• Title/Summary/Keyword: Ground Arch

Search Result 128, Processing Time 0.025 seconds

The supporting effect of pipe wing rib designed to achieve early contact between ground and steel arch tunnel support

  • Kinoshita Yasunori;Shinji Masato;Nakagawa Koji;Yamamoto Minoru
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.103-108
    • /
    • 2003
  • In the construction of mountain tunnels, reaction forces of the legs of steel arch supports against the ground are often expected to support the ground being excavated. In these cases, a stress concentration occurs in the ground directly under the support legs. If the bearing capacity of the ground is insufficient or displacement is not effectively constrained, the local failure of the ground under the support legs or settlement of the tunnel supports due to large deformation could result. It is therefore necessary to reinforce the support legs to reduce settlement. As a means of reducing settlement, wing-ribbed steel arch supports are well used. In this study, with the aim of finding a way to quickly reduce the settlement of steel arch support legs, effectiveness of a new type of wing ribs to reinforce steel arch supports was investigated through laboratory testing.

  • PDF

Pillar load and ground deformation in 2-arch tunnel in the jointed rock mass (절리암반에서 2-Arch 터널의 필라하중과 지반변위)

  • Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.91-97
    • /
    • 2007
  • Loads on the pillar and ground deformation in 2-arch tunnel, which is excavated in the rock mass with regular discontinuities, depending on the dips of discontinuities and the construction sequences were experimentally studied. Large scale model tests in the biaxial test facility were performed. Tested model (width 3.3m, height 3.0m, and length 0.45m) for 2-arch tunnel in 1/10 scale were built with various dips. Test results show that discontinuities have greate affects on the behavior of the 2-arch tunnel, especially on the pillar loads and ground deformation.

  • PDF

Three-Dimensional Finite Element Analysis on Tunnel Behaivor Reinforced by Umbrella Arch Method (3차원 유한요소해석에 의한 Umbrella Arch 공법으로 보강된 터널의 거동 해석)

  • 유충식;신승우
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.211-216
    • /
    • 1995
  • In recent years, Natm has been successfully applied to difficult ground conditions with the use of soil-perservention methods which promote face stability and restrict excessive ground movement. When the tunnle excavation od made through difficult ground like highly weathered rock, the umbrella arch method is often adopted which pre-reinforceas tunnel crown periphery using a stiff shell-shaped structure. The umbrella arch method was originally developed in Itali, and has recently been confirmed its effectiveness in Korea as well. However, no in depth study on the umbrella arch method has been conducted ans as a result no rational analysis/design method is available at present. Therefore this study was undertaken with the aim of identifying the basic reinforcing mechanism and satablishing both qualitative and quantiative relationships between various design parameters and ground movements.

  • PDF

On the Proportion of Sungnyemun Arch Related with the Changes of Ground Level (숭례문 지반 높이 변천과 홍예 비례)

  • Jo, Sang-Sun;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.21 no.4
    • /
    • pp.71-79
    • /
    • 2012
  • The purpose of this research is to analyse the changes of ground level of Sungnyemun, the South Gate of Seoul City, and the principles of arch scale through the investigation based on the old records in Joseon dynasty. The result of this research is as follows: 1) The ground level of Sungnyemun, refers the level of foundation stone which was confirmed as original which is verified through the excavation conducted in 2005, maintained 1m's elevated level in 15~16 century and its elevated date presumed in King Sejong's reign(1418~1450). 2) The ground level of Sungnyemun is closely related with the royal funeral ceremony. 3) The width and height scale of Sungnyemun arch is about the ratio of 1 to 1. 4) During the Joseeon dynasty, Sungnyemun was referred as standard of other city wall gate. And it has similar architectural characteristics with Heunginjimun (or East Gate) of Seoul and Hwaseong Janganmun.

A Study on Behavior of 2-Arch Tunnel by Numerical Approach (수치해석적 접근을 통한 2Arch 터널의 거동양상 고찰)

  • 김상균;박동욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.225-232
    • /
    • 2003
  • The behaviour of ground induced by tunneling of 2arch tunnels may differ from the one caused by usual type tunnels. This paper describe the behaviour created by the size of pilot tunnel and the condition on the construction method of center piller Also, loads acting on the supports of the first tunnel and the center pillar during the excavation of second tunnel is investigated by numerical analyses. The results of numerical analyses are compared to the data records of measurement results, i.e. force on the support system and ground displacement.

  • PDF

An experimental study on the load transfer machanism of shallow 2-arch tunnel excavation sequence with vertical discontinuity planes in sandy ground (연직 불연속면이 존재하는 얕은 심도의 사질토 지반에서 2-arch 터널 단계별 굴착에 따른 하중전이에 관한 실험적연구)

  • Oh, Bum-Jin;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.215-231
    • /
    • 2011
  • In this study, the behavior of a shallow 2-arch tunnel during the excavation in the sandy ground containing vertical discontinuity plane was experimentally studied. Load transfer mechanism in the pillar caused by a 2-arch tunnel excavation was observed. The position of the vertical discontinuity plane was varied. Model tests were carried out in the normal construction sequence of 2-arch tunnel. Test results-showed that the load transfer caused by the 2-arch tunnel excavation was concentrated in the discontinuity plane, and was cut by the discontinuity plane, so no load transfer took place above the discontinuity plane. It was also shown that the effect of adjacent tunnel excavation on the pillar load and the ground deformation was greater when excavating the upper half-face of the main tunnel, more than when excavating the lower half-face.

A Study on the Ground Movement around Tunnel Reinforced by Umbralla Arch Method (Umbrella Arch 공법에 의한 터널 천단부 보강시 주변 지반의 거동에 관한 연구)

  • 배규진;김창용;문홍득;훙성완
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.299-309
    • /
    • 1997
  • Soil and rock improvement and reinforcement techniques are applied to achieve safe tunnel excavation in difficult geological conditions. The Umbrella Arch Method(UAM), one of the auxiliary techniques, is used to reduce ground permeability and improve stabtility of the tunnel by inserting a series of steel pipes into ground around the crown inclined to the longitudinal axis of the tunnel. Additionally, multi-step grouting is added through the steel pipes. UAM combines the advantages of a modern forepoling system with the grouting injection method. This technique has been applied in subway, road and utility tunneling sites for the last few years in Korea. This paper presents the results of analysis of the case studies on ground movements associated with UAM used in the Seoul Subway line 5 constructon site. Improvement of tunnel stability and decrease of ground settlement expected with pipe insertion are also discussed. Finally, the method to minimize ground settlements caused by NATM tunnelling are suggested.

  • PDF

Fragility analysis of concrete-filled steel tube arch bridge subjected to near-fault ground motion considering the wave passage effect

  • Liu, Zhen;Zhang, Zhe
    • Smart Structures and Systems
    • /
    • v.19 no.4
    • /
    • pp.415-429
    • /
    • 2017
  • This paper focuses on the impact of the wave passage effect on the long-span bridge. In order to make the wave passage effect more obvious, ground motion samples are selected from the near-fault ground motion of the 1999 Chi-Chi earthquake and an arch bridge with a 280m main span is selected as a bridge sample. The motion ground samples are divided into two groups according to the characteristics of near-fault. A sequence of fragility curves is developed. It is shown that the seismic damage is increased by the wave passage effect and the increase is more obvious in the near-fault ground motion.

Investigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation (2-arch 터널 정거장 굴착 시 평면변형률 조건에서 군말뚝의 이격거리에 따른 지반거동 분석)

  • Kong, Suk-Min;Oh, Dong-Wook;Ahn, Ho-Yeon;Lee, Hyun-Gu;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.535-544
    • /
    • 2016
  • Special tunnel design and construction methods have been suggested due to developments of subway and tunnel. Collapse accidents of tunnel bring enormous damage. So, observation and analysis for the safety of tunnelling and behaviour of surrounding ground are important. But, it is not economical to implement the field test in every time. Therefore, this study has measured ground behaviour due to excavation of 2-arch tunnel station according to offset between grouped pile and tunnel by laboratory model test. For the model test, trapdoor device was adopted. Tunnelling is simulated by volume loss of 2-arch tunnel. Ground displacements are observed by close range photogrammetric method and image processing. In addition, these data are compared with numerical analysis.

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.