This paper shows the optimal bidding strategy determination method using Nash equilibrium concept by defining bidding strategy vector. This vector is 2-dimension vector whose components are generation amount and generation cost. Thereby we are able to make all possible strategies and their's payoff table. And then we erase dominated strategies one by one so that we obtain Nash equilibrium, the optimal bidding strategy of generation bidding game.
수직 통합된 체제의 전력회사가 6개의 발전회사와 1개의 판매회사로 분리되고 전력거래소를 통한 전력거래가 본격화되면서 발전회사는 자체 소유 발전설비의 공급가능용량을 어떻게 활용하느냐에 따라 영업상 수익의 영향을 받게 된다. 특히, 하루 전 발표되는 한계가격(System Marginal Price, Base Load Marginal Price)에 맞도록 전력생산을 위한 발전 비용함수를 적용한다면 익일의 공급가능용량이 최적 배분됨으로써, 변동비 반영 시장(Cost based Generation Pool)과 입찰가격 반영 발전시장(Price Bidding Generation Pool)에 적용될 계통운영보조서비스의 계약 물량 산출 및 익일 생산비용의 최적화를위한 입찰전략(Bidding Strategies) 수립이 가능해 지므로 보유 설비에 대한 최적이용이 가능하게 된다. 따라서 본 논문에서는 수요예측 오차와 과거 시장운영 실적을 기초로 년 간 유지보수 계획을 수립하고, 계통운영보조서비스에 대한 계약물량 산출과 개개 발전기의 비용함수 산출, 적용을 통한 발전설비의 효율적인 입찰 방안에 대해 논하고자 한다.
Combined cycle plants which feature distinct advantages for power generation such as fast response, high efficiency, environmental friendliness, fuel flexiblity represent the majority of new generating plant installations across the globe. Combined cycle plants have different operating modes where the operating parameters can differ greatly depending which mode is operating at the time. This paper addresses the bidding strategy model of combined cycle plants in a competitive electricity market by using a characteristic of multiple operating modes of combined cycle plants. Simulation results of case studies show that an operating mode among multiple ones is selected strategically in generation bidding for more profit of generation company.
KIEE International Transactions on Power Engineering
/
제3A권1호
/
pp.47-52
/
2003
This paper presents a schematic process based on the method of eliminating dominated strategies to obtain the optimal bidding strategy Pursuing the Nash equilibrium Point. The Proposed approach is demonstrated for a bidding game in a generation competitive market with 2-dimensional bidding strategy vectors constituting a price-quantity strategy curve.
Under an open transmission access, the generation dispatch is determined by the bidding process of market participants. Congestion occurs when the dispatch would result in the violation of operational constraints. Congestion problem is formulated and solved by OPF(optimal power flow) calculation. The objective functions in OPF are given as quadratic cost functions or piecewise linear functions of bidding functions. In this study, the optimization technique of generation dispatch is presented for the combination of two types of quadratic and linear cost functions.
The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilization of their own generation equipments. Especially, the electricity demand shows seasonal and weekly regular pattern, which the some capacity should be provided into ancillary service based on the past demand forecasting error and operating results of electricity market. Namely, if generation cost function is applied to SMP and BLMP as announced the previous day, the available generation capacity of the following day could be optimally distributed, and therefore contract capacity of ancillary service applied to CBP(Cost Based Pool) and TWBP(Two-Way Bidding Pool) is determined. Consequently, it is Possible to use the retained equipments optimally. This paper represents on efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.
As deregulation evolves, pricing electricity becomes a major issue in the electric industry. Participants of competitive marketplace are able to improve their profits substantially by adequately pricing the electricity. In this paper, game theory is applied to analyze the price-clearing in the generation bidding competition and the competition is modeled as the noncooperative and complete information. The result of this analysis can be useful in understanding spot price-clearing of electricity and generating entity's strategic behavior in the competitive electricity market.
KIEE International Transactions on Power Engineering
/
제4A권4호
/
pp.243-253
/
2004
As deregulation evolves, pricing electricity becomes a major issue in the electric power industry. Participants in the competitive marketplace are able to improve their profits substantially by effectively pricing the electricity. In this paper, game theory is applied to analyze price-clearing in the generation bidding competition with the competition modeled as the non-cooperative and complete information game. The result of this analysis can be useful in understanding spot price-clearing of electricity as well as GENCOs' strategic behavior in the competitive electricity market.
Generation companies(Genco) submit the supply functions as a bidding function to a bid market in a competitive electricity market. The profits of Gencos vary in accordance with the bid functions, so the selection of a bidding function plays a key role in increasing their profits. This paper presents an analysis of the selection of the supply function from the viewpoint of Nash equilibrium(NE). Four types of bidding function parameters are used for analizing the electricity market. The competition of selecting bidding parameters is modeled as subgame and overall game in this research. The NEs in both game are computed by using analytic method and payoff matrix method. It is verified in case studies for the NE of overall game to satisfy the equilibrium condition.
As deregulation of power industry is becoming a reality, there has been an intense interest in the strategic bidding for suppliers to maximize their profits. The profit gained by a supplier is related not only to its energy-price bid curve but also to its submitted operational parameters such as generation capacity, etc. So suppliers are willing to use those strategic parameters that can be manipulated by themselves and are effective to their profit. This paper deals with the competition model with compound strategies: generation capacity and bidding curve. The parameter space is modeled by dividing into the two strategies, so the problem is made up of the four types of sub-game in a two player game. This paper analyzes the global Nash Equilibrium (NE) over the whole divisions by computing the sub-game NEs in some divisions and by deriving the best response curves which have discontinuities in other divisions. The global NE is shown to correspond to the Cournot NE where the quantity variable is realized by a constraints of a generation capacity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.