• 제목/요약/키워드: Geothermal Snow Melting System

검색결과 9건 처리시간 0.031초

지열 융설시스템을 적용한 포장체의 열전도분석 및 구조안전성 검토 (The Thermal conductivity analysis and performance evaluation on the pavement applying geothermal snow melting system)

  • 이승하;박정식;이석진;김봉찬
    • 한국지열·수열에너지학회논문집
    • /
    • 제6권1호
    • /
    • pp.17-22
    • /
    • 2010
  • A sliding accident on the road have a high percentage by road freezing, especially, it is often appeared at bridges and tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing a partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out about pavement materials of concrete and asphalt when it is buried. For the feasibility study on geothermal snow melting system, analysis of the ground melting point when operating system, life evaluation of pavements and safety evaluation of pipes are performed.

난방.융설 겸용 지열원 히트펌프시스템의 운전성능 평가 (A Performance Estimation of Ground Source Heat Pump System Used both for Heating and Snow-melting)

  • 최덕인;김중헌;황광일
    • 한국지열·수열에너지학회논문집
    • /
    • 제8권1호
    • /
    • pp.7-12
    • /
    • 2012
  • This study proposes a hybrid geothermal system combined with heating mode and snow-melting mode for winter season in order to increase the annual operating efficiency of the GSHP(Ground Source Heat Pump). The purpose of this study is to get effectiveness of the hybrid geothermal system by the site experiments. In case of snow-melting only mode, the GSHP COP is 0.7 higher than system COP in average. And in case of hybrid mode, heating GSHP COP is 0.5 higher than snow-melting GSHP COP. And it is also found out that all COP obtained through measurement periods is higher than nominal COPs given by GSHP manufacturer. As a conclusion, it is clear that the proposed hybrid geothermal system is expected as a highly efficient system.

도로의 결빙방지를 위한 지열이용 시스템 연구 (A Study on the Highway Snow Melting and Deicing System Using Geothermal Energy)

  • 신현준;서정윤
    • 한국안전학회지
    • /
    • 제8권4호
    • /
    • pp.139-148
    • /
    • 1993
  • Thermosyphons are simple devices that can passively transport thermal energy over relatively long distance with little temperature degradation. These attributes permit the use of low grade thermal energy for thermal control of structures including the snow melting and deicing to the pavement surface. The thermosyphon system requires no costly energy input and Is completely maintenance free. This paper presents the experimental results of the snow melting system in which thermosyphon was utilized to transfer the geothermal energy to the pavement to obviate slipping traffic accidents due to freezing of pavement in winter.

  • PDF

지열원히트펌프를 활용한 도로융설시스템의 성능 평가 및 예측 (An Evaluation and Prediction of Performance of Road Snow-melting System Utilized by Ground Source Heat Pump)

  • 최덕인;황광일
    • 한국태양에너지학회 논문집
    • /
    • 제32권3호
    • /
    • pp.138-145
    • /
    • 2012
  • Because of the climate changes and the development of building technologies, the cooling loads have been increased. Among the various renewable energies, geothermal energy is known as very useful and stable energy for heating and cooling of building. This study proposes a road snow-melting system of which heat is supplied from GSHP(Ground source heat pump) in viewpoint of the initial investment and annual running performance, which is also operating as a main facility of heating and cooling for common spaces. The results of this study is as followings. From the site measurement, it is found out that the road surface temperature above the geothermal heating pipe rose up to $5^{\circ}C$, which is the design temperature of road snow-melting, after 2 hours' operation and average COP(Coefficient of performance) was estimated as 3.5. The reliability of CFD has confirmed, because the temperature difference between results of CFD analysis and site measurement is only ${\pm}0.4^{\circ}C$ and the trend of temperature variation is quite similar. CFD analysis on the effect of pavement materials clearly show that more than 2 hours is needed for snow-melting, if the road is paved by ascon or concrete. But the road paved by brick is not reached to $5^{\circ}C$ at all. To evaluate the feasibility of snow-melting system operated by a geothermal circulation which has not GSHP, the surface temperature of concrete-paved road rise up to $0^{\circ}C$ after 2 hour and 40 minutes, and it does never increase to $5^{\circ}C$. And the roads paved by ascon and brick is maintained as below $0^{\circ}C$ after 12 hours geothermal circulation.

지열 융설시스템을 적용한 포장체에서의 열전도 분석 (The Thermal conductivity analysis on the pavement applying geothermal snow melting system)

  • 이석진;김봉찬;서운종;이승하;이주호
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.221-228
    • /
    • 2010
  • A sliding accident on the road have a high percentage by road freezing, especially, it is often appeared at bridges and Tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing a partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out about pavement materials of concrete and asphalt when it is buried. The thermal conductivity study is essential that be applied the geothermal snow melting system according to heating exchanger pipe laying of lower pavements. The model tests are conducted on low temperature in freezer using the manufactured test model which is equal to pavement materials. And Many variables are discovered from numerical analyzes of the same conditions with model test.

  • PDF

배관시스템을 활용한 도로융설 시스템의 설계방법 (Design of Road Snow Melting system Using Piping System)

  • 김진호;김중헌;이건태
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1251-1255
    • /
    • 2009
  • Snow melting system is adapted for safety and environment sides. Geothermal System has some problem of unbalance between summer and winter heat loads. Snow melting system with piping system is widely adapted in Japan. In this paper, the variation of road surface temperature along time for heating load is investigated. And for checking the difference between electrical melting system and piping melting system, other design parameters is investigated.

  • PDF

지열원 히트펌프를 이용한 도로융설시스템의 CFD 성능예측에 관한 기초연구 (A Basic Study on the Performance CFD simulation of Road Snow-melting system by Ground Source Heat Pump)

  • 최덕인;김중현;김진호;황광일
    • 한국지열·수열에너지학회논문집
    • /
    • 제6권2호
    • /
    • pp.23-28
    • /
    • 2010
  • Fluent ver.6.3 is used as CFD(Computational Fluid Dynamics) simulator to predict the performance of snow-melting system by geothermal pipes energy. As the results of this simulation, it is clearly shown that $50^{\circ}C$ of working fluid in to geothermal evaluated as more effect comparing to $45^{\circ}C$ of working fluid. The Surface temperature is come to $5^{\circ}C$ at 1m/s speed and $50^{\circ}C$ temperature of the working fluid.

도로주행 안정성 향상을 위한 지열 융설시스템 열전도 분석 (Analysis of Geothermal Melting System Conductivity for Improving Road Safety)

  • 이석진;김봉찬;이승하;서운종;김진한;이주호
    • 한국재난관리표준학회지
    • /
    • 제3권1호
    • /
    • pp.43-50
    • /
    • 2010
  • 도로에서 발생하는 사고 중 도로결빙에 의한 미끄러짐 사고비율이 높으며, 특히 상습 결빙 지역인 교량과 터널 입출부에서 발생 빈도가 높게 나타난다. 이렇게 부분적으로 발생되는 결빙 현상을 방지하여 도로운영의 안정성을 높이고자 한다. 지열 융설의 기초 연구를 통해 일반 도로포장 재료인 콘크리트, 아스팔트 두 종류의 재료에 대한 융설시 열전도 양상을 파악하고자 한다. 지열융설 시스템 적용시 포장체 하부 열교환 파이프 매설에 따른 열전도도 연구가 필요하다. 도로 포장과 동일 재질의 시험체를 제작하여 냉동고에서 저온상태의 모형시험을 수행 하였고, 모형시험과 동일 조건의 수치해석을 통해 보다 다양한 융설에 대한 변수를 파악하였다.

  • PDF