Most technologies of reduction process used in the heat treatment of existent metal products are related to metals applied to bolts and parts of automobiles, and nonmetal such as copper. Heating conditions and reduction gases produced in above processes depend on types of products to be treated thermally but heating systems employ electricity commonly and the reduction gases are separated into additional production equipment and a gas dryer and inefficiently provided into the system. Electrical heating system has the advantage of convenient temperature-control but is not economical because of disadvantages of high electricity-running cost and extra installation cost of a transformer. Accordingly, development of the system which has economical heating mode in which provision of reduction gas and heating conditions are unified is necessary for improvement of economy and efficiency in current reduction processes. This study aimed to develop a new advanced heat treatment furnace using catalytic combustion. thereby minimizing the cost during heating, supplying heat and reductive gas at the same time and controlling operating condition freely by changing electrical heating system to heating system by the gas combustion and regeneration of wasted heat.
Transactions of the Korean Society of Mechanical Engineers B
/
v.26
no.2
/
pp.328-335
/
2002
In this study, experiments were performed to investigate the characteristics of flame stabilization of the LFG mixing gas. LFG has merely half heating value compared with liquified natural gas but can be greatly utilized as a commercial fuel. In order to use LFG in practical combustors, Webbe Index and heating value of LFG mixing gas were adjusted by mixing LPG with LFG. The comparisons were conducted between CH$_4$and LFG mixing gas for searching the region of flame stabilization based upon the flame blowout at maximum fuel stream velocity. As a result, the flame stability of LFG mixing gas was not improved with that of CH$_4$in non-swirl and weak swirl diffusion flame. However, LFG mixing gas had wide flame stabilization region rather than CH$_4$with increasing ambient flow rate in strong swirl. It was also found that flame stability was affected by included quantity of inert gas such as CO$_2$in the weak swirl but by heating value of fuel in strong swirl.
Kim, Dae-Hun;Kim, Seung-Hoon;Kwon, Soo-Ahn;Kim, Yongjoo;Lee, Jaejun
International Journal of Highway Engineering
/
v.17
no.2
/
pp.31-37
/
2015
PURPOSES : To design a pre-heater for warm in-place recycling equipment, three different heating systems were evaluated to determine their thermal efficiency. METHODS: In this study, a $30cm{\times}30cm{\times}15cm$ wheel-tracking specimen was used to measure the inner temperature as a function of the heating system. The inner temperature of the specimen was measured with a data logger at the surface, and at depths of 1cm, 2cm, 3cm, 4cm, and 5cm. To evaluate the thermal efficiency, the researchers used three different types of equipment, namely, IR, a heating wire, and a gas burner. RESULTS: The IR heating system exhibits a higher level of performance than the others to achieve the target temperature at a depth of 5cm in the specimen. The gas burner system was capable of heating the surface to a temperature of up to $600^{\circ}C$. The other types, however, cannot heat the surface up to 600. The thermal efficiencies were measured based on the laboratory conditions. CONCLUSIONS: To find the most effective system for application to the development of a pre-heater for warm in-place recycling, various systems (IR, heating wire, gas burner) were examined in the laboratory. As a result, it was found that the hot plate of a gas burner system provides the highest temperature at the surface of the asphalt but, of all the systems, the IR system provides the best internal temperature increase rate. Furthermore, a gas burner can age the asphalt binder of the surface layer as a result of the high temperature. However, the gas burner cannot attain the target temperature at 5cm. The IR system, on the other hand, is effective at increasing the internal temperature of asphalt.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.15
no.7
/
pp.557-562
/
2003
Flue gas from apartment heating gas boiler is exhausted outside through an exhaust duct mounted horizontally in a vertical row on the wall. The flue gas includes nitrogen-oxides (NOx) and carbon monoxide. To investigate the possible entrainment of the flue gas into the apartments through the windows, a large eddy simulation (LES) based numerical method is utilized. Distribution of the velocity intensity and temperature around the exhaust ducts is presented for three numerical parameters: exhaust velocity, temperature of the flue gas, and exhaust duct length. The flow field visualized with particles inserted at the ends of the ducts is also presented. The results clearly show that the exhausted flue gas may flow into the apartments when the windows are open.
Transactions of the Korean Society of Mechanical Engineers B
/
v.23
no.5
/
pp.687-694
/
1999
An experimental study was carried out in two laboratory-scale reactors to investigate the effect of heating rate on the behavior of flame front in a pulverized coal flame. Each. reactors had different heating mechanisms. For reactor A losing large heat through transparent quartz wall. pulverized coal particles were ignited by secondary air of 1050K. Flame front could be visualized through the transparent wall. Reactor B was insulated with castable refractory to minimize the heat loss through the reactor wall and accompanied with secondary air of 573K. Flame front was estimated from the gas temperature and species concentration measured using R-type thermocouple(Pt-Pt/Rh 13%) and gas chromatograph at various coal-air ratios and swirl intensities. The flame front position was closely related with the magnitude of heating rate. The heating rate for lifted flame was of the order of $10^4$ to $10^5K/s$ and for coal Ignition at least over $10^4K/s$. The heating mechanism had little impact on the extinction limits. The weak swirl number of 0.68 forced the flame front to move toward the upstream by the rapid mixing of coal and air. The primary/secondary momentum ratio was an inappropriate variable to distinct the liftoff of flame.
This paper proposed the calculation method of the avoided cost for natural gas and district heating DSM programs. And the proposed method is applied to real DSM programs. The avoided cost for natural gas consists of commodity avoided cost, supply equipment avoided cost, storage equipment avoided cost, and electric power avoided cost. In case of the district heating, avoided cost consists of heat generation equipment avoided cost, heat energy avoided cost, environment avoided cost, and electric power avoided cost. This method can be used to evaluate the benefit of DSM programs quantitatively in cost. Therefore, this method can contribute to make the cost-effectiveness evaluation system and to operate the DSM programs for natural gas and district heating effectively.
Our Housing culture continuously changes for the correspondence to social development and changes of economy, and be developing. A massive apartment complex continuously increased, and According to this in our country heating energy consumption of a residential building is continuously increasing at country me whom was limited in order to raise efficient residential land use and diffusion ratio of house. If confirm an element to be able to reduce use of a heating energy, and there is saving possibility to parts of energy saving, this study will present the standard amount used with bases to the gas amount used for heating and Field Test data about room temperature. Execute simulation with building balance (public area, a plain), the gas amount useds such as incense of a building, indoor setting temperature ($^{\circ}C$), a position of an apartment house etc. to affect the energy amount used of a valuation object building of a variable through Field Test and research on the actual condition. Calculate the standard amount used of city gas for winter season heating of a comparative analysis apartment house to data value getting the above results through Field Test and simulations with bases.
The characteristics of DeNOx conversion process by plasma/post-heating system with the simulated gas containing ethene is investigated experimentally. Without plasma treatment, $NO-NO_2$ conversion doesn't occur by $400^{\circ}C$ in a mixture of $N_2/O_2$ with a trace gas of ethene. But $NO-NO_2$ conversion occurs as temperature increases above $400^{\circ}C$. The NO can, however, be converted to $NO_2$ at lower temperatures by treating the gas mixture with non-thermal plasma. The $NO-NO_2$ conversion enhances further by passing the plasma treated gas through the post-heating furnace. Results show that 20%${\sim}50%$ more conversion of NO to $NO_2$ is observed when the temperatures of the post-heating furnace are maintained at $300^{\circ}C$ or $400^{\circ}C$. The additional $NO-NO_2$ conversion by post-heating is due to the reaction of ethene with the byproducts or radicals generated from the plasma reaction.
Proceedings of the Korean Society for Agricultural Machinery Conference
/
2000.11c
/
pp.639-646
/
2000
Hot air heater with light oil combustion is the most common heater for greenhouse heating in the winter season in Korea. However, since the heat efficiency of the heater is about 80%, considerable unused heat in the form of exhaust gas heat discharges to atmosphere. In order to capture this exhaust gas heat a heat recovery system for plant bed heating in the greenhouse was built and tested in the hot air heating system of greenhouse. The system consists of a heat exchanger made of copper pipes, ${\phi}\;12.7{\times}0.7t$ located inside the rectangular column of $330{\times}330{\times}900mm$, a water circulation pump, circulation plastic pipe and a water tame The total heat exchanger area is $1.5m^2$, calculated considering the heat exchange amount between flue gas and water circulated in the copper pipes. The system was attached to the exhaust gas path. The heat recovery system was designed as to even recapture the latent heat of flue gas when exposing to low temperature water in the heat exchanger. According to performance test it can recover 45,200 to 51,000kJ/hr depending on the water circulation rates of 330 to $690{\ell}$/hr from the waste heat discharged. The exhaust gas temperature left from the heat exchanger dropped to $100^{circ}C$ from $270^{circ}C$ by the heat exchange between the water and the flue gas, while water gained the difference and temperature increased to $38^{circ}C$ from $21^{circ}C$ at the water flow rate of $690{\ell}$/hr. And, the condensed water amount varies from 16 to $43m{\ell}$ at the same water circulation rates. This condensing heat recovery system can reduce boiler fuel consumption amount in a day by 34% according to the feasibility study of the actual mimitomato greenhouse. No combustion load was observed in the hot air heater.
We measured the efficiency and flue gas concentration of a 90kW woodchip boiler which is for heating water of lodging. At nominal operating condition, the fuel, woodchip is fed into the boiler at a rate of 22.6 kg/h. In order to determine the efficiency of the boiler, we measured the water flow rate, woodchip flow rate, heating value and water content of woodchip, temperature of inlet and outlet of heating water. The results of test show that the power output of the woodchip boiler is 90.0 kW(77,400 kcal/h) and the thermal efficiency of the boiler is 88.5%. By using a gas analyser, flue gas concentrations are measured. The results show that O2 in the flue gas is 10.2%, CO concentration is 393 ppm and NOx concentration is 74 ppm.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.