• Title/Summary/Keyword: Grid-connected system

Search Result 846, Processing Time 0.037 seconds

Structure and Control of Smart Transformer with Single-Phase Three-Level H-Bridge Cascade Converter for Railway Traction System (Three-Level H-Bridge 컨버터를 이용한 철도차량용 지능형 변압기의 구조 및 제어)

  • Kim, Sungmin;Lee, Seung-Hwan;Kim, Myung-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.617-628
    • /
    • 2016
  • This paper proposes the structure of a smart transformer to improve the performance of the 60Hz main power transformer for rolling stock. The proposed smart transformer is a kind of solid state transformer that consists of semiconductor switching devices and high frequency transformers. This smart transformer would have smaller size than the conventional 60Hz main transformer for rolling stock, making it possible to operate AC electrified track efficiently by power factor control. The proposed structure employs a cascade H-Bridge converter to interface with the high voltage AC single phase grid as the rectifier part. Each H-Bridge converter in the rectifier part is connected by a Dual-Active-Bridge (DAB) converter to generate an isolated low voltage DC output source of the system. Because the AC voltage in the train system is a kind of medium voltage, the number of the modules would be several tens. To control the entire smart transformer, the inner DC voltage of the modules, the AC input current, and the output DC voltage must be controlled instantaneously. In this paper, a control algorithm to operate the proposed structure is suggested and confirmed through computer simulation.

A Study on Output Enhancement Method of PV Array Using Electrical Circuit Reconfiguration Algorithm (전기적 회로절체 알고리즘에 의한 태양광 어레이의 출력향상 방안에 관한 연구)

  • Kim, Byung-Mok;Lee, Hu-Dong;Tae, Dong-Hyun;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.9-17
    • /
    • 2020
  • Recently, RES (renewable energy source) projects have been spreading all over the world as an alternative to solve the shortage of energy and environmental problems caused by fossil fuel consumption. The Korean government also supported the policy and demonstration project to increase the proportion of renewable energy to 63.8[GW] until 2030, which is 20[%] of the total power generation. On the other hand, output loss of a PV array can occur when the surrounding high-rise buildings and trees shade a PV array. Therefore, this paper proposes an algorithm to improve the output loss of a PV array, which electrically changes a circuit configuration of PV modules by wiring and switching devices. Furthermore, this study modeled a PV system based on PSIM S/W, which was composed of a PV array, a circuit configuration device, and a grid-connected inverter. From the simulations results with the modeling and test device, the existing method showed no output when 50% of the shade occurs in PV modules. In contrast, the proposed method could produce the output because the voltage in the PV module could be restored to 246[V], and the operation efficiency of the PV system could be improved by the operation algorithm of the circuit configuration device.

Analysis of Determinants of Carbon Emissions Considering the Electricity Trade Situation of Connected Countries and the Introduction of the Carbon Emission Trading System in Europe (유럽 내 탄소배출권거래제 도입에 따른 연결계통국가들의 전력교역 상황을 고려한 탄소배출량 결정요인분석)

  • Yoon, Kyungsoo;Hong, Won Jun
    • Environmental and Resource Economics Review
    • /
    • v.31 no.2
    • /
    • pp.165-204
    • /
    • 2022
  • This study organized data from 2000 to 2014 for 20 grid-connected countries in Europe and analyzed the determinants of carbon emissions through the panel GLS method considering the problem of heteroscedasticity and autocorrelation. At the same time, the effect of introducing ETS was considered by dividing the sample period as of 2005 when the European emission trading system was introduced. Carbon emissions from individual countries were used as dependent variables, and proportion of generation by each source, power self-sufficiency ratio of neighboring countries, power production from resource-holding countries, concentration of power sources, total energy consumption per capita in the industrial sector, tax of electricity, net electricity export per capita, and size of national territory per capita. According to the estimation results, the proportion of nuclear power and renewable energy generation, concentration of power sources, and size of the national territory area per capita had a negative (-) effect on carbon emissions both before and after 2005. On the other hand, the proportion of coal power generation, the power supply and demand rate of neighboring countries, the power production of resource-holding countries, and the total energy consumption per capita in the industrial sector were found to have a positive (+) effect on carbon emissions. In addition, the proportion of gas generation had a negative (-) effect on carbon emissions, and tax of electricity were found to have a positive (+) effect. However, all of these were only significant before 2005. It was found that net electricity export per capita had a negative (-) effect on carbon emissions only after 2005. The results of this study suggest macroscopic strategies to reduce carbon emissions to green growth, suggesting mid- to long-term power mix optimization measures considering the electricity trade market and their role.

The Characteristics analysis of a Flux-lock Type Fault Current Limiter according to the Winding Directions for Power Grid (전력계통 적용을 위한 결선방향에 따른 자속구속형 한류기의 특성 분석)

  • Lee, Mi-Yong;Park, Jeong-Min
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5879-5884
    • /
    • 2013
  • With the rapid industrialization and economical development, the electricity demands of the industrial facilities and densely populated large cities are continuing to increase in Korea. The increase in the power consumption requires the extension of power facilities, but it is difficult to secure spaces for equipment installation in the limited space of urban areas. In addition, the 154 kV or 345 kV transmission systems in Korea has a short transmission distance, and are connected to one another in network structures that ensure the high reliability and stability of power supply. This structure reduces the impedance during the fault in power system, and increases the magnitude of in the short circuit fault current. The superconducting fault current limiter (SFCL) was devised to effectively address these existing problems. The SFCL is a new-concept eco-friendly protective device that ensures fast operation and recovery time for the fault current and does not need additional fault detection devices. Therefore, many studies are being conducted around the world. In this paper, based on the wiring method the initial fault current characteristics, current limiting characteristics, according to the incident angle and the change in inductance current limiting characteristics were analyzed in a multifaceted methods.

A Priority Based Multipath Routing Mechanism in the Tactical Backbone Network (전술 백본망에서 우선순위를 고려한 다중 경로 라우팅 방안)

  • Kim, Yongsin;Shin, Sang-heon;Kim, Younghan
    • Journal of KIISE
    • /
    • v.42 no.8
    • /
    • pp.1057-1064
    • /
    • 2015
  • The tactical network is system based on wireless networking technologies that ties together surveillance reconnaissance systems, precision strike systems and command and control systems. Several alternative paths exist in the network because it is connected as a grid to improve its survivability. In addition, the network topology changes frequently as forces and combatants change their network access points while conducting operations. However, most Internet routing standards have been designed for use in stable backbone networks. Therefore, tactical networks may exhibit a deterioration in performance when these standards are implemented. In this paper, we propose Priority based Multi-Path routing with Local Optimization(PMPLO) for a tactical backbone network. The PMPLO separately manages the global and local metrics. The global metric propagates to other routers through the use of a routing protocol, and it is used for a multi-path configuration that is guaranteed to be loop free. The local metric reflects the link utilization that is used to find an alternate path when congestion occurs, and it is managed internally only within each router. It also produces traffic that has a high priority privilege when choosing the optimal path. Finally, we conducted a simulation to verify that the PMPLO can effectively distribute the user traffic among available routers.

Construction of a Sub-catchment Connected Nakdong-gang Flood Analysis System Using Distributed Model (분포형 모형을 이용한 소유역 연계 낙동강 홍수해석시스템 구축)

  • Choi, Yun-Seok;Won, Young-Jin;Kim, Kyung-Tak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.202-202
    • /
    • 2018
  • 본 논문에서는 분포형 강우-유출 모형인 GRM(Grid based Rainfall-runoff Model)(최윤석, 김경탁, 2017)을 이용해서 낙동강 유역을 대상으로 대유역 홍수해석시스템을 구축하고, 유출해석을 위한 실행시간을 평가하였다. 유출모형은 낙동강의 주요 지류와 본류를 소유역으로 구분하여 모형을 구축하고, 각 소유역의 유출해석 결과를 실시간으로 연계할 수 있도록 하여 낙동강 전체 유역의 유출모형을 구축하였다. 이와 같이 하나의 대유역을 다수의 소유역시스템으로 분할하여 모형을 구축할 경우, 유출해석시스템 구성이 복잡해지는 단점이 있으나, 소유역별로 각기 다른 자료를 이용하여 다양한 해상도로 유출해석을 할 수 있으므로, 소유역별 특성에 맞는 유출모형 구축이 가능한 장점이 있다. 또한 각 소유역시스템은 별도의 프로세스로 계산이 진행되므로, 대유역을 고해상도로 해석하는 경우에도 계산시간을 단축할 수 있다. 본 연구에서는 낙동강 유역을 20개(본류 구간 3개, 1차 지류 13개, 댐상류 4개)의 소유역으로 분할하여 계산 시간을 검토하였으며, 최종적으로 21개(본류 구간 3개, 1차 지류 13개, 댐상류 5개)의 소유역으로 분할하여 유출해석시스템을 구축하였다. 댐 상류 유역은 댐하류와 유량전달이 없이 독립적으로 모의되고, 댐과 연결된 하류 유역은 관측 방류량을 상류단 하천의 경계조건으로 적용한다. 지류 유역은 본류 구간과 연결되고, 지류의 계산 유량은 본류와의 연결지점에 유량조건으로 실시간으로 입력된다. 이때 본류와 지류의 유량 연계는 데이터베이스를 매개로 하였다. 유출해석시스템의 성능을 평가하기 위해서 Microsoft 클라우드 서비스인 Azure를 이용하였다. 낙동강 유역을 20개 소유역으로 구성한 경우에서의 유출해석시스템의 속도 평가 결과 Azure virtual machine instance DS15 v2(OS : Windows Server 2012 R2, CPU : 2.4 GHz Intel $Xeon^{(R)}$ E5-2673 v3 20 cores)에서 1.5분이 소요 되었다. 계산시간 평가시 GRM은 'IsParallel=false' 옵션을 적용하였으며, 모의 기간은 24시간을 기준으로 하였다. 연구결과 분포형 모형을 이용한 대유역 유출해석시스템 구축이 가능했으며, 계산시간도 충분히 단축할 수 있었다. 또한 추가적인 CPU와 병렬계산을 적용할 경우, 계산시간은 더 단축될 수 있으며, 이러한 기법들은 분포형 모형을 이용한 대유역 유출해석시스템 구축시 유용하게 활용될 수 있을 것으로 판단된다.

  • PDF