• Title/Summary/Keyword: Guideline of Construction Cost

Search Result 66, Processing Time 0.02 seconds

Sensitivity Analysis on Design Factor of Ground Heat Exchanger for Optimum Design of Vertical Ground Source Heat Pump System (수직밀폐형 지중열교환기의 최적설계를 위한 설계인자 영향도 분석)

  • Bae, Sangmu;Kim, Hongkyo;Nam, Yujin
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.87-93
    • /
    • 2018
  • Ground source heat pump(GSHP) system is one of the high efficiency heat source systems which utilizes the constant geothermal energy of a underground water or soil. However, the design of conventional GSHP system in the domestic market is dependent on the experience of the designer and the installer, and it causes increase of initial installation cost or degradation of system performance. Therefore, it is necessary to develop a guideline and the optimal design method to maintain stable performance of the system and reduce installation cost. In this study, in order to optimize the GSHP system, design factors according to ground heat exchanger(GHX) type have been examine by simulation tool. Furthermore, the design factors and the correlation of a single U-tube and a double U-tube were analyzed quantitatively through sensitivity analysis. Results indicated that, the length of the ground heat exchanger was greatly influenced by grout thermal conductivity for single U-tube and pipe spacing for double U-tube.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF

Design of Passive Treatment Systems for Mine Drainage Waters

  • Jeen, Sung-Wook
    • Journal of Soil and Groundwater Environment
    • /
    • v.22 no.2
    • /
    • pp.1-9
    • /
    • 2017
  • Passive treatment systems are commonly used for remediation of mine drainage waters because they do not require continuous chemical inputs and operation. In this study, the selection and design criteria for such systems were evaluated, particularly the two most commonly used ones, i.e., permeable reactive barriers (PRBs) and vertical flow biological reactors (VFBRs). PRBs and VFBRs are operated on the same principles in terms of biochemical reaction mechanisms, whereas differences relate to configuration, engineering, and water management. In this study, each of these systems were described with respect to key design variables, such as metal removal mechanisms and removal rates, effectiveness and longevity, general design and construction, flow capacity, and cost. The information provided from this study could be used as a design guideline when a passive treatment option is considered for potential remediation of a mine site.

Status and Improvement of the Mitigation Option to the Suspended Sediments in Coastal Development Projects - Focused on Silt Protector - (해안개발사업의 부유토사 저감방안의 현황 및 개선방안 - 오탁방지막을 중심으로 -)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Joo, Yong-Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.5
    • /
    • pp.289-297
    • /
    • 2006
  • The study investigates the problems of silt protector used for mitigation measure of suspended sediments (SS) during coastal construction and provides their improvements based on the field investigation and analysis of the environmental impact assessment reports for the coastal development projects of Korea. The field investigation along west, east and south coasts of Korea reveals a variety of problems in the installation and management of silt protector solely used for the SS mitigation in Korea. Major problems include installation itself, low cost and quality of silt protector, and maintenance. These problems superimpose the effectiveness of silt protector in mitigating coastal environment impact. The present study provides the specific guideline on the project type needed for the installation of silt protector, installation standard and planning, maintenance and management. The study also suggests new mitigation options such as environmental window to limit the construction period and environmental dredger to compensate for the deficits of silt protector.

Area Identification for Road Design (도로 설계 지역 구분)

  • Kim, Yong Seok
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.181-189
    • /
    • 2014
  • PURPOSES : Ambiguous decision on whether rural or urban area for road design can increase the construction cost and restrict the land use of surrounding area. However, administrative classification on rural and urban area is not directly related to road design because of this classification is not based on the engineering viewpoint, so method which can explain the road design context is required. METHODS : Method which enables to identify the area for road design is suggested based on the deceleration expected to be experienced by drivers who use the road section concerned. Deceleration rate corresponding to the area such as rural or urban suggested in Road Design Guideline is used as the criteria to identify the area by comparing this value with the estimated deceleration rate at the road section concerned. Speed profile method is utilized to derive the deceleration rate, and speed estimation way for reflecting both road geometry and intersection is suggested using stopping sight distance concept. RESULTS : The procedure of the method application is suggested, and the design example utilizing the method is provided. CONCLUSIONS : The method is expected to be used to identify the area for road design with engineering viewpoint, and design consistency among the roads with similar driving environment can be made.

Correlation between Storm Characteristics and Flood Damage (우리나라 호우특성과 홍수피해와의 상관관계)

  • Park, Doo-Ho;Ahn, Jae-Hyun;Choi, Yong-Joon
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.219-229
    • /
    • 2011
  • In this study, Correlation analysis for relationship between storm characteristics and flood damage cost was carried out using histogram analysis. The spatial range of flood damage cost data was the whole country and 16 provinces in the Korea, and period range was 16 years, from 1994 to 2009. According to the results of this analysis, most of total flood damage cost was highest in small; middle scale rainfall events of high frequency. Based on the results of comparison among 16 provinces, the ability to prevent flood demage of metropolitan was better than that of provinces. And the storm characteristics of causing maximum flood damage cost was different from each provinces. Therefore, the construction size in flood defence measures has to be determined when flood defence measures considering the results of this study as an useful guideline.

Build up management mind of the construction expert engineer (건설전문기술자의 경영마인드 정립에 관한 연구)

  • Chun, Jin-Ku;Kim, Byeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.45-55
    • /
    • 2006
  • This study aims need set of mind to construction manager built a theory logic conceive decision making system and principles designed to create the administrative procedures that a company needs to integrate management and environmental concerns into its daily business practices. Integrate considerations of risk reduction and wise resource management into daily business decision making environmental that includes performance and cost. Seek to make better Dynamic time solutions that promote competitiveness set of management mind provide business with tools and methodologies management participation, psychology, philosophy effects of resource flows. A last of understand use of the decision making element principal as a guideline for evaluating and ranking approaches. The result of this study are summarized as follows; (1) setting for approach decision making of manager police, (2) dynamic of time and management mind (3) a primary factor out environment to decision making (4) methodologies of set up system for management mind (5) expectation effect of management mind.

Development of Maintenance Prototype for Dam Facilities Using NFC Technology (댐 시설물의 NFC 기반 이력관리시스템 프로토타입 개발)

  • An, Ji-Won;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.261-271
    • /
    • 2014
  • Construction industry becomes large and complicated as that occurred in the construction processes and operations, and the growing social demand for more systematic and efficient methods of integrated management increases. Current facility maintenance system has been regarded as large labor-intensive and fairly stagnant, and faced on several issues including inefficiency in cost and time to collect and utilize various field information. Thus, this paper presents a maintenance prototype utilizing NFC technology and smart devices to efficiently collect and manage the field information in the course of the construction processes. By choosing dam facilities as a case study, construction data for dam inspection and maintenance were classified according to dam maintenance guideline, and database structure was constructed to incorporate with the NFC tags and smart device interface. The system prototype presented in this paper would improve the quality of the dam facilities maintenance system and provide business convenience and usability by contributing increased efficiency of field information management and sharing.

A Study on the Space Organization and Facility Equipment of Medical Laboratory - focusing on the USA, UK and Germany - (병원 진단검사의학부의 공간구조와 설비기준에 대한 조사 - 미국, 영국, 독일을 중심으로 -)

  • Kim, Youngaee
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.3
    • /
    • pp.7-15
    • /
    • 2016
  • Purpose: As medicare services have gotten spreaded, clinical laboratory has been dominant position. So, it has been acted for quality control and clinical pathology accreditation. But there has been quite deficient information to evaluate working space and technical standards of medical laboratory for accreditation. This study goals to figure out accreditation standard and design guideline for clinical laboratory, and to give safe and efficient design information. Methods: This study has been searched by literature for accreditation standards and design guidelines of clinical pathology in USA, UK, and Germany. Results: Three countries have accredited based on working lab space, staff space, storage space, patient space and health and safety equipment. Design guidelines of three countries commonly have focused on worktable layout, worktable distance and module, and specific laboratory biosafety level. And USA guidelines stress on the architectural design such as design process and passage distance for escape, UK stress on the efficiency as functional work flow and construction cost, lastly Germany design guidelines stress on the operator's safety distance and workstation. Three countries have not only accreditation standards but also design guidelines for more specific quality management, separating from accrediting institute. Implications: In korea, it has been needed to make clinical laboratory design guideline for the safe and efficient environment and reliable and competitive medical service.

A Study on Change Orders in Overseas Construction using Feature Selection - Focus on Plant Construction in the Middle East - (Feature Selection을 활용한 해외 건설의 공사변경 관리에 관한 연구 - 중동 플랜트 건설프로젝트를 중심으로 -)

  • Hong, Sunyoung;Yeom, Chunho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.63-71
    • /
    • 2021
  • This paper looks into how to enhance construction project management, focusing on the change order, which is often considered one of the major causes for construction delays, disputes, and claims in the middle east construction. First, this paper categorizes the major causes of change orders. It suggests a detailed classification standard for affecting factors resulting from change orders based on a case study result of an on-going construction project in the Middle East. In particular, this paper presents a method to apply a machine learning-based feature selection to quantify the importance of change order triggers and affecting factors. As a result, the case study identifies six major change order triggers and eight affecting factors. Also, a meaningful relationship between change order triggers and affecting factors by each category is presented. This paper will contribute to setting a clear guideline for change order management for the international plant construction field while helping prevent construction delays and cost run-ups by reducing the time required for change order resolution between project owners and contractors.