• Title/Summary/Keyword: Government Project

Search Result 2,021, Processing Time 0.024 seconds

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

The Krang Ponley Water Resources Development Project on Cambodia (캄보디아 크랑폰리강 유역 다목적 수자원개발사업)

  • Kim, Myong-Nim;Choi, Byoung-Seub;Chun, Gun-Ill
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.823-828
    • /
    • 2008
  • In accordance with the Cambodian government's poverty reduction policy, the Krang Ponley Water Resources Development Project was selected and has been carried out as a priority to develop the northwest areas of Phnom Penh since early 2003. Rehabilitation and new construction of water supply system such as embankments, canals and hydraulic structures are urgently needed for stable water supply, hydropower generation and flood damage reduction within the project area. The completion of the project is expected to be extremely helpful in the economic development of Cambodia as well as to improving the economic conditions of the residents in the project area.

  • PDF

기술혁신 기업과 R&D 프로젝트 파이낸스 : 지속적 기술혁신을 위한 자금조달의 대안

  • 김영훈;변혜영;이정동
    • Proceedings of the Technology Innovation Conference
    • /
    • 2006.02a
    • /
    • pp.170-186
    • /
    • 2006
  • The guarantee funds for government policy fund, venture capital investment fund, technology guarantee debt are the core parts of the external financing system in the constant technology innovation company. However, the enterpriser's requirement to keep the technology innovation with minimized management intervention and policy maker's hope to advance technology development with clear operation of funds is enough to request for research of the project investment plan to the R&D project. This paper will analyze whether technology innovation company that creates cash flow prefers to the project investment as a financing program or not, and if prefers, what characters of company affect on this preference. The more the company that pursuit the additional R&D activity separated to on-going items becomes over the fixed size, the more prefers the project investment as future external fund-raising. Together with that, this paper suggests that we can apply the plan like special purpose vehicle, SWORD(Stock Warrant Off-Balance sheet R&D) and R&D Limited Partnership as R&D project investment policy, and improve the system itself.

  • PDF

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams (기존댐 치수능력 증대사업의 시행 방안)

  • Lee, Wan-Ho;Ahn, Hee-Bok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF

A Study on Infrastructure Improvement Project of Eco and Green Tourism Villages -Focused on Arum Village Revitalization Project- (생태·녹색관광마을의 기반시설 정비사업 분석 연구 -아름마을 가꾸기 시범사업을 대상으로-)

  • Lee, Dong-Ju;Lee, Wang-Kee
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.8 no.3
    • /
    • pp.17-26
    • /
    • 2006
  • As demands and interests in visiting rural village increases, government authorities are promoting eco and green tour village development project through plural functions of rural village. The purpose of this study is to understand infrastructure improvement direction by researching the case study of general rural villages' changing to eco and green tourism villages. As for the research method, the character of each village was verified, then the case studies of improvement by life infrastructure using the identity of villages were analyzed. Finally, it was found that infrastructure through public facilities improvement and environment improvement project was expanded and relaxative and experiential space was offered by creating tour infrastructure using the identity of villages. Also, it was shown that farming infrastructure creating project was executed to promote the income base of locals.

  • PDF

Overview of "Glean Engine Technology Development Project" at Japan Aerospace Exploration Agency

  • Hayashi, Shigeru
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2004.03a
    • /
    • pp.870-875
    • /
    • 2004
  • In Japan, a long-waited civil aero engine development project has been recently started by the New Energy and Industrial Technology Development Organization, NEDO. “High efficiency,” “environmentally friendliness” and “low-cost” are the key words of the target engine. The target engine is of l0000-lb thrust with project consists of three phases: Feasibility studies and market research in the first phase, FY 2003, engine component development in the second phase, FY 2004-2006, and core and full engine demonstrators in the third phase, FY 2007-2009. In league with this government/industry joint funded project, Institute of Space Technology and Aeronautics, JAXA, has initiated “Clean Engine Technology” project.

  • PDF

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

A Research about Importance and Satisfaction in Each Tasks on Apartment Remodeling (공동주택 리모델링 사업의 업무별 중요도 및 만족도 조사)

  • Oh, Chi-Seob;Choi, yun-ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.6
    • /
    • pp.35-43
    • /
    • 2018
  • As rapid increasing of domestic apartments, decline of the market value of the old apartment and to be announced policy by government are re-lighting to be insufficient growth than the past 15 years in market of apartment remodeling. In this study, research the conflicts on apartment remodeling project and analysis of importance and satisfaction by survey. Also, the survey was being progressed for every participant who are related in an apartment remodeling project. After this study, this study will propose basic data for effective way to improve on apartment remodeling project. For this purpose, generalize the project stage level by level. And analysis status of business progress to be felt from participants of project. According to the results by a survey, the each result of elements can be a reference value for a good way of apartment remodeling to proceed and improve.

AN INTEGRATED REAL OPTION-RISK MANAGEMENT FRAMEWORK FOR PPP/PFI PROJECTS

  • Jicai Liu;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.729-738
    • /
    • 2007
  • The Public Private Partnership/Private Finance Initiative (PPP/PFI) schemes have made the private sector become a major participant involved in the development of infrastructure systems along with the government. Due to more integrated efforts among project participants and longer concession period, PPP/PFI projects are inherently more complex and risky. It is therefore very important to proactively manage the risks involved throughout the project life cycle. Conventional risk management strategies sometimes ignore managerial flexibility in the planning and execution process. This paper starts with a revised risk management framework which incorporates the real option concept. Following the presentation of the framework, a new risk classification is proposed which leads to different ways of structuring options in a project according to the stage of the project life cycle. Finally, the paper closes by discussing other issues concerning option modeling and negotiation.

  • PDF