• Title/Summary/Keyword: Groundwater flow rate

Search Result 249, Processing Time 0.03 seconds

Groundwater Modeling for Estimating Water Balance over Pyosun Watershed in Jeju Island (제주도 표선유역의 물수지 평가를 위한 지하수 유동 모델링)

  • Song, Sung-Ho;Lee, Gyu-Sang;An, Jung-Gi;Jeon, Sun-Geum;Yi, Myung-Jae
    • Journal of Environmental Science International
    • /
    • v.24 no.4
    • /
    • pp.495-504
    • /
    • 2015
  • To estimate water balance of Pyosun watershed in Jeju Island, a three-dimensional finite difference model MODFLOW was applied. Moreover, the accuracy of groundwater flow modeling was evaluated through the comparison of the recharge rate by flow modeling and the existing one from water balance model. The modeling result under the steady-state condition indicates that groundwater flow direction was from Mt. Halla to the South Sea and groundwater gradient was gradually lowered depending on the elevation. Annual recharge rate by the groundwater flow modeling in Pyosun watershed was calculated to 236 million $m^3/year$ and it was found to be very low as compared to the recharge rate 238 million $m^3/year$ by the existing water balance model. Therefore, groundwater flow modeling turned out to be useful to estimate the recharge rate in Pyosun watershed and it would be available to make groundwater management policy for watershed in the future.

터널 건설에 따른 지하수-지표수 상호 작용 및 영향에 관한 연구

  • Kim, Tae-Hee;Kim, Young-Sik;Ha, Gyoo-Chul;Kim, Kue-Young;Koh, Dong-Chan;Yang, In-Jae;Hong, Soon-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.839-846
    • /
    • 2004
  • The objective of this study is the evaluation of the tunneling effect on the groundwater-surface water interaction. The designed tunnel line is laid beneath the Gapo-cheon, which runs throughout study area. And, the pre-evaluation of the tunnel-influence on the Gapo-cheon is urgently needed. However, it is very difficult to find out the similar domestic and/or foreign cases. In this study, we would exclude the numerical modeling technique with insufficient data. Instead of the evaluation of the tunneling effect on the groundwater-surface water interaction with the numerical modeling, we monitored the flow rate of surface water at various point. We measured the flow rate of surface water at 5 points. With the results of surface flow, we can conclude that 39% of flow rate in Gapo-cheon is contributed by the groundwater discharge, as baseflow.

  • PDF

Groundwaterflow analysis of discontinuous rock mass with probabilistic approach (통계적 접근법에 의한 불연속암반의 지하수 유동해석)

  • 장현익;장근무;이정인
    • Tunnel and Underground Space
    • /
    • v.6 no.1
    • /
    • pp.30-38
    • /
    • 1996
  • A two dimensional analysis program for groundwater flow in fractured network was developed to analyze the influence of discontinuity characteristics on groundwater flow. This program involves the generation of discontinuities and also connectivity analysis. The discontinuities were generated by the probabilistic density function(P.D.F.) reflecting the characteristics of discontinuities. And the fracture network model was completed through the connectivity analysis. This program also involves the analysis of groundwater flow through the discontinuity network. The result of numerical experiment shows that the equivalent hydraulic conductivity increased and became closer to isotropic as the density and trace length increased. And hydraulic head decreased along the fracture zone because of much water-flow. The grouting increased the groundwater head around cavern. An analysis of groundwater flow through discontinuity network was performed around underground oil storage cavern which is now under construction. The probabilistic density functions(P.D.F) were obtained from the investigation of the discontinuity trace map. When the anisotropic hydraulic conductivity is used, the flow rate into the cavern was below the acceptable value to maintain the hydraulic containment. But when the isotropic hydraulic conductivity is used, the flow rate was above the acceptable value.

  • PDF

Environmental Change of Groundwater due to Urbanization (도시화(都市化)에 의한 지하수환경(地下水環境)의 변화(變化))

  • KIM, Su Won;BAE, Sang Keun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 1996
  • To evaluate the change of the groundwater flow and the water table response resulting from urbanization, two cases of the transient three-dimensional numerical simulations were performed. Variations of the groundwater flow system caused by withdrawals were analyzed. Two cases of infiltration rates were applied in this study to verify the water table changes. One is the rate under the circumstance during 1994 and the other is the revised rate. The numerical results from this study indicated that groundwater flow was influenced by human impacts. Groundwater flow has been concentrated to Taegu Textile Complex area where had large amount of pumping. Water table so far decreased -2.76m a year due to withdrawals. Water tables of many points were increased more than 30cm when the surface was reformed by infiltrating the rainfall. It was appeared that the improvement of surface to recharge the precipitation was very important to preserve and manage for the groundwater.

  • PDF

Assessment of groundwater inflow rate into a tunnel considering groundwater level drawdown and permeability reduction with depth (터널굴착 중 지하수위 강하 및 깊이별 투수계수 변화를 적용한 지하수 유입량 변화 분석)

  • Moon, Joon-Shik;Zheng, An-Qi;Jang, Seoyong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.109-120
    • /
    • 2017
  • Groundwater seepage into a tunnel is one of the main causes triggering tunnel collapse and the consequent ground subsidence. Thus, it is important to estimate adequately the groundwater inflow rate and porewater pressure change during tunneling with time elapse. In current practice, Goodman's analytical solution (or image tunnel method) assuming homogeneous ground condition around a tunnel is commonly used for estimating groundwater inflow rate. However, the generally-used analytical solution for estimating groundwater inflow rate does not consider groundwater level drawdown and permeability change with depth, and the inflow rate can be overestimated in design phase. In this study, parametric study was performed in order to investigate the effect of groundwater level drawdown and permeability reduction with depth, and transient flow analysis was carried out for studying the inflow rate change as well as groundwater level and porewater pressure change around a tunnel with time elapse.

Estimation of Groundwater Flow Rate into Jikri Tunnel Using Groundwater Fluctuation Data and Modeling (지하수 변동자료와 모델링을 이용한 직리터널의 지하수 유출량 평가)

  • Lee, Jeong-Hwan;Hamm, Se-Yeong;Cheong, Jae-Yeol;Jeong, Jae-Hyeong;Kim, Nam-Hoon;Kim, Ki-Seok;Jeon, Hang-Tak
    • Journal of Soil and Groundwater Environment
    • /
    • v.14 no.5
    • /
    • pp.29-40
    • /
    • 2009
  • In general, understanding groundwater flow in fractured bedrock is critical during tunnel and underground cavern construction. In that case, borehole data may be useful to examine groundwater flow properties of the fractured bedrock from pre-excavation until completion stages, yet sufficient borehole data is not often available to acquire. This study evaluated groundwater discharge rate into Jikri tunnel in Gyeonggi province using hydraulic parameters, groundwater level data in the later stage of tunneling, national groundwater monitoring network data, and electrical resistivity survey data. Groundwater flow rate into the tunnel by means of analytical method was estimated $7.12-74.4\;m^3/day/m$ while the groundwater flow rate was determined as $64.8\;m^3/day/m$ by means of numerical modeling. The estimated values provided by the numerical modeling may be more logical than those of the analytical method because the numerical modeling could take into account spatial variation of hydraulic parameters that was not possible by using the analytical method. Transient modeling for a period of one year from the tunnel completion resulted in the recovery of pre-excavation groundwater level.

Modeling on the Prediction of Flow Rate and Groundwater Level Drawdown Associated with Tunnel Excation in Fractured rock (단열암반내 터널 굴착에 따른 지하수유출 및 주변지역의 지하수위 하강예측 모델링)

  • Lee Byeong-Dae;Sung Ig-Hwan;Jeong Chan-Ho;Kim Yong-Je
    • The Journal of Engineering Geology
    • /
    • v.15 no.3
    • /
    • pp.289-301
    • /
    • 2005
  • Groundwater level drawdown of the first stage resulted from groundwater leakage into tunnel was predicted by an analytical approximation. And numerical modeling was performed to predict the flow rates into tunnel and the groundwater level decline in the vicinity of future proposed tunnel area using a groundwater flow model MODFLOW. Groundwater level of the first stage was predicted to decrease by 15.3 m in analytical approximation. The flow rates in the total length of the future tunnel, when it is excavated, would be approximately $1,870m^3/day$ in numerical model. The model predicts that the groundwater levels in the area around the future tunnel are expected to drop between 5 to 25 m relative to current groundwater levels. Under condition for a $50\%$ tunnel conductance increase, the flow rate was estimated to be $2,518m^3/day$ and the groundwater level drawdown was predicted to be between 5 to 35 m The flow rate and the predicted groundwater level drawdown under a $2,518m^3/day$ tunnel conductance decrease was estimated to be $1,273m^3/day$ and between 2 to 12 m.

Transient Groundwater Flow Modeling in Coastal Aquifer

  • Li Eun-Hee;Hyun Yun-Jung;Lee Kang-Kun;Park Byoung-Won
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2006.04a
    • /
    • pp.293-297
    • /
    • 2006
  • Submarine groundwater discharge (SGD) and the interface between seawater and freshwater in an unconfined coastal aquifer was evaluated by numerical modeling. A two-dimensional vertical cross section of the aquifer was constructed. Coupled flow and salinity transport modeling were peformed by using a numerical code FEFLOW In this study, we investigated the changes in groundwater flow and salinity transport in coastal aquifer with hydraulic condition such as the magnitude of recharge flux, hydraulic conductivity. Especially, transient simulation considering tidal effect and seasonal change of recharge rate was simulated to compare the difference between quasi-steady state and transient state. Results show that SGD flux is in proportion to the recharge rate and hydraulic conductivity, and the interface between the seawater and the freshwater shows somewhat retreat toward the seaside as recharge flux increases. Considered tidal effect, SGD flux and flow directions are affected by continuous change of the sea level and the interface shows more dispersed pattern affected by velocity variation. The cases which represent variable daily recharge rate instead of annual average value also shows remarkably different result from the quasi-steady case, implying the importance of transient state simulation.

  • PDF

Discontinuous Fracture Characteristics and Fractal Dimensions of Groundwater Flow Section in Youngchun Waterway Tunnel (영천댐 도수로터널내 지하수 유출구간의 불연속성 단열 특성 및 단열 프랙탈 차원)

  • 이병대;추창오;이인호;정교철;함세영;조병욱
    • The Journal of Engineering Geology
    • /
    • v.12 no.3
    • /
    • pp.333-344
    • /
    • 2002
  • To clarify the relationship between groundwater flow tate and statistical distribution of fractures in Youngchun waterway tunnel, the fracture characteristics and fractal dimensions of groundwater flow section were evaluated. The flow rate of 84,465m$^3$/day was identified in fault, accounting for about 70 percent of the total How rate. The flow rate of 36,525m$^3$/day was identified in joint, accounting for about 30 percent of the total flow rate. The flow late in the NATM section of sedimentary rocks increased with the fractal dimensions. The fractal dimensions determined in fault or fracture zones show more positive relation with the flow rate than those in joint developed zones.

Evaluation of Groundwater Flow by Gravel-Filling and Temporary Drainage in Groundwater-saturated Limestone Mine Cavities (지하수 포화 석회석 채굴공동에서의 골재 충전 및 임시배수시 발생하는 지하수 유동 평가)

  • Choi, Woo-Seok;Kang, Byung-Chun;Kim, Eun-Sup;Shin, Dong-Choon
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.205-216
    • /
    • 2017
  • Fluctuations in groundwater level are the major cause of ground subsidence in the abandoned limestone mine. In this study, evaluation of groundwater flow under three different cases of natural condition, aggregate-filling, temporary drainage in groundwater-saturated limestone mine cavities was executed by 3-dimensional analysis. In the case of aggregate-filling, although the water level both in the upper ground of mine cavities and an agricultural watershed was elevated, it was lower than the water level fluctuation of an agricultural water use and rainfall and the flow rate was similar to the flow rate of natural condition. In the case of temporary drainage, as the water level in the upper ground of mine cavities and an agricultural watershed decrease rapidly and the flow rate has increased by 25times, so the risk of ground subsidence increased.