In this paper, we simulated transient-state under fault in stator windings of synchronous generator. The fault types are line to ground fault, line to line short fault, and three phase short fault. For fault analysis of generator system, the voltage equation of a synchronous machine using the two-axis theory was used. It can be used to analyze important features of faults and to develop enhanced protection methods.
KIEE International Transactions on Power Engineering
/
제3A권2호
/
pp.79-84
/
2003
Unbalanced systems, such as distribution systems, have difficulties in fault locations due to single-phase laterals and loads. This paper proposes new fault locations developed by the direct three-phase circuit analysis algorithms using matrix inverse lemma for the line-to-ground fault case and the line-to-line fault case in unbalanced systems. The fault location for balanced systems has been studied using the current distribution factor, by a conventional symmetrical transformation, but that for unbalanced systems has not been investigated due to their high complexity. The proposed algorithms overcome the limit of the conventional algorithm using the conventional symmetrical transformation, which requires the balanced system and are applicable to any power system but are particularly useful for unbalanced distribution systems. Their effectiveness has been proven through many EMTP simulations.
This paper is to demonstrate the effectiveness of one point grounding in support of ESS protection. One point grounding provides for the dispatching of excess energy for protection of switching equipment and personnel from lightning discharge hazards and for a natural sink for noise from atmospheric lightning and power transients. In most ESS installations there are a number of different items that must be maintained at a common ground potential for safety, fault protection or noise reduction. The items typically consist of power systems, heating and ventilating systems, distributing frames, repeating equipmets, switching equipments, etc. Grounding system of an ESS Office is most effective when all the ground points are connected to a single, common earth. The one point grounding prvides a common reference potential, keeping all the items of telecommunications facility free from the earth current and voltage hazards.
Recently, the Korea National Railways (KNR) is undertaking a program of electrification of the existing railway routes. In order to implement the ongoing plan, KNR authorized a preliminary engineering study of its electrical systems. This effort included a comprehensive analysis of new grounding networks. The new grounding system runs in parallel with the rails and is connected to all metal structures such as rails, overhead protection wires and substation grounding grids etc., creating an equipotential ground network. This paper presents a study on coupling levels that can disturb signaling and telecommunications in adoption of the new grounding network The simulation for the study is carried out using Matlab software, Several different scenarios are analyzed, including the load condition and a few fault conditions with different fault locations. The induced potentials on the communication cables are computed. The effect of the buried ground wires is also analyzed by comparing the results with and without the presence of the ground wires, The results presented in the paper can be used as a reference for estimating coupling levels in similar rail systems.
This paper describes a study of transient characteristics in 765kV untransposed transmission lines. As the 765(kV) system can carry bulk power, some severe fault on the system nay cause large system disturbance. The large shunt capacitance and small resistance of 765kv transmission line make various difficulties for its protection. These problems including current difference between sending and receiving terminals on normal power flow, low order harmonic current component in fault current and current transformer saturation due to the long DC time constant of the circuit etc. must be investigated and solved. The analysis of transient characteristics at sending terminal has been carried out for the single phase to ground fault and 3-phase short fault, etc. The load current, charging current in normal condition and line flows, fault current, THD(Total Harmonic Distortion) of harmonics, time constants have been analysed for the 765kV untransposed transmission line systems.
This paper reviews the energy characteristics of oil filled cables in transient state such as grounding fault and lightning surge. Artificial grounding fault test was firstly performed in 2003 for the analysis of arc voltage and breakdown energy according to the fault current. In this paper, energy of OF cable is variously analysed at joint box based on the actual test. Then more various conditions such as installation types, section lengths and CCPU(Cable Covering Protection Unit) connection types are applied for the simulation using EMTP when the single line to ground fault and direct lightning stroke are occurred on actual underground power cable systems and combined power cable systems, respectively. Finally, the energy by the length of crossbonded lead and grounding lead as well as fault lasting time is also calculated using EMTP simulation.
최근 신재생에너지 및 분산전원의 급속한 보급과 직류부하의 증가로 인하여 직류급전에 대한 관심이 높아지고 있으며, 이에 대한 보호협조방식에 대한 연구가 활발히 이루어지고 있다. 그러나 직류급전방식을 사용하는 기존의 직류 부하망과 도시철도 등은 비접지방식인 IT 접지 시스템으로서 지락고장발생 시 고장전류의 경로가 없고, 정상상태 전류에 비하여 큰 차이가 발생하지 않기 때문에 지락고장검출이 어려운 실정이다. 따라서 본 논문에서는 절연저항측정장치(IMD : Insulation Monitoring Device)를 직류 비접지계통의 보호기기로 활용하기 위하여, IMD의 검출원리를 정식화한다. 이를 바탕으로 IMD의 신호주입방식에 의한 출력 값을 웨이블릿변환기법으로 분석하여, 사고검출을 신속하고, 정확하게 판단할 수 있는 검출알고리즘을 제안한다. 또한, 상용전력 계통해석프로그램인 PSCAD/EMTDC를 이용하여, 직류 비접지계통과 IMD를 모델링하고, MATLAB을 이용한 웨이블릿변환 수치해석모델링을 수행한다. 이를 바탕으로 직류 비접지계통의 지락사고를 해석한 결과, 본 논문에서 제안한 IMD의 사고검출 알고리즘의 유효성을 확인하였다.
IEC 60364-4-44 provides rules for the protection against the effects of conducted and radiated disturbances on electrical installations. Especially this standards deals with the protection of low voltage facility against the ground fault in the high voltage side of power distribution system. Many countries defines the regulations on the use and production of electrical facilities based on their own power system and technical references which are considered to be suitable for themselves. The background of circuit of IEC 60364 is based on the ungrounded system as most of European countries adopt. However, since domestic ground system is multi-grounding system different from European system, it is necessary to evaluate or prove the effect of the IEC 60364 for introducing and applying it to the domestic grounding system as a Korean standard. This paper presents the establishment of test field to get background data to introduce the IEC 60364 and to evaluate the standard is applicable or not to domestic rule for the protection against ground fault through the related test.
This paper present a variety fault problem brought out with the multifunctional Battery Energy Storage System [MBESS] expected to be practical in the short future interconnected to power distribution system. Multifunctional BESS model and interconnection model to power system is simply configured, the problems of protection coordination and operation is studied. A line fault in the power distribution system are discussed such as line to ground and three phase fault in order to show the impact on power utilities, demand-side and BESS-side. In order to simulate a variable transient phenomenon due to 2 the BESS interconnection operation to power distribution system, in this paper, PSCAD/EMTDC simulation tools is used.
본 논문은 CD형 초전도 케이블을 22.9kV 다중접지 배전계통에 적용한 경우 불평형 지락 고장이 초전도 케이블에 미치는 영향을 검토하고 이로 인한 중성선 전류의 변화 및 계통보호를 위한 대책을 논한다. 3상 CD형 초전도 케이블을 사용하는 경우 귀로선은 전향선과 전류가 반대이면서 거의 동일한 전류가 흐르므로 회로의 인덕턴스를 크게 줄일 수 있지만 이를 위해 회로를 단락하여 운전하는 경우 지락고장시 영상회로가 별도로 존재하지 않으면 지락전류를 저감시키는 결과를 초래하게 되어 계통보호에 영향을 주게 된다. 본 논문은 EMTDC 프로그램을 활용하여 이 현상을 XLPE 케이블 계통과 비교, 모의하는 한편, 정상적인 보호계전기 동작이 가능토록 하는 대책에 대해 논한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.