• Title/Summary/Keyword: Ground surface displacement

Search Result 244, Processing Time 0.02 seconds

The Lateral Load Capacity of Bored-Precast Pile Depending on Injecting Ratio of Cement Milk in Sand (사질토 지반에서 시멘트밀크 주입비에 따른 매입말뚝의 수평지지력)

  • Hong, Won-Pyo;Yun, Jung-Mann
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.4
    • /
    • pp.99-107
    • /
    • 2013
  • In order to investigation Lateral bearing capacity of bored-precast pile, we carried out the analysis of the relationship between Lateral load and horizontal displacement using the result of horizontal pile load test. The six piles injected cement milk of 50%, 70% and 100% of the embedded length of pile were used in the horizontal pile load test. The horizontal displacement, yielding load and horizontal bearing capacity are mainly affected by The injecting ratio of cement milk (injected length of cement milk/embedded length of pile). As the injecting ratio of cement milt is increased, the starting point of horizontal displacement in piles become close to the ground surface and the amount of horizontal displacement is decreased. Also, the horizontal bearing capacity and yielding load are highly increased with increasing the ration of cement milk. The horizontal bearing capacity and yielding load of bored pile with 1 of cement milk ratio are about two or three times those of pile with 0.5 of cement milk ratio.

Application of Digital Image Correlation Method for Measurement of Rock Pillar Displacement and Vibration Due to Underground Mine Blasting (지하 광산발파에 따른 암반광주의 변위 및 진동 측정을 위한 이미지 영상 상관법 적용연구)

  • Ko, Young-Hun;Seo, Seung-Hwan;Lim, Hyun-Sung;Jin, Tai-Lie;Chung, Moon-Kyung
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.1-9
    • /
    • 2019
  • In this study the applicability of a Digital Image Correlation (DIC) method was investigated by measuring the displacement and vibration of rock pillar due to underground mining blasting. When combined with a high speed photography technology, the DIC method provides an excellent photographic image processing ability that can be used to convert the evolving full-field surface properties of structures to 2D or 3D set of coordinate values. The measured coordinate sets are then used to calculate the displacement, strain, and velocity of the target structure. This technique is widely used in science and engineering, and continuously finds its new application areas. In this study, the DIC system and the conventional seismograph were compared for their ability to measure the displacement and vibration produced by blasting. In the field test both methods showed similar results. Thus, it is concluded that the DIC method is feasible to measure the ground displacements and vibrations from blasting.

Behavior of Soft Ground Treated with Sand Compaction Piles and Sheet Piles (모래다짐말뚝과 널말뚝으로 처리된 연약점토지반의 거동)

  • Yoo, Nam-Jae;Jeong, Gil-Soo;Park, Byung-Soo;Kim, Kyung-Soo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.93-99
    • /
    • 2006
  • Centrifuge model experiments were performed to investigate the confining effects of the sheet piles, installed to the sides of soft clay ground treated with sand compaction piles, on the bearing capacity and concentration ratio of composite ground. For the given g-level in the centrifuge model tests, replacement ratio of SCP and the width of surcharge loads on the surface of ground with SCP, the confining effects of installing the sheet piles on the edges of SCP ground on the bearing capacity, change of stress concentration ratio and failure mechanism were investigated. Kaolin, one of typical clay mineral, and Jumunjin standard sand were used as a soft clay ground and sand compaction pile irrespectively. As results of experiments, lateral confining effect by inserting the model sheet piles fixed to the loading plate was observed. For the strip surcharge loading condition, the yielding stress intensity in the form of the strip surcharge loads tends to increase with increasing the embedded depth of sheet piles. The stress concentration ratio was found not to be influenced consistently with the embedded depth of sheet piles whereas the effect of stress intensity on stress concentration ratio shows the general trend that values of stress concentration ratio are relatively high at the initial stage of loading and tend to decrease and converge to the certain values. For the failure mechanism in the case of reinforced with sheet piles, displacement behavior related to the punching failure, settlement right beneath the loading plate occurred since the soil was confined with sheet piles, was observed.

  • PDF

Behavior of Soft Ground Improved with Fully-Partly Penetrated Sand Compaction Piles (관통-미관통 모래다짐말뚝으로 개량된 연약지반의 거동)

  • Jeong, Geunchae;Heo, Yol;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.9
    • /
    • pp.91-99
    • /
    • 2012
  • This study describes the investigation based on centrifuge model tests for the clay ground improved by sand compaction pile. In order to clarify the failure behavior of composite ground improved by partly and fully penetrated SCPs. And, in order to compare the effect of the penetration ratio and the replacement area ratio, nine of the centrifuge tests were carried out. From the test results, settlement reduce ratio in the fully penetrated SCPs ground is bigger than that in the partly penetrated SCPs ground. It is also evaluated that angle of the failure of composite ground improved by SCP are 26, 25, $34^{\circ}$ for As=10%, 22, $29^{\circ}$ for As=30%. And as a result of rigid loading tests, surface displacement decreases linearly with the partly penetration ratio increased.

Analysis of the Applicability of Ground Stabilizer Using Recycled Resources as Prebored Piles (매입말뚝 주면고정액으로 순환자원을 재활용한 지반안정재의 활용 가능성 분석)

  • Seo, Se-Gwan;Song, Sang-Huwon;Cho, Dae-Sung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.3
    • /
    • pp.287-294
    • /
    • 2021
  • In this study, tests were performed to analyze the feasibility of using the ground stabilizer from recycled resources such as blast furnace slag powder as filling material of prebored piles. For this, specimens were prepared by applying 70% and 83% of the general water/binder ratio of the filling material of prebored piles. And compression test, model test, and shaking table test were performed to determine the compressive strength, skin friction on the surface between prebored pile and filling material, and seismic performance of ground stabilizer. As a result of the tests, the compressive strength exceeded the relevant domestic standards, and the skin friction was equivalent to that of ordinary portland cement. In addition, the amount of vertical and horizontal displacement caused by earthquakes was found to be much smaller than the domestic standard. Therefore, when considering the test results comprehensively, it is judged that the feasibility of using a ground stabilizer from recycled resources as filling material for prebored pile is sufficient.

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법)

  • Chun, Byung-Sik;Song, Seung-Hoon;An, Jung-Whan
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.87-95
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analyses of failure rate and vertical stress ratio show that the tunnel for which the height of the cover (H) was higher than four times the diameter, can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than that obtained by Ring-cut split method. In addition, the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

Slope Behavior Analysis Using the Measurement of Underground Displacement and Volumetric Water Content (지중 변위와 체적 함수비 계측을 통한 사면 거동 분석)

  • Kim, Yongseong;Kim, Manil;Bibek, Tamang;Jin, Jihuan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.9
    • /
    • pp.29-36
    • /
    • 2018
  • Several studies have been conducted on monitoring system and automatic measuring instruments to prevent slope failure in advance in Korea and overseas. However, these studies have quite complex structure. Since most of the measurement systems are installed on the slope surface, the researches are carried on the measurement system that detects sign of slope collapse in advance and alerts are still unsatisfactory. In this study, slope collapse experiments were carried out to understand the slope failure mechanism according to rainfall conditions. The water content and displacement behavior at the early stage of the slope failure were analyzed through the measurement of the ground displacement and water content. The results of this study can be used by local government as a basic data for the design of slope failure alarm system to evacuate residents in case of slope failure or landslide due to heavy rainfall.

Optimum Reinforcement Conditions of Large Diameter Reinforcement for Steep Slope of Conventional Railway Embankment under Train Loading (기존선 성토사면 급구배화를 위한 열차 하중 하 대구경 봉상보강재의 최적 보강조건)

  • Kwak, Chang-Won;Kim, Dae-Sang
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.43-50
    • /
    • 2016
  • A reinforcement is required to ensure the structural safety in case of railway embankment excavation under railway load. A large diameter soil nailing with concrete wall is applied as the reinforcement method instead of the conventional soil nailing system. In this study, a series of 3 dimensional numerical analyses are performed to investigate the optimum reinforcement considering 15 different conditions based on the length, lateral spacing, diameter, and inclination of the reinforcement. The interface between soil nail and perimetric grout is considered by means of cohesion, stiffness and perimeter of the grout. 0.3 m of reinforcement diameter is assessed as the most appropriate based on the economical viewpoint though ground displacement decreases with the increase of diameter, however the difference of displacement is negligible between 0.4 m and 0.3 m of diameter. Surface settlement, lateral displacement of wall, and stress of reinforcement are calculated and economic viewpoint to reinforce embankment considered. Consequently, the optimum reinforcement conditions considering those factors are evaluated as 3 m in length, 0.3 m in diameter, 1.5 m in lateral spacing, and 10 degree of inclination angle in the case of 3 m of excavation depth. Additionally, inclined potential failure surface occurs with approximately 60 degrees from the end of nails and the surface settlement and wall lateral displacement are restrained successfully by the large diameter soil nailing, based on the result of shear strain rate.

The Deformation Behavior of Anchored Retention Walls installed in Cut Slope (절개사면에 설치된 앵커지지 합벽식 옹벽의 변형거동)

  • Yun, Jung-Mann;Song, Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.475-482
    • /
    • 2009
  • The behavior of earth retention wall installed in cut slope is different from the behavior of retention wall applied in urban excavation. In order to establish the design method of anchored retention walls in cut slope, the behavior of anchored retention wall can be investigated and checked in detail. In this study, the behavior of anchored retention wall was investigated by instrumentation installed in cut slope for an apartment construction stabilized by a row of piles. The horizontal displacement of anchored retention wall was larger than the displacement of slope soil behind the wall at the early stage of excavation. As the excavation depth became deeper, the horizontal displacement of slope soil was larger than the displacement of anchored retention wall. It means that the horizontal displacement of anchored retention wall due to excavation is restrained by soldier pile stiffness and jacking force of anchor. Jacking force of anchor was mainly influenced in the horizontal displacement of anchored retention wall. The displacements of anchored retention wall and slope soil were affected mainly by an rainfall infiltrated from the ground surface. Meanwhile, the horizontal displacement of anchored retention wall with slope backside was about 2-6 times larger than the displacement of anchored retention wall with horizontal backside of excavation.

The Deformation Behavior of Anchored Retention Walls in Cut Slope (절개사면에 설치된 앵커지지 흙막이벽의 변형거동)

  • Song Young-Suk;Lee Jae-Ho;Kim Tae-Hyung
    • The Journal of Engineering Geology
    • /
    • v.15 no.2 s.42
    • /
    • pp.155-168
    • /
    • 2005
  • The behavior of earth retention wall installed in a cut slope is different from the behavior of retention wall applied in an urban excavation. In order to establish the design method of anchored retention wall in the cut slope, the behavior of anchored retention wall needs to be investigated and checked in detail. In this study, the behavior of anchored retention wall was investigated by the instrumentation installed in the cut slope, where was stabilized by a row of piles in an apartment construction site. The horizontal displacement of anchored retention wall was larger than the displacement of slope soil behind the wall at the early stage of excavation. As the excavation depth became deeper, the horizontal displacement of slope soil was larger than the displacement of anchored retention wall. It means that the horizontal displacement of anchored retention wall due to excavation is restrained by soldier pile stiffness and jacking force of anchor at the early stage of excavation. lacking force of anchor was mainly influenced on the horizontal displacement of anchored retention wall. The displacements of anchored retention wall and slope soil were affected mainly by rainfall infiltrated from the ground surface. Meanwhile, the horizontal displacement of anchored retention wall with a sloped backside was about $2\~6$ times larger than the displacement of anchored retention wall with a horizontal backside of excavation.