• Title/Summary/Keyword: GROUND/POWER PLAN

Search Result 41, Processing Time 0.027 seconds

The Effects of Sand Compaction by Watering through Field Compaction Test and Numerical Analysis (현장 및 수치해석을 통한 모래 물다짐지반의 다짐효과 연구)

  • Chun, Byungsik;Jang, Younsoo;Kim, Kwanggyu;Park, Dukhyum;Sung, Hwadon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.13-19
    • /
    • 2007
  • This study examines a cause for damage of synthetic resins straight pipe occurred after pipe construction of underground electric power duct pipelines of ${\bigcirc}$ section work, ${\bigcirc}$ line, ${\bigcirc}{\bigcirc}$ city railroad. For this, we analyzed a parameter used for plan and structural analysis through a literature review. And the site condition was analyzed in detail, and test construction of the pipe line that simulated the site pipe line and test on compaction by watering were performed. In addition, an examination on subsurface settlement influence of foundation ground through a structural safety and a numerical analysis of power transmission pipe line was performed. As a result of the performance, relative density gained by compaction by watering was more than average and relative degree of compaction according to technical specification standard showed the result of about 90% in the case of good compaction by watering.

  • PDF

Development of sequential sampling plan for Frankliniella occidentalis in greenhouse pepper (고추 온실에서 꽃노랑총채벌레의 축차표본조사법 개발)

  • SoEun Eom;Taechul Park;Kimoon Son;Jung-Joon Park
    • Korean Journal of Environmental Biology
    • /
    • v.40 no.2
    • /
    • pp.164-171
    • /
    • 2022
  • Frankliniella occidentalis is an invasive pest insect, which affects over 500 different species of host plants and transmits viruses (tomato spotted wilt virus; TSWV). Despite their efficiency in controling insect pests, pesticides are limited by residence, cost and environmental burden. Therefore, a fixed-precision level sampling plan was developed. The sampling method for F. occidentalis adults in pepper greenhouses consists of spatial distribution analysis, sampling stop line, and control decision making. For sampling, the plant was divided into the upper part(180 cm above ground), middle part (120-160 cm above ground), and lower part (70-110 cm above ground). Through ANCOVA, the P values of intercept and slope were estimated to be 0.94 and 0.87, respectively, which meant there were no significant differences between values of all the levels of the pepper plant. In spatial distribution analysis, the coefficients were derived from Taylor's power law (TPL) at pooling data of each level in the plant, based on the 3-flowers sampling unit. F. occidentalis adults showed aggregated distribution in greenhouse peppers. TPL coefficients were used to develop a fixed-precision sampling stop line. For control decision making, the pre-referred action thresholds were set at 3 and 18. With two action thresholds, Nmax values were calculated at 97 and 1149, respectively. Using the Resampling Validation for Sampling Program (RVSP) and the results gained from the greenhouses, the simulated validation of our sampling method showed a reasonable level of precision.

소형위성 ETB에서의 전력계 기능시험

  • 윤영수;박종오;최종연;권재욱;안재철;조승원;김영윤
    • Bulletin of the Korean Space Science Society
    • /
    • 2003.10a
    • /
    • pp.91-91
    • /
    • 2003
  • 위성을 발사하기 전까지는 지상에서 EGSE(Electrical Ground Support Equipment)를 이용하여 충분한 시스템 단위의 위성체 기능 시험을 수행한다. KOMPSAT-2(Korea Multi-Purpose Satellite - 2)와 같은 소형 위성의 서브시스템 각각이 요구사항에서 제시하는 규격을 만족하는지 여부를 점검하는 단계에서 전력계 관련 서브시스템의 기능 시험도 EPS(Electrical Power Subsystem) Test Plan에 의해 순차적으로 수행한다. KOMPSAT-2 ETB(Engineering Test Bed)에서의 전력계 시험은 먼저 Test Fuse Modules Check를 수행하였다. 퓨즈 모듈은 PCU(Power Control Unit) 상에 설치되어 있는 장치로써 퓨즈 모듈의 입력과 출력 사이에 도통성 및 다른 출력과의 절연성을 검증한다. 다음으로 EGSE 중 PMTS(Power Monitor Test Set)와 PCU와의 직렬 인터페이스를 점검하는 PCU Interface Check를 수행하였다 시험절차서에 따라 PCU가 가지는 릴레이 스위치에 대하여 명령어를 보내어 릴레이의 동작 상태 및 출력 전압 등을 점검한다. 다음 단계에서는 DC Integration을 수행하여 ETB 하니스 중 전원 관련 라인을 점검하였다 PCU는 모든 위성체 하드웨어에 전력을 공급하는 장비로써 과전력으로부터 하드웨어를 보호하기 위하여 하니스를 연결하기 전에 우선적으로 시험한다. 다음으로는 ECU(EPS Control Unit)가 각각에 해당하는 하드웨어에 명령어를 보내어 전력계 전체적인 동작 상태 검증하는 EPS Hardware Command & Telemetry Checkout을 수행하였다. ECU는 전력계의 모든 하드웨어를 제어하고 그 상태를 모니터링하는 기능을 한다. PCU와의 인터페이스를 통하여 전력의 제어 및 분배에 관련되는 특성을 제어 및 모니터하며 DDC(Deploy Device Controller)는 ECU로부터 명령어를 받아서 arm 및 safe 상태에 대한 텔리 메트리 데이터를 제공한다 그리고, SAR(Solar Array Regulator)는 ECU로부터 Bypass Relay 및 ARM Relay에 관한 명령어를 받아 수행되며 그에 따른 텔리 메트리 데이터를 제공한다. 마지막으로 EPS 소프트웨어를 검증하는 EPS Software Verification을 수행하였다 전력계 소프트웨어의 설계의 검증 부분은 현재 설계 제작된 전력계 .소프트웨어의 동작 특성 이 위성 의 전체 운용개념과 연계하여 전력계 소프트웨어가 전력계 및 위성체의 요구조건을 만족시키는지를 확인하는데 있다. 전력계 운용 소프트웨어는 배터리의 충ㆍ방전을 효율적으로 관리해 3년의 임무 기간동안 위성체에 전력을 공급할 수 있도록 설계되어 있다

  • PDF

Power Save of Marine Tracker Buoy System Based on NB-IoT for Identification of Fishing Gear (어구 자동 식별을 위한 NB-IoT 기반의 해양 트래커 부이 시스템의 전력 절감)

  • Nam, Sung-Il;Kim, Min-Hoon
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.6
    • /
    • pp.545-550
    • /
    • 2018
  • Ministry of Oceans and Fisheries declared action plan for the electric fishing gear using real name in order to prevent overusing the fishing gear and to reduce discarded fishing gear. It is needed for a technique that can efficiently transmit the information including the type and location of the fishing gear and the user's real name to the fishing boat and the control center using IoT-based communication. The marine tracker buoy system, which is placed on the water for a long time, transmit the position data and the state data of the buoys to the control center in the ground by using NB-IoT channels. In this paper, we propose the algorithm for the low-power operation of the marine tracker buoy system is proposed and test results of current consumption in the marine tracker buoy system with the proposed algorithm is investigated.

The Study on the Characteristics of Puyeo district's Buddhist Temple Architechture in Sabi dynasty - Focus on the plot plan for a tower on Flatland - (사비시대 부여지역 가람건축의 특성에 관한연구 - 평지 1탑식 가람을 중심으로 -)

  • Lee, Dong-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.2
    • /
    • pp.71-78
    • /
    • 2011
  • The main characteristic of one tower style temple on flatland, as a type of early buddhist temple, is to have been built on level ground near the capital city with their intent to be connected with power group in those days. Two kind of one tower temples on flatland had mostly been constructed: Wondang(longing temple) and National temple, and they greatly contributed to popularization of Buddhism. So, the purpose of this study is to analyze the examples of one tower temple plot planning made by centering around Puyeo district of Sabi dynasty, and in another aspects, examine the influence on our traditional temple architecture and the meaning of Korean traditional architecture, because it is the most important thing among Korean traditional architecture. This study is significant because we have researched in the documents and fruit of an excavation about one tower style temple in Puyeo district in Sabi dynasty, so it will be helpful in studying Buddhist temple architecture system in Puyeo district in Sabi dynasty.

Development of 3D Underground Information Construction and Visualization System Based on IUGIM (지하공간통합지도 기반 3차원 지하정보 구축 및 가시화시스템 개발)

  • Kang, Kyung Nam;Kim, Wooram;Hwang, Seung Hyun;An, Joon Sang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.497-505
    • /
    • 2021
  • Due to recent underground space accidents, are a frequent occurence in Korea, the government established the basic plan for the construction of the IUGIM (Integrated Underground Geospatial Information Map) in 2015 as a measure for safety management of underground spaces. The development of IUGIM was partially completed as of 2021. The underground space management entity and related organizations are utilizing it. This study is being carried out as part of a plan to improve the usability of IUGIM, and to build a visualization system that compares real-time field data with stored data. A system, equipped with a visualization function for borehole data and 6 types of underground facilities built and managed on IUGIM; a tool capable of comparative analysis with real-time data measured in the field, is being built. The 6 types of underground facilities are water supply pipe, sewage pipe, power pipe, gas pipe, communication pipe, and heating pipe. The completed system was demonstrated at three locations in Seocho-gu, Gangnam-gu in Seoul. The field demonstration was carried out by accessing the mobile center and downloading IUGIM data, visualizing IUGIM data (surface creation, borehole information, underground facilities), and visualizing the GPR(Ground Penetrating Radar)-based data acquired at the field. As a result of the empirical results of IUGIM data and GPR-based field data, it was judged to be suitable. As a result of this study, it is judged that it can be helpful for safe construction at the excavation site.

The Progress of Fast Reactor Technology Development in China

  • Yang, Hong-Yi;Xu, Mi
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.02a
    • /
    • pp.220-237
    • /
    • 2004
  • China, as a developing country with a great number of population and relatively less energy resources, reasonably emphasizes the nuclear energy utilization development. For the long term sustainable energy supply, as for nuclear application the basic strategy of PWR-FBR-Fusion has been settled and envisaged. Due to the economy and experience reasons the nuclear power and technology development with a moderate style are kept in China up to now. In China mainland apart from two NPPs with the total capacity of 2.1 GWe in operation, four NPPs are under construction and two NPPs are planned for the Tenth Five Year Plan(2001-2005). Also another one or two NPPs are still in discussion. It could be foreseen that the total nuclear power capacity will reach 8.5GWe before the year 2005 and 14-15 GWe before 2010 respectively. As the first step for the Chinese fast reactor engineering development the 65MWt China Experimental Fast Reactor(CEFR) is under construction. The main components of primary, secondary and tertiary circuits and of fuel handling system have been ordered. The reactor building under construction has reached the top namely 57m above the ground. More than one hundred components and shielding doors have been installed. It is planned that the construction of reactor building with about 40,000$m^2$ floor surface will be completed in the end of the year 2002 and envisaged that the first criticality of the CEFR will be in the end of 2005. The second step of the Chinese fast reactor engineering development is a 300MWe Prototype Fast Breeder Reactor which is only under consideration up to now. Some important technical selections have been settled, but its design has not yet started.

  • PDF

Development of Korean Warrior Platform Architecture (한국형 워리어플랫폼 아키텍처 개발 연구)

  • Kim, Wukki;Shin, Kyuyong;Cho, Seongsik;Baek, Seungho;Kim, Yongchul
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.5
    • /
    • pp.111-117
    • /
    • 2021
  • With the rapid development of advanced science and technology including the 4th industrial revolution, the future battlefield environment is evolving at a rapid pace. In order to actively respond to issues such as reduction of military resources and shortening of service period, and to emphasize the realization of human-centered values, the Ministry of National Defense is re-establishing the role of the Army in accordance with the defense reform and is promoting the Warrior Platform, a next-generation individual combat system. In this paper, we intend to present the optimal warrior platform architecture suitable for the Korean Army by realizing the concept of future ground operations and analyzing overseas cases. We analyze the essential abilities required of individual combatants and the abilities required for each unit type, and specifically presents a plan for integration and linkage of warrior platform equipment. We also propose an efficient business promotion direction by presenting the data flow and power connection diagram between the devices that need integration and interworking.

A Study on the Selection of New Town Area Using GIS -in Mongolia - (GIS를 이용한 신도시개발 가능지역 선정 연구 -몽골지역을 대상으로-)

  • Choi, Byoung-Gil;Na, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.2
    • /
    • pp.273-280
    • /
    • 2010
  • This study aims to research into a plan for the spatial design on the major facilities in new-town region in Mongolia by using the spatial analytical technique in GIS. In case of Mongolian region, the demand for new-town development is rapidly increasing around Ulaanbaatar, where is the capital. On the other hand, the adequately relevant ground or the spatial-design technique is failing to be applied. This study extracted the region available for developing new down by using spatial analytical technique in GIS, and researched into the spatial-design plan for housing complex, filtration plant, sewage disposal plant, power plant, general park, crematory. The housing complex in the targeted region could be known to be adequate to be positioned around watercourse and road. It could be known to be adequate for filtration plant, which is the source of drinking water, to be located in the upper-stream region of a river, which is secured good quality of water, and for sewage disposal plant to be located in the lower-stream region available for minimizing occurrence of contamination. It is judged to be required for a proposed site of power plant to be located in the upper-stream region, for the park unit, which is space of the living culture, to be repaired and expanded the existing facilities, and for traffic network to be expanded through predicting demand along with new-town development. It is judged to be probably needed to be reflected even the flexible aspect for changing design through surveying the feasibility and economic efficiency on the future spatial design.

Comparative Analysis of Structural Damage Potentials Observed in the 9.12 Gyeongju and 11.15 Pohang Earthquakes (9.12 경주지진 및 11.15 포항지진의 구조손상 포텐셜 비교연구)

  • Lee, Cheol-Ho;Kim, Sung-Yong;Park, Ji-Hun;Kim, Dong-Kwan;Kim, Tae-Jin;Park, Kyoung-Hoon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.175-184
    • /
    • 2018
  • In this paper, comparative analysis of the 9.12 Gyeongju and 11.15 Pohang earthquakes was conducted in order to provide probable explanations and reasons for the damage observed in the 11.15 Pohang earthquake from both earthquake and structural engineering perspectives. The damage potentials like Arias intensity, effective peak ground acceleration, etc observed in the 11.15 Pohang earthquake were generally weaker than those of the 9.12 Gyeongju earthquake. However, in contrast to the high-frequency dominant nature of the 9.12 Gyeongju earthquake records, the spectral power of PHA2 record observed in the soft soil site was highly concentrated around 2Hz. The base shear around 2 Hz frequency was as high as 40% building weight. This frequency band is very close to the fundamental frequency of the piloti-type buildings severely damaged in the northern part of Pohang. Unfortunately, in addition to inherent vertical irregularity, most of the damaged piloti-type buildings had plan irregularity as well and were non-seismic. All these contributed to the fatal damage. Inelastic dynamic analysis indicated that PHA2 record demands system ductility capacity of 3.5 for a structure with a fundamental period of 0.5 sec and yield base shear strength of 10% building weight. The system ductility level of 3.5 seems very difficult to be achievable in non-seismic brittle piloti-type buildings. The soil profile of the PHA2 site was inversely estimated based on deconvolution technique and trial-error procedure with utilizing available records measured at several rock sites during the 11.15 Pohang earthquake. The soil profile estimated was very typical of soil class D, implying significant soil amplification in the 11.15 Pohang earthquake. The 11.15 Pohang earthquake gave us the expensive lesson that near-collapse damage to irregular and brittle buildings is highly possible when soil is soft and epicenter is close, although the earthquake magnitude is just minor to moderate (M 5+).