• Title/Summary/Keyword: Gas Supply System

Search Result 602, Processing Time 0.031 seconds

Stabilization of Fuel F1ow in a Multi-Nozzle Combustion System Burning Natural Gas (천연가스 다노즐 열원설비의 연료 유동 안정화)

  • 박의철;차동진
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.13 no.12
    • /
    • pp.1255-1265
    • /
    • 2001
  • A numerical study has been conducted to characterize the transient flow in a utility gas turbine burning natural gas. The solution domain encompasses the supply gas pressure regulator to the combustor of the gas turbine that employs multi-nozzle fuel injectors. Some results produced for verification in the present study agree suite well with the experimental ones. It is found that the total gas flow may decrease noticeably during its combustion mode change, which would be the reason of momentary combustion upset, when a reference case of opening ratios of control valves in the system is applied. Several parameters are then varied in order to make the total gas flow stable over that period of time. Results of this study may be useful to understand the unsteady behavior of combustion system burning natural gas.

  • PDF

Effect of Carbon Capture Using Pre-combustion Technology on the Performance of Gas Turbine Combined Cycle (연소전 처리를 이용한 탄소포집이 가스터빈 복합화력 플랜트의 성능에 미치는 영향)

  • YOON, SUKYOUNG;AHN, JIHO;CHOI, BYEONGSEON;KIM, TONGSEOP
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.27 no.5
    • /
    • pp.571-580
    • /
    • 2016
  • In this paper, performance of the gas turbine combined cycle(GTCC) using pre-combustion carbon capture technology was comparatively analysed. Steam reforming and autothermal reforming were used. In the latter, two different methods were adopted to supply oxygen for the reforming process. One is to extract air form gas turbine compressor (air blowing) and the other is to supply oxygen directly from air separation unit ($O_2$ blowing). To separate $CO_2$ from the reformed gas, the chemical absorption system using MEA solution was used. The net cycle efficiency of the system adopting $O_2$ blown autothermal reforming was higher than the other two systems. The system using air blown autothermal reforming exhibited the largest net cycle power output. In addition to the performance analysis, the influence of fuel reforming and carbon capture on the operating condition of the gas turbine and the necessity of turbine re-design were investigated.

Case study on operating characteristics of gas fueled ship under the conditions of load variation

  • Chun, Jung-Min;Kang, Ho-Keun;Kim, You-Taek;Jung, Mun-Hwa;Cho, Kwon-Hae
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.40 no.5
    • /
    • pp.447-452
    • /
    • 2016
  • The use of gas as fuel, particularly liquefied natural gas (LNG), has increased in recent years owing to its lower sulfur and particulate emissions compared to fuel oil or marine diesel oil. LNG is a low temperature, volatile fuel with very low flash point. The major challenges of using LNG are related to fuel bunkering, storing, and handling during ship operation. The main components of an LNG fuel system are the bunkering equipment, fuel tanks, vaporizers/heaters, pressure build-up units (PBUs), and gas controlling units. Low-pressure dual-fuel (DF) engines are predominant in small LNG-powered vessels and have been operating in many small- and medium-sized ferries or LNG-fueled generators.(Tamura, K., 2010; Esoy, V., 2011[1][2]) Small ships sailing at coast or offshore rarely have continuous operation at constant engine load in contrast to large ships sailing in the ocean. This is because ship operators need to change the engine load frequently due to various obstacles and narrow channels. Therefore, controlling the overall system performance of a gas supply system during transient operations and decision of bunkering time under a very poor infrastructure condition is crucial. In this study, we analyzed the fuel consumption, the system stability, and the dynamic characteristics in supplying fuel gas for operating conditions with frequent engine load changes using a commercial analysis program. For the model ship, we selected the 'Econuri', Asia's first LNG-powered vessel, which is now in operation at Incheon Port of South Korea.

Development of Supply Capability Calculation and Prediction Technology for Generator (발전기 공급능력 산정 및 예측 기술개발)

  • Kim, Euihwan;An, Youngmo;Hong, Eunkee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.425-431
    • /
    • 2016
  • Supply Capability of the generator, if the maximum demand occurs, refers to the maximum power that can be stably supplied and it is possible to maintain stable power supply to be greater than actual load. However, unexpected power demand and reduction in supply Capability due to stop of unexpected generator in operation can temporarily make a big chaos in power system. In fact, due to a lack of power supply Capability in the country, enforced emergency load adjustment to the September 15, 2011, the circulation power outage has occurred in several cities. As the result, interrupted operation of the elevator and stopped hospital medical equipment led to a great deal of trouble to people's lives, causing a social problem. At that time, it was found that a failed frequency control because of smaller actual supply Capability than that of predicted. The difference was about 1,170 MW with Gas turbine power plant. By accurately calculating the generator supply capability, we can not only grasp the power reserve rate, but also correspond to the time of power supply instability.

A study on the Internal Flow Analysis of Gas Cylinder Cabinet for Specialty Gas of Semiconductor (반도체용 특수가스 공급을 위한 가스캐비닛 내부 유동해석에 관한 연구)

  • Kim, Jung-Duck;Han, Seung-A;Yang, Won-Baek;Rhim, Jong-Guk
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.5
    • /
    • pp.74-81
    • /
    • 2020
  • In general, when manufacturing a semiconductor, a number of hazardous and dangerous substances such as flammability, toxic, and corrosiveness are used. In particular, semiconductors are manufactured using specialty gas in processes such as CVD and etching. The specialty gas is filled in a container in the state of compressed or liquefied gas, and a gas cylinder cabinet is used as a facility for supplying this specialty gas to the semiconductor manufacturing process. When a accident occurs in the gas supply system, gas is released through a pressure release device installed in the gas cylinder to secure the safety of the supply system. In this case, the gas released inside the gas cabinet, there is a risk of leaking to the outside. After that, by analyzing the gas flow in the gas cabinet, it is intended to identify the risk associated with leak and to provide measures to prevent accidents.

Risk Assessment Technique for Gas Fuel Supply System of Combined Cycle Power Plants (I) : Based on API RBI Procedures (복합화력발전의 가스연료 공급계통에 대한 위험도 평가 기법 연구 (I) : API RBI 절차에 기반한 위험도 평가)

  • Song, Jung Soo;Yu, Jong Min;Han, Seung Youn;Choi, Jeong Woo;Yoon, Kee Bong
    • Journal of Energy Engineering
    • /
    • v.27 no.2
    • /
    • pp.1-13
    • /
    • 2018
  • The proportion of natural gas-fueled power generation is expanding due to the change of domestic energy policy pursuing reduction of dust and increasing clean energy consumption. Natural gas fuels used for the combined-cycle power plants and the district-heating power plants are operated at high temperature and high pressure in the fuel supply system. Accidents due to leakage of the gas such as fire and explosion should be prevented by applying risk management techniques. In this study, risk assessment was performed on the natural gas fuel supply system of a combined power plant based on the API RP 581 RBI code. For the application of the API RBI code, lines and segments of the evaluation target system were identified. Operational data and input information were analyzed for the calculations of probability of failure and consequence of failure. The results of the risk assessment were analyzed over time from the initial installation time. In the code-based evaluation, the gas fuel supply system was mainly affected by thinning, external damage, and mechanical fatigue damage mechanisms. As the operating time passes, the risk is expected to increase due to the external damage caused by the CUI(Corrosion Under Insulation).

A Study of Generator Excitation System for first Power Supply to gird line (가스터빈 시송전 발전기 여자시스템에 관한 연구)

  • Ryu, Ho-Seon;Lim, Ick-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1193-1194
    • /
    • 2011
  • We performed commissioning of redundant digital excitation system for gas turbine generator. One of its issues is first power supply test to gird line when it was compared with the other commissioning. If blackout will be happened, a few of start power plants must supply power to grid line. And then generator must increase voltage and real power slowly for line charge. The trial product was installed and successfully operated at a 100MW power plant after commissioning.

  • PDF

Water Vapor Supply Study for Air and Carbon dioxide (공기와 이산화탄소 가스에 수분공급을 위한 연구)

  • Lee, Taeck Hong;Park, Tae Seong;Kim, Tae Wan;Noh, Jae Hyun;Kang, Young Jin;Lee, Seung Yong
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.25 no.1
    • /
    • pp.72-78
    • /
    • 2014
  • The study has been designed to develop water vapor supply for semiconductor industry, industrial gas manufacturing, impurities analysis, and fuel cell. Water concentration in air reached $1019{\mu}mol/mol$ at dew temp ($-20^{\circ}C$) and water concentration in CO2 reached $127{\mu}mol/mol$ at dew temp ($-40^{\circ}C$. Carbon dioxide needs more wet gas than air because interaction potential of carbon dioxide shows more strong attraction than air.

Optimum Design Method for Pressure-reducing System using High-pressure Gas (고압가스감압시스템 최적화 설계기법)

  • Chung, Yong-Gahp;Cho, Nam-Kyung
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.748-751
    • /
    • 2010
  • To launch rocket on launch pad, propellants and gases are charged into the rocket by remote control system. Using pneumatic pressure-reducing regulators, kinds of gases with various pressure levels are supplied into launch pad. As most of operations for launching the vehicle are remotely controled in the launch control room, pressure pulsations due to rapidly gas supply at the upstream of regulators can make the required operating pressure range missed and cause damage to the regulators. In this paper, the optimum design methods of pressure regulators of pressure-reducing system on launch pad using high-pressure gases were investigated to solve the aforementioned problems and for stable gas supply to launch pad.

  • PDF