• Title/Summary/Keyword: Geometric Location

Search Result 273, Processing Time 0.024 seconds

The traffic accident factors and reduction method in the hazard zone of mountain sightseeing roads -focused on Jeju local roads- (산악관광도로 위험구간의 교통사고 요인분석 및 감소방안 -제주도의 지방도를 중심으로-)

  • Oh, Jae-Hwan;Hwang, Kyung-Soo;Kim, Kyung-Bum;Yang, Jeong-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.374-388
    • /
    • 2016
  • In Jeju-Do, there is the 1100 Road, 516 Road, and Bijarimro, which are typical mountain sight-seeing roads in Jeju. These roads are local roads that have been the location for many traffic accidents. This study focused on these roads, categorized the type of traffic accident and analyzed the accident characteristics. The major accident factors were analyzed through trip AHP analysis, Comparative analysis of the velocity distribution and the factors affecting traffic accidents were analyzed. Tourists took many trips on these roads. The mixing rate of the rental cars was 36.70%~71.60% in 1100 road and Bijarimro. Currently, these local roads are regulated by a speed limit of 60km/h. However, it might be necessary to reduce the speed limit to 40km/h considering the geometric line form of the road and the climate in these areas. The speed limit of more than 40km/h is found 87.0% on 516 Roads, 88.57% on 1100 roads, and 93.1% on Bjarimro, In these roads, the speed ratio is higher as described above. Therefore, these roads have been found to have a higher risk of traffic accidents by overspeeding driving. The overspeed driving ratio of these roads was 87.0%~93.1%, The overspeed driving enforcement method at one spot has only the effect of reducing the speed at that enforcement place; the effect cannot be expected for the other places or sections. It is necessary to introduce a section overspeed driving enforcement system utilizing the average velocity in these areas to prevent traffic accidents.

Evaluation on Noise Characteristics by Field Application of Improved Rumble Strip (개선된 럼블스트립의 현장적용에 따른 사후 소음특성 평가)

  • An, Deok-Soon;Suh, Young-Chan;Son, Hyeon-Jang;Lee, Jae-Jun;Eom, Byeong-Sik
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.33-39
    • /
    • 2013
  • PURPOSES : This research investigates traffic noise characteristics as change the transverse rumble strips shape from rectangular to cylinder at toll plaza of highway. METHODS : The traffic noise was investigated at two different places at toll plaza of highway. One is modified grooving, another is employed cylinder shape of TRS instead of rectangular shape of TRS. A measurement of traffic noise was conducted at same location and time period. The traffic volume information was gotten from office of highway office and vehicle speed was measured by speed measuring device. The traffic noise measurement was conducted from 13:00 to 23:00 and by pass-by method. Also, the traffic noise was measured behind noise barrier. Various distance from noise barrier(7.5m, 30m, 50m) and different heights(1.2m, 3m, and 5m) were parameter for measurement of traffic noise in this study. RESULTS : The class 1 vehicle was contributed from traffic volume which was increased 1,500. However, the distribution of traffic speed didn't change compare to previous investigated period. From this study, It was found that the external traffic noise was changed as function of geometric shape of TRS. The external noise from modified grooving was less than 1.2dB(A) of the current TRS. A difference of traffic noise was 20dB(A) before and after barrier. It came from a noise barrier effect as reduction of traffic noise. According to investigate a traffic noise distribution near barrier, there is similar noise characteristic as function of height at 7.5m distance from noise barrier. Also, There is no different traffic noise between 30m and 50m from source of the noise of sound barrier. CONCLUSIONS : Based on this traffic noise investigation result, there is a clear characteristic difference as changed TRS shape. The traffic noise was reduced by changed TRS shape. Specially, traffic noise was decreased although the traffic volume was increase for same investigation time and period. It is implied that cylinder type of TRS significantly reduces the traffic noise. The specification of various TRS will be studied in the future.

A Study on the RCS Analysis and Reduction Method of Unmanned Surface Vehicles (무인수상정의 RCS 해석 및 감소 방법에 대한 연구)

  • Han, Min-Seok;Ryu, Jae-Kwan;Hong, Soon-Kook
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.12 no.4
    • /
    • pp.425-433
    • /
    • 2019
  • In this paper, the RCS analysis of the 10m unmanned surface vehicles was performed, and the factors of RCS increase were analyzed. Modeling techniques by transforming a geometric shape can reduce the RCS area, which can be used to develop stealth unmanned surface vehicles. In order to reduce the RCS, the existing Top Mast part was moved 1m to the tail part, the 5 degree tilt angle was moved below 0.5 m, and additional guided walls were installed to minimize the influence on the center and surrounding corner reflecting structures. As a result of comparing and analyzing the RCS analysis value with the existing model, it can be seen that the reduced countermeasure model is -3.79 dB lower than the existing model for all elevations. In particular, it can be seen that the strong scattering phenomenon is substantially removed in the region except the sacrificial angle region. In addition, it can be seen that in the case of -5m to 2m where the guide wall is added, the reflected signal is improved up to 20 to 40 dB or more, so that it does not appear on the 2D ISAR image. RCS analysis of unmanned surface vehicles explained the process of analyzing and identifying problem location through distance profile analysis and ISAR image analysis.

Experiment on the Correlation between Mass Flux of Heptane and Material Property of Wall in Compartment Fire (구획 화재 시 벽면 재료 특성과 헵탄의 질량유속 상관관계 실험)

  • Park, Jung Wook;Shin, Yeon Je;Kim, Jeong Yong;You, Woo Jun
    • Fire Science and Engineering
    • /
    • v.33 no.1
    • /
    • pp.39-44
    • /
    • 2019
  • In this study, the relationships between the material properties of the wall and the fuel mass flux in compartment fire. The fire resistant board (fire-board) and steel plate compartments are constructed with a 0.3 m width, 0.5 m height and 3.0 m length. To obtain the mass loss rate considering the location of the fire origin in compartment, experiments of a heptane pool fire are performed with a combustion area of $0.01m^2$ and $0.0225m^2$. The results show that the initial mass flux of heptane, $0.0087kg/m^2{\cdot}s$, is increased to $0.166kg/m^2{\cdot}s$ for fire board and $0.019kg/m^2{\cdot}s$ for steel plate. It means that the fire-scenario should be considered with the thermal characteristics of the material properties and geometric shapes of the compartment to predict fire propagation accurately in a compartment space.

LMU Design Optimization for the Float-Over Installation of Floating Offshore Platforms (부유식 해양구조물의 플로트오버 설치용 LMU 최적설계)

  • Kim, Hyun-Seok;Park, Byoungjae;Sung, Hong Gun;Lee, Kangsu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.43-50
    • /
    • 2021
  • A Leg Mating Unit (LMU) is a device utilized during the float-over installation of offshore structures that include hyperelastic pads and mating part. The hyperelastic pads absorb the loads, whereas the mating part works as guidance between topside and supporting structures during the mating sequence of float-over installation. In this study, the design optimization of an LMU for the float-over installation of floating-type offshore structures is conducted to enhance the performance and to satisfy the requirements defined by classification society regulations. The initial dimensions of the LMU are referred to the dimensions of those used in fixed-type float-over installation because only the location and the number of LMUs are known. The two-parameter Mooney-Rivlin model is adopted to describe the hyperelastic pads under given material parameters. Geometric variables, such as the thickness, height, and width of members, as well as configuration variables, such as the angle and number of members, are defined as design variables and are parameterized. A sampling-based design sensitivity analysis based on latin hypercube sampling method is performed to filter the important design variables. The design optimization problem is formulated to minimize the total mass of the LMU under maximum von Mises stress and reaction force constraints.

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

Numerical simulations on electrical resistivity survey to predict mixed ground ahead of a TBM tunnel (TBM 터널 전방 복합지반 예측을 위한 전기 비저항 탐사의 수치해석적 연구)

  • Seunghun Yang;Hangseok Choi;Kibeom Kwon;Chaemin Hwang;Minkyu Kang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.403-421
    • /
    • 2023
  • As the number of underground structures has increased in recent decades, it has become crucial to predict geological hazards ahead of a tunnel face during tunnel construction. Consequently, this study developed a finite element (FE) numerical model to simulate electrical resistivity surveys in tunnel boring machine (TBM) operations for predicting mixed ground conditions in front of tunnel faces. The accuracy of the developed model was verified by comparing the numerical results not only with an analytical solution but also with experimental results. Using the developed model, a series of parametric studies were carried out to estimate the effect of geological conditions and sensor geometric configurations on electrical resistivity measurements. The results of these studies showed that both the interface slope and the difference in electrical resistivity between two different ground formations affect the patterns and variations in electrical resistivity observed during TBM excavation. Furthermore, it was revealed that selecting appropriate sensor spacing and optimizing the location of the electrode array were essential for enhancing the efficiency and accuracy of predictions related to mixed ground conditions. In conclusion, the developed model can serve as a powerful and reliable tool for predicting mixed ground conditions during TBM tunneling.

A Study on the Possibility of Producing a Floor Plan of 「Donggwoldo(東闕圖)」 through the Use of Rubber Sheeting Transformation - With a Focus on the Surroundings near the Geumcheongyo Bridge in Changdeokgung Palace - (러버쉬팅변환을 통한 「동궐도(東闕圖)」의 평면도 제작 가능성 연구 - 창덕궁 금천교 주변을 중심으로 -)

  • Lee, Jae-Yong;Kim, Young-Mo
    • Korean Journal of Heritage: History & Science
    • /
    • v.50 no.4
    • /
    • pp.104-121
    • /
    • 2017
  • The present study attempted to produce the floor plan of the surroundings near Geumcheongyo Bridge in Changdeokgung Palace of the Late Joseon Period through the use of rubber sheeting transformation based on the drawing principles of "Donggwoldo(東闕圖)". First, the study compared the actual sizes of the major buildings that have existed since the production of "Donggwoldo(東闕圖)" with the sizes depicted in the picture to reveal that the front elevation of the buildings was produced by reducing it by approximately 1/200. However, the study could not confirm the same production proportions for the side elevation. Only the lengths of the side elevation were depicted at around half of the actual proportions, and as the diagonal line angles were found to be at an average of $39^{\circ}$, the study confirmed they were drawn in a manner similar to cabinet projection. Second, the study created an obliquely projected floor plan by inversely shadowing the drawing principles of "Donggwoldo(東闕圖)" and produced a floor plan of the surroundings near Geumcheongyo Bridge in Changdeokgung Palace through the use of rubber sheeting transformation. Projective transformation was confirmed as most suitable during the transformation, and with standard error of 2.1208m, the relatively high accuracy of the transformation shows that the production of a floor plan for "Donggwoldo(東闕圖)" is significant. Furthermore, it implies the possibility of producing floor plans for various documentary paintings produced using the paralleled oblique drawing method in addition to "Donggwoldo(東闕圖)". Third, the study evaluated the accuracy of the spatial information provided by the produced floor plan by comparing the three items of Geumcheongyo Bridge location, Geumcheongyo Bridge and Jinseonmun Gate arrangement, and Geumcheon stone embankment location. The results confirmed the possibility of utilizing the floor plan as a useful tool which helps understand the appearance of the surroundings at the time of "Donggwoldo(東闕圖)" production because it is parallel to the excavation results of the Geumcheongyo Bridge and its context. Therefore, the present study is significant in that it seeks the possibility of producing spatial information recorded in "Donggwoldo(東闕圖)" by applying rubber sheeting transformation and consequently in that it presents a new methodology for understanding the appearance of the East Palace of the Late Joseon Period.

Reproducibility of Applicator Position with High dose rate brachytherapy in uterine cervical cancer (자궁경부암 환자의 근접치료시 재현성 평가)

  • Kim Jong-Hwa;Son Jung-Hae;Jung Chil;Kim Mi-Hwa
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.15 no.1
    • /
    • pp.29-33
    • /
    • 2003
  • I. Purpose Brachytherapy is the main component in treatment of patients with uterine cervical cancer. The reproducibility of applicator position in the same patient at repeated treatments was very important for accurate dose delivery. It was aimed to evaluate the change of applicator location between each high dose rate(HDR) brachytherapy insertion in the patients with uterine cervical cancer. II. Materials and Methods From January 1999 to October 2001, total 52 patients were treated with external beam radiotherapy and HDR brachytherapy (Microselectron, Nucletron). During six to seven times of brachytherapy, all patients had three treatment plans. From the orthogonal radiographs, we measured the following variables; height from upper border of pubic bone to os (HPO), distance from sacral promontory to tip of tandem (DST), distance from coccyx to os (DCO), distance from tip of right ovoid to os (DRO), distance from tip of left ovoid to os (DLO), and distance from center of the first tandem source to ovoid (DTO). To evaluate the reproducibility of applicator position, it was calculated the standard deviation of differences between three insertions for the 7 parameters in each patient. III. Results The ranges of standard deviations of interfractional differences for the variables were as follows. 1)HPO : $0{\sim}0.79cm$ 2)DST : $0{\sim}0.9cm$ 3)DCO : $0.06{\sim}0.76cm$ 4)DRO : $0{\sim}0.53cm$ 5)DLO : $0{\sim}0.45cm$ 6) DTO $0{\sim}0.36cm$ IV. Conclusions There was some change in applicator position on repeated implants in our study. But variation of the interfractional differences was minimal; in all parameters, there were less than 1 cm. We are continued to try for reducing the geometric variation between each procedure.

  • PDF

Improvement of GPS positioning accuracy by static post-processing method (정적 후처리방식에 의한 GPS의 측위정도 개선)

  • 김민선;신현옥
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.39 no.4
    • /
    • pp.251-261
    • /
    • 2003
  • To measure the GPS position accuracy and its distribution according to the length of the baseline, 30 minutes to 24 hours observations at the fixed location were conducted with two GPS receivers (Ll, 12 channels) on May 29 to June 2, 2002. The GPS data received at the reference station, the rover station and the ordinary times GPS observation station operated by the National Geography Institute in Korea were processed in kinematic and static post-processing methods with a post -processing software. The results obtained are summarized as follows: 1. The number of the satellite that could be observed continuously more than six hours was 16 and most of these satellites were positioned at east-west direction on May 31, 2002. The number of the satellite observed and the geometric dilution of precision (GDOP) determined by the average of every 10 minute for the day were 8 and 3.89, respectively. 2. Both the average GPS positions before and after post-processing were shifted (standalone: 1.17 m, post -processing: 0.43m) to the south and west. The twice distance root mean square (2drms) measured with standalone was 6.65m. The 2drms could be reduced to 33.8% (standard deviation 0=17.2) and 5.3% (0=2.2) of standalone by the kinematic and the static post-processing methods, respectively. 3. The relationship between the length of the baseline x (km) and the 2drms y (m) obtained by the static post-processing method was y=0.00l6x+0.006 $(R^2=0.87)$. In the case of the positioning with the static post-processing method using the GPS receiver, it was found that a positioning within 20cm 2drms was possible when the length of the baseline was less than 100km and the receiving time of the GPS is more than 30 minutes.