• Title/Summary/Keyword: Growth Delay

Search Result 381, Processing Time 0.029 seconds

Small Fatigue Crack Measurement and Crack Growth Characteristics for Smooth and Notch Specimens (평활 및 노치재의 미소피로균열측정과 성장특성)

  • 이종형
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.17 no.9
    • /
    • pp.2145-2152
    • /
    • 1993
  • The objective of this paper is to examine the detection limit, growth characteristics and notch curvature radius in short crack problem. Measurement techniques such as ultrasonic method and back-face strain compliance method were adopted. The fatigue crack growth rate of the short crack is slower than that of a long crack for a notched specimen. The characteristic of crack growth and crack closure is same as the case of a delay of crack growth caused by constant amplitude load for an ideal crack or single peak overload for a fatigue crack. The short crack is detected effectively by ultrasonic method. A short surface crack occurs in the middle of specimen thickness and is transient to a through crack depth is larger than the notch curvature radius.

Analysis of fatigue Crack Growth Behavior in the Integrally Stiffened Panels Subjected to Single Overload (과하중을 받는 일체형 보강판의 피로균열 성장거동 해석)

  • 이환우;서정호
    • Journal of Ocean Engineering and Technology
    • /
    • v.18 no.1
    • /
    • pp.28-34
    • /
    • 2004
  • It is well known that tensile peak overloads may significantly delay suubsequent constant amplitude fatigue crack growth in many materials. Since real structures are usually subjected to complex load histories, the ability to predict accurate crack growth under realistic service conditions is of major engineering interest. This paper describes experiments on fatigue track growth in the integrally stiffened panel of 7075-T6 aluminum alloy. The effect of shape parameters and overload position on the fatigue crack growth behavior of integrally stiffened panels are discussed. Based on the experimental results, the following conclusions have been drawn: the overall fatigue crack growth retardation resulting from single overload in the stiffened panels was generally larger in the larger thickness ratio, although the retardation trends, according to the change in overload positions, were similar to those exhibited in the non-stiffened panels.

A Study on Congestion Change of Dual Airways between Korea-China (한·중 항로 복선화 전후 혼잡도 변화 연구)

  • Cho, Jin Ho;Baik, Ho Jong;Chang, Jo Won
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.28 no.1
    • /
    • pp.7-13
    • /
    • 2020
  • A significant growth in local air traffic volume is leading to airway congestion and flight delays especially for Incheon-China and Incheon-Europe sectors. A key method to increase the airway capacity is to place a supplemental airway parallel to the existing one and in cooperation between the aviation authorities between China and Korea, a dual airway track was implemented on December 6, 2018. Here, we use airline A's flight data to analyze the congestion change effect of the new airway. Results show total delay time to Europe is reduced 51% (13.4 to 6.6 minutes) as the delay distribution for 16-30 minutes, 31 minutes and greater decreased from 23.2% to 8.2% and 8.7% to 1.0% respectively. The delay to China also decreased but the drop is not as significant as flights to Europe. This is caused by the difference in flight distance, traffic volume, and characteristics of flights landing and transiting China. Flights to Europe show a broad distribution in altitude allocation and reduction in aircraft separation demonstrating the effectiveness of a dual airway track.

Application of Full-Face Round by Sequential Blasting Machine in Tunnel Excavation (터널굴착에서 다단식 발파기에 의한 전단면 발파의 적용성 연구)

  • 조영동;이상은;임한욱
    • Explosives and Blasting
    • /
    • v.13 no.1
    • /
    • pp.20-31
    • /
    • 1995
  • Many methods and techniques to reduce ground vibrations are well known. Some of them are to adopt electric milisecond detonators with a sequential blasting machine or an initiating system with an adequate number of delay intervals. The types of electric detonators munufactured in Korea include instantaneous, decisecond and milisecond delays byt numbers of delay intervals are only limite from No.1 to No.20 respectively. It is not sufficient to control accurately milisecond time with these detonators in tunnel excavation. Sequential fire time refers to adding an external time delay to a detonators norminal firing time to obtain sequential initiation and it is determined by sequential timer setting. To reduce the vibration level, sequential blasting machine with decisecond detonatore was adopted. A total of 134 blasting was recorded at various sites. Blast-to-structure distances ranged from 20.3 to 42.0 meter, where charge weight varied from 0.25 to 0.75 kg per delay. The results can be summarized as follow : 1. The effects of sequential blasting machine on the vibration level are discussed. The vibration level by S.B.M. are decreased approximately 14.38~18.05 to compare to level of conventional blasting and cycle time per round can be saved. 2. The empirical equations of particle velocity were obtained in S,B.M. and conventional blastin. $V=K(D/W^{1/3})-n$. where the values for n and k are estimated to be 1.665 to 1.710 and 93.59 to 137 respectively. 3. The growth of cracks due to vibrations are found but the level fall to within allowable value.

  • PDF

Study on the OCR Setting Using the Voltage Component Considering Application of the SFCL in a Power Distribution System (배전계통에 초전도한류기 적용시 전압요소를 이용한 과전류계전기 정정 연구)

  • Lim, Seung-Taek;Lim, Sung-Hun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.12
    • /
    • pp.1587-1594
    • /
    • 2018
  • In south korea, the government make a plan to generate the 20% of the total electrical power as renewable source like wind generation and solar generation. This plan will accelerate the increase of fault current with power industry's growth. As the increase of fault current, the superconducting fault current limiter (SFCL) has been studied. In case that the SFCL is applied in power system, it can cause the overcurrent relay (OCR)'s trip delay because of the reduced fault current. In this paper, the overcurrent relay with voltage component was suggested to improve the OCR's trip delay caused by the SFCL and compensational constant was introduced to have the trip time similar to the trip time of case without the SFCL. For conforming the effect of the suggested OCR with voltage component, the PSCAD/EMTDC simulation modeling and analysis were conducted. Through the simulation, it was conformed that the trip delay could be improved by using the suggested OCR and compensational constant.

Causes of Delay in Tall Building Projects in GCC Countries

  • Sanni-Anibire, Muizz O.;Zin, Rosli Mohamad;Olatunji, Sunday Olusanya
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.50-59
    • /
    • 2020
  • The 21st century is witnessing a rapid growth of tall buildings in urban centers globally to create more urban space for an anticipated urban population. Tall buildings, however suffer from incessant delays and sometimes total abandonment. Consequently, this study investigated and ranked the causes of delay in tall building projects, while focusing on the Gulf Cooperation Council (GCC) countries. Initially, 36 common delay causes investigated globally were categorized into 9 groups, and then further ranked utilizing the Relative Importance Index (RII) through a questionnaire survey. Tall building professionals in the GCC countries (Saudi Arabia, United Arab Emirates, Bahrain, Kuwait, Oman and Qatar) were contacted. The respondents' categories include Consultants, Contractors, and Clients' Representatives/Facility Managers. The results reveal that the top three causes include "client's cash flow problems/delays in contractor's payment", "contractor's financial difficulties", and "poor site organization and coordination between various parties". The findings from this study could help construction professionals develop guidelines and controls for delay mitigation, as well as support them in risk-based decision making in the planning of tall building projects.

  • PDF

Predicting Factors of Developmental Delay in Infant and Early Children (일 지역 보건소 내원 영유아의 발달지연의심 예측요인)

  • Ju, Hyeon-Ok;Park, Yu-Kyung;Kim, Dong-Won
    • Child Health Nursing Research
    • /
    • v.19 no.1
    • /
    • pp.12-20
    • /
    • 2013
  • Purpose: The purpose of this study was to investigate factors associated with suspicious developmental delay in infants and early childhood. Methods: Participants were 133 infants, aged from birth to 6 years old and their mothers, who were being seen at 16 Public health centers in B city. Korean Denver II was used to test infant development. ${\chi}^2$-test, Fisher's exact test and multiple logistic regression were used with SPSS 19.0 to analyze data. Results: Of participant infants, 7.5% were below the 3rd percentile for the weight percentile, 8.4% is a weight curve that crosses more than 2 percentile lines on the growth charts after previous achievement, and 9.8% had suspicious developmental delay according to Korean Denver II. Further the predictive factors related to suspicious development delay in the children were decrease of weight percentile (Odds Ratio [OR]=6.69, Confidence Interval [CI])=1.22-36.45), low economic state (OR=6.26, CI=1.50-26.00), and development delay perceived by their mothers (OR=4.99, CI=1.24-20.06). Conclusion: It is necessary to build a government level system to follow management of development of infants and children from the time of birth. Especially, it is necessary to develop a program for children in low income families.

Evolution of Limits to Growth Studies and its Implications on Concept and Strategy of Sustainable Development (성장의 한계 논의의 전개와 지속가능발전에의 함의)

  • Moon, Tae Hoon
    • Korean System Dynamics Review
    • /
    • v.17 no.2
    • /
    • pp.5-32
    • /
    • 2016
  • Purpose of this paper is to review series of Limits to Growth studies from its original Rome Club Report published in 1972 to the most recent one in 2012 by Jorgen Randers and finds its implications on concept and strategy of sustainable development. For this purpose first, this paper reviewed series of Limits to Growth studies in details with focus on scenarios used in simulation of world model. Second, response to the original Limit to Growth was reviewed and to see validity of its scenario based simulations, simulated results of interest variables and actual historical data up to the year 2010 was compared. Third, structure and key arguments in both studies, Limit to Growth studies and Our Common Future was explained and compared. Finally, implications of the Limit to Growth studies on concept and strategy for sustainable development was discussed. Based on the comparison, this paper argued that even if the term sustainable development was not used in the Limit to Growth at all, concept and strategies for sustainable development implied in the Limit to Growth are more clear and specific than those of Our Common Future. Since Limit to Growth studies were simulation based ones that produce detailed behaviors on interest variables, it clarifies more clearly the abstract concept of sustainable development and thus, provides specific guidelines for the direction of sustainable policy which has been suffering long from vagueness of concept of sustainable development.