위원소 자연존재비(δ15N))

  • Park, Kwang-Lai;Choi, Jae-Seong;Baek, Hyung-Jin;Kim, Won-Il;Jung, Goo-Bok;Yun, Sun-Gang;Cho, Jin-Kyu
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.36 no.3
    • /
    • pp.119-126
    • /
    • 2003
  • Nitrate-N concentrations and the corresponding ${\delta}^{15}N$ values were determined with water samples collected periodically from artesian wells (3 and 6 m deep), underdrainage and gushout waters in a Welsh onion cultivated area in the Kushibiki Fan, Saitama Prefecture, Japan. Average $NO_3-N$ concentrations in waters from 3 and 6 m wells were 25.7 and $2.8mg\;L^{-1}$, whereas ${\delta}^{15}N$ values were 3.6 and 4.7‰, respectively. The $NO_3-N$ concentration and ${\delta}^{15}N$ value of the underdrainge water were $35.5mg\;L^{-1}$ and 6.6‰, reflecting rapid input of chemical fertilizers and farmyard manure. The mean values of $NO_3-N$ concentration and ${\delta}^{15}N$ in the gushout water flown out of the edge of Kushibiki Fan were $19.4mg\;L^{-1}$ and 7.9‰, respectively. As a results the ${\delta}^{15}N$ values of the gushout water were higher than those of the artesian wells and underdrinage water. The ${\delta}^{15}N$ values of total-N and $NO_3-N$ of the soils were 6.1 and 5.10‰, respectively, while those for nitrification-inhibitor containing fertilizer and slow-release fertilizers were -6.1 and -2.2‰, respectively.

Construction of Marine Small Hydro Power Plant using Discharge Water of Fish Farm (양어장 방류수를 이용한 해양소수력발전소 구축에 관한 연구)

  • Hwang, Yeong-Cheol;Choi, Young-Do
    • The KSFM Journal of Fluid Machinery
    • /
    • v.16 no.5
    • /
    • pp.11-17
    • /
    • 2013
  • This study is aimed to construct a marine small hydro power plant using discharge water of fish farm in Jeju Haengwon-ri. The difference of design methods between marine small hydro power plant and land small hydro power plant is to consider the tides. Moreover, ground condition should be examined because gushout sea water comes out from the ground at high tide in Jeju as the ground of Jeju beach consists of basalt stone. From the field test of the turbine generator after construction of the power plant, output power and efficiency of the turbine generator shows good conformance to the required conditions.

Various Meanings of Wolji Pond Construction in Shilla Dynasty (월지 조성 목적의 중의성(重意性) 고찰)

  • Hong, Kwang-Pyo
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.34 no.3
    • /
    • pp.67-77
    • /
    • 2016
  • This study was initiated from question raised on existing study achievement that purpose for Wolji construction simply was to build gardens. In this research, after raising a question on existing theory about the Wolji construction, another purpose of Wolji construction is investigated. Study result is as follows. First, two questions raised on Wolji construction are "Was Wolji constructed as a garden from the beginning?" and "Was Wolji region available land as now at time of creation?" However, it was verified that the purpose of Wolji construction was to use not as a garden but as a detention pond, and the land of such region was unserviceable at time of Wolji construction. Second, in terms of locations and Topography, it was confirmed that Wolji has a favorable condition for undercurrent function as it is positioned at the end point of flow path formed by gushout water spurting from the water flooded from Bukcheon, or low and wetland. Third, from hydraulic point of view, Bukcheon always has a possibility of flooding occurrence before completing river bank build up, and such flooding damage was curved at Guhwangdongwonji, and at Wolji once again in order to prevent the damage spread into the center of Wanggyeong. Fourth, from urban planning point of view, it was confirmed that urban functions were not established in Wolji region before Wolji construction, and urban planning was completed through the opening of roads and others, after Wolji construction. Fifth, it was confirmed that inflow and outflow device of Wolji, and vertical stone platform at western side of Wolji were the facilities to provide sufficient functions as detention ponds.