• Title/Summary/Keyword: Ground plan

Search Result 568, Processing Time 0.043 seconds

PCB에서 Resonance Frequency 영향을 고려한 최적 VIA 수 찾는 Algorithm 구현

  • Lee, Sang-Gyeong;Kim, Yeong-Gil
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2011.05a
    • /
    • pp.329-332
    • /
    • 2011
  • 최근 사용하는 정보량의 증가로 인해 디지털 회로가 점점 고속, 소형 집적화를 요구로 인해 인쇄회로 기판 역시 높은 신뢰성과 소형화가 요구되어 지고 있다. 특히 POWER PLAN / GROUND PLAN 간 임피던스 영향, 주파수 영향을 고려하여 GROUND / POWER VIA를 통해 개선하고 있으나 너무 많은 VIA가 사용되어 PCB 제조업체 입장에서는 단가 상승 및 납기 지연, 불량요인이 지속적으로 증가하고 있다. 하여 본 논문에서는 VIA 개체수 최적화를 검증 하기 위하여 정형화된 PCB구조의 기본 Design을 활용하여 POWER PLAN과 GROUND PLAN 사이에 VIA의 특정 개수에서 IMPEDANCE값이 수렴하는 것을 검증하여 최적화된 VIA개수를 찾아 보았다.

  • PDF

Rational high-speed railway plan for passing through metropolis (고속철도의 합리적인 광역도시 통과방안)

  • Ahn Yong-Mo;Kim Hong-Yeoun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.144-150
    • /
    • 2005
  • After the historic opening of the first section of KTX(Korea Train eXpress), it has been made changes three times in a plan to pass through cities of Daejeon, Daegu in the construction of the high speed train's second section(underground${\to}$ on ground${\to}$ under ground${\to}$ on ground). Thereafter, it has been repeatedly argued that the plan to pass through underground caused many problems such as prevention of an accident in tunnel, the difficulty of maintainence, the disadvantage of passengers' moving line. Thus construction on ground plan is coming up again with relation to the interest among local people. There have been lots of national budget loss, construction period delay in this project and people hardly trust policies about national project and nor do engineers. It will be presented that the railway line which is accorded with the characteristics of region, an agreement with local communities about national project, the reasonable procedure to determine how to pass through cities, resolve the conflict among neighborhood, and the role of engineers.

  • PDF

Proposed optimal fishing-ground plan to increase productivity in the Ki-jang coastal region of Busan, Korea (양식어장 생산성 향상을 위한 적정배치방안-부산 기장연안을 중심으로-)

  • Yoon, Han-Sam;Kim, Heon-Tae;Ryu, Cheong-Ro;Kim, Young-Po
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.17 no.3
    • /
    • pp.361-372
    • /
    • 2005
  • The purpose of this paper was to examine the status of unlawful actions in the fishing grounds located in the Ki-jang coastal region of Busan, Korea, and to develop an optimal fishing-ground plan that will increase the productivity of fisheries resources. We examined the impacts of important factors influencing the basic environment of the fishing grounds at the study site, as including the physical environmental conditions of water temperature and qualies. In addition, we administered a survey that focused on the necessity of enhanced maintenance of the fishing grounds at this site. As a result, we identified some required management action for the fishing grounds and proposed an optimal fishing-ground plan to increase productivity in the Ki-jang coastal region of Busan.

Design of Ground Station System for CubeSat STEP Cube Lab. (큐브위성 STEP Cube Lab.의 지상국 시스템 설계)

  • Jeon, Younghyeon;Chae, Bonggeon;Jeong, Hyeonmo;Jeon, Seongyong;Oh, Hyunung
    • Journal of Aerospace System Engineering
    • /
    • v.6 no.4
    • /
    • pp.34-39
    • /
    • 2012
  • CubeSats classified as pico-class satellite require a ground station to track the satellite, transmit a command, and receive an on-orbit data such as SOH (State-of-Health) and mission data according to the operation plan. For this, ground station system has to be properly designed to perform a communication to with the satellite with enough up- and down-link budgets. In this study, a conceptual design of the ground station has been performed for the CubeSat named as STEP Cube Lab. (Cube Laboratory for Space Technology Experimental Project). The paper includes a ground station hardware interface design, link budget analysis and a ground station software realization. In addition, the operation plan of the ground station has been established considering the STEP Cube Lab. mission requirements.

Study on Improvement Plan of System through Analysis of Ground Sink Accidents - Focused on the management of underground facilities and their surrounding ground - (지반함몰 사고 분석을 통한 제도 개선안 연구 - 지하시설물 및 주변지반 관리 중심으로 -)

  • Kim, Dong-jin;Lee, Jong-keun;Kim, Hong-kyoon;No, Tae-kil
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.3 no.1
    • /
    • pp.18-24
    • /
    • 2020
  • The purpose of this study is to propose a system improvement plan to prevent ground sinking accidents. To do this, follow the procedure below. First, it defines terms that are used interchangeably, such as ground subsidence and ground depression. Second, analysis of the current status and cause of ground sink, and the analysis of the correlation between rainfall and ground sink causes, derives priority management causes. Third, we propose a system improvement plan for the cause of priority management. As a result, damage to underground pipes and inadequate underground works were identified as the cause of priority management, and two system improvement plans to manage them were proposed. The results of this study can be used as basic data for improving the system for more effective prevention of underground sink in the future.

A Study on the Landscape Planning Evaluation on Apartment Artificial Ground (아파트 단지 인공지반의 계획적 평가에 관한 연구)

  • 김유일;오정학;김인혜;윤홍범
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.3
    • /
    • pp.297-311
    • /
    • 1998
  • Landscaping on artificial ground is currently served as a means to imposing a greenery benefit on high-density and high-rise apartment sites. It functions as a sub-hierarchy in apartment planning such as ornamental element from the past. Major parking space tends to be allocated on the basement area in response to the required parking regulation. Therefore, competitive relatioinship between the parking and greenery space I limited outdoor of apartments leads to the development planning strategy and technology of artificial ground. This study aims at evaluating landscape planning on artificial ground of apartment complex through several approaches such as site survey, plan drawing analysis, and interview with related field experts. 15 survey apartment sites including Bundang Model, Shindaebang-dong, Pyoungchon Hyundai Apartments have been selected for conducting the research. Main results of this study are summarized below : First, scattering allocation of artificial ground between apartment building units is a dominant plan layout type among the survey sites. Even though unifying allocation type has an advantage to maximize underground parking space, it has a difficulty in maintaining proper soil ground base for nurturing plants. Therefore, underground parking space should be planned by unifying allocation type placed separately from apartment units. This plan type can provide a balanced planting between soil and artificial ground on surface level. Second, It is strongly recommended to integrate the whole planting base which involves architectural structure, drainage, and water proofing above the planting design. When considering that process as a professional subject dealing with natural material such as trees and shrubs, those tasks should be directed by landscape architectural divison and landscape architect. And planting area for artificial ground has to be specified in initial phase of architectural design. This step provides an opportunity to make a proper decision on structural load, drainage, and water proof design as an integrated part of the management.

  • PDF

An Effective Threat Evaluation Algorithm for Multiple Ground Targets in Multi-target and Multi-weapon Environments

  • Yoon, Moonhyung;Park, Junho;Yi, Jeonghoon
    • International Journal of Contents
    • /
    • v.15 no.1
    • /
    • pp.32-38
    • /
    • 2019
  • In an environment where a large number of weapons are operated compared to a large number of ground targets, it is important to monitor and manage the targets to set up a fire plan, and through their multilateral analysis, to equip them with a priority order process for targets having a high threat level through the quantitative calculation of the threat level. Existing studies consider the anti-aircraft and anti-ship targets only, hence, it is impossible to apply the existing algorithm to ground weapon system development. Therefore, we proposed an effective threat evaluation algorithm for multiple ground targets in multi-target and multi-weapon environments. Our algorithm optimizes to multiple ground targets by use of unique ground target features such as proximity degree, sorts of weapons and protected assets, target types, relative importance of the weapons and protected assets, etc. Therefore, it is possible to maximize an engagement effect by deducing an effective threat evaluation model by considering the characteristics of ground targets comprehensively. We carried out performance evaluation and verification through simulations and visualizations, and confirmed high utility and effect of our algorithm.

A Study on Automation of Image Collection Planning

  • Han, Jae-Joong;Jung, Kyung-Jin;Choi, Jae-Seung;Kwak, Sung-Hee;Kim, Moong-Yu
    • Korean Journal of Remote Sensing
    • /
    • v.27 no.6
    • /
    • pp.743-752
    • /
    • 2011
  • One of main concerns of operators of the Earth observation satellite is taking images as many as possible under the constraints of satellite resources during fixed period. In order to achieve this goal, satellite operators are strongly required to generate the optimized image collection plans, and it is a very time consuming process to achieve an optimized image collection plan when it is done by manual. This paper suggests automation of image collection planning based on the dynamic programming algorithm to reduce the time required for image collection planning. The validity of the proposed method is tested using operating satellite system and the result is given in this paper.

To examine the construction plan of the lightening rod equipment for the intake tower of D-dam (D댐의 취수탑 피뢰설비 구축방안 검토)

  • Hong, Sung-Taek;Lee, Eun-Chun;Shin, Gang-Wook;Lee, Nam-Young
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.290-292
    • /
    • 2003
  • The intake tower of D-dam located in a mountainous area positioned in the left side of the dam and its structure installed alone on the water surface then, can become target of direct lightening. To protect the intake tower from the direct lightening and indirect-lightening, lightening rod installed in the top area of the intake tower and ground pole laid under the surrounding ground. however, because the surrounding ground almost consists of a rock, it is very difficult to obtain the grounding resistance. It is main object to examine the construction plan of the optimum lightening rod equipment and ground pole with measuring the earth specific resistance of the around of the intake tower which is the scheduled area to lay the ground pole with the Wenner's 4-electric pole method and the Schlumberger's method. and using the analysis tool, ESII.

  • PDF

To examine the construction plan of the lightening rod equipment for the J-booster pumping station in and around KEPCO'a high voltage distribution power line (한전 배전선로 주변에 위치한 J가압장의 피뢰설비 구축방안 검토)

  • Hong, Sung-Taek;Lee, Eun-Chun;Shin, Gang-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.293-295
    • /
    • 2003
  • KEPCO's high voltage distribution power line laid under the ground near to the J-booster pumping station that supply water for living. Lightening rod equipment does not installed at the J-booster pumping station because KEPCO's over head ground wire for protection functions as a lightening rod equipment. In this study, it is concerned whether KEPCO's over head ground wire for protect the distribution power line affect to the J-booster pumping station which is installed for reduce the damage from the direct and indirect lightening. If KEPCO's protection area does not affect to the J-pumping station, it is plan to examine the construction method of lightening rod protection angle and lightening rod equipment and to suggest the optimum protection plan using the surrounding structure based on the suitability of protection area.

  • PDF